ML17285A193
| ML17285A193 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/31/1988 |
| From: | Hutchison L, Powers C WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8901200224 | |
| Download: ML17285A193 (7) | |
Text
'ACCKMRATED DISTRIBUTION DEMONSTRA,TION SYSTEM REGULAT(Q INFORMATION DISTRIBUTIONOISTEM (RIDE)
SUCCESSION NB/:8901200224 DOC.DATE: 89)~~
NOTARIZED:
NO DOCKET N
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Dec 1988.W 890110 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
(
ENCL /
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PDS LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR DREP RPB 10 REG F
E 01 EXTERNAL: EG&G SIMPSONFF LPDR NSIC COPIES LTTR ENCL 1
0 1
0 10 10 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 EGGG WILLIAMSFS NRC PDR COPIES LTTR ENCL 5
5 1
1 2
2 1
1 1
1 1
1 1
1 1
1 NOTE IO ALL "RIDS" R1KIPIENIS:
PLEASE'HELP US IO REDUCE %AcBBE!
CXRKACI'IHE DOCUMENTS CCATSL DESK KjOM Pl-37 (EXT. 20079)
TO EIZMZNAXH YOUR MHE FR% DISTRIBUTION LISTS XQR DOCGMENX8 YOU DGNFT NEEDf TOTAL NUMBER OF COPIES REQUIRED:.LTTR 32 ENCL 30
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No. 50-397 January 10, 1989 U.S. Nuclear, Regulatory Commission Document Control Desk Washington, D:C. 20555
Dear.,
Sir,:
SUBJECT:
NUCLEAR PL'ANT NO.
2 MONTHL'Y OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, December, 1988 as required by our, Technical Specifications 6.9.1.6.
Very Tr,uly Your,,s, OAA.
C.
M. Powers (N/D 927M)
WNP-2 Plant Manager, CMP/lc Enclosure cc:
Nr,. J.
B. Martin Mr.. C. J.
Bosted Ns. Dottie Sherman Nr,. J. T. Wheelock Mr,.
W.
H. Lovelace NRC Region V
NRC Site Representative (901A)
ANI; Farmington CT INPO NRC; Washington D.C.
PDR 0224 890loe 890laa R
ADocK asooo39 PNU
I l
k o
e s
~
II
DOCKET NO.
50-397 LNIT tlAttE DATE REHHT PERIOD ~
19~
t>nK lief i&>n~ mXXH
~>" 1iV 88-15 12/1/8'8 F
208.9 A
1 88-037
~Y~ii! tEliT SA VALVEX B PLANT WAS SHUTDOWN DUE TO AIR LEAKAGE THROUGH CONTAINMENT SUPPLY PURGE VALVE (CSP-V-9)
EXCEEDING TECH SPEC LIMITS.
DAMAGED SEATS WERE REPLACED ON CSP=V-9 AND CSP-V"5.
ALSO MSIV (MS"V"28A)
STUCK WHILE OPENING AND REQUIRED REPAIRING BEFORE~
RETURNING PLANT TO SERVICE.88-16P 12/12/88 S
0 88-17P 12/30/88 S
0 RB CONROD.
REDUCED POWER TO PERFORM A SCHEDULED CONTROL ROD SEQUENCE EXCHANGE RB CONROD
'EDUCED POWER TO RESET CONTROL RODS FOR 100$
POWER SUhgtARY WNP-2 INCURRED 1 FORCED OUTAGE AND 2 POWER REDUCTIONS IN DECEMBER AS DESCRIBED ABOVE.
TYPE F-Forced S-Sctlcd A-Equip Failure 0-htaint or Test
~
C-Ref ue ling 0-Regulatory Res triction E-Operator Training h License Examination F-Admin G-Oper Error H-Other t tETt tCG 1-Manual 2-htanual Scram 3-Auto Scram 4-Continued sUleduced Load 9-Ott>er SYSTEM h COMPOM.:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Report (LiER) File (NUAEG-0161)
AVERAGE DAILY UNIT POWER LEVEL MONTH DECEMBER DOCKET NO.
UNIT COMPLETED BY TELE HONE~
2.
3.
5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
16.
DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 596 894 633 836 1016 1076 1054 17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 1056 1078 1077.
1076 1078 1073 1053 1032 1077 1080 1071 1072 1071 852 723 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100K line (or the restricted power level line).
In such
- cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
't v
QPERATING DATA REPORT NNP-2 j'1-Jan-89 i.
DOCKET: 50-397 2.
REPORTING PERIOD:
3 UTILITY CONTACTS Dec-88 OUTAGE + QN-LINE HOURS LEONARD HUTCHISON (509) 377-2486 744 4.
LICENSED THERMAL PONER (MNt):
5.
NAMEPLATE RATING (GROSS MNe):
6.
DESIGN ELECTRICAL RATING (NET MNe)."
7 MAXIMUM DEPENDABLE CAPACITY (GROSS MNe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
3323 1200.,9 1100 1140 10'P5 9
IF CHANGES OCCUR ABOVE SINCE LAST REPORT~
GIVE REASONS:
10.
PONER TO WHICH RESTRICTED ~ IF ANY (NET MMe) 1 1-REASONS FQR RESTRICTIONS~
IF ANYc N/A N/A 12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDNN HRS 15.
HRB GENERATOR ON LINE ib. UNIT RESERVE SHUTDQNN HOURS 17 GROSS THERMAL ENERGY (MNH) 18.
GROSS ELECTRICAL ENERGY (MNH) 1'P.
NET ELECTRICAL ENERGY (MNH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23 UNIT CAPACITY FACTOR '(DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744 567.3 0.0 535. 1 0.0 1615200 537530 517458
- 71. 9/
- 71. 9%
, 63. 5/
- 63. 2/
- 28. 1/
208. 9 YEAR CUMULATIVE 8784 35504.2 6310.8 26217.6
- 0. 0 340. 4 6022.7 25164 6
0 0 381.7 18728438 69111205 6216360
- 23033500, 6000356 22168308 68.6/
70.9%
68.6/
72.0%
- 62. 4%
- 57. 0%
62.1%
56.8%
14.8/
9.7%
1046.5 '691.6 26.
SHUTDQNNB SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE~DURATION):
REFUELIHG OUTAGE FOR $$ PjQQ
$QfQ'ggg QJ,~
27.
IF CURRENTLY SHUTDONN ESTIMATED STARTUP DATE:
r V
r<<j V>>
V>>
W tr'l
'W<4 jl'Q")Qd)g(t+
l'1 'j'1 Ir<<
'I I
~h>>
W
~,
lI CI 'Wg f lj
';"WW'>;3.>P "Ir>>W
(
<<IS>>
'I I
II
't
<<<<W l uj ',1)
'. N>
'W;,t< "" rk~j "j r.
~ g II
'W W 'jj>>
g
- 1 '( I II EDIWV Wf<< '
Wr PWID 1 ",,>, '~r, '"W W
r j '>> ~,-W'j d I 1
<>JW 1
W!J.3
l
l I'iI W'Y
. -'I"ji 1" If 1
r I Ihrl
<<,l, I
~
~
.qh,rW 1> ~
h rry>>.y i 1
1, I (
f'
' I
<<X,1 If'.
(> ~
c
~'
. >>I R
<<4'U".'V-D 4>h.
p D
I I
I
, ~j <<-;
1 i'
W t
<<t.
W'D>>.P4" I 1
D' df 1
>>J II(<< =
~
fjW
<> 0 r
II I
I I,
~
Wcjrj j ct
,,)W<<<<j 1
'h j
jfWjr R
) ~
jf
( -) I' R.=WL<<
)
w'k" j '.
W W.
3 l 4 W.
)
htf 1"r
~
I R
vfrf W'g l'g, j 1 1>>
<<W 1
,r", jt L
RI
'r lr
~'ll r j<<.I rl c,
~y
~
rt
=,
W,
~<<IW
~ w
'W j-y 1 rwl ~j' I