- PNO-V-89-006, on 890111,plant Shutdown Required by Tech Specs Due to Inoperable motor-driven Auxiliary Feedwater Pump.Pump Motor Sent to Offsite Facility for Repair & Possibly Rewinding + (ML13302B686)
- PNO-V-89-014, on 890209,panel Annunciators Illuminated Before Startup Which Indicated Core Protection Calculators to Be Inoperable,But Crew Observed That Console Indications Were Normal.Licensee Investigation Still in Progress + (ML13302B697)
- ML13302B700 + (ML13302B700)
- PNO-V-89-028, on 890512,primary-to-secondary Leak Rate of 117 Gallons Per Day Occurred.On 890513,steam Generator Blowdown Radiation Monitor Indication Increased One Decade.Reactor Shut Down & mid-loop Will Be Drained to Repair Leaking Tube + (ML13302B717)
- ML13302B750 + (ML13302B750)
- PNO-V-89-068, on 891201,hydrogen Fire in Radwaste Bldg Occurred During Changeout of Relief Valve on Waste Gas Decay Tank.No Injury or Equipment Damage Occurred.Cause Evaluation Being Conducted Prior to Resuming Work on Sys + (ML13302B760)
- ML13302B768 + (ML13302B768)
- ML13302B800 + (ML13302B800)
- ML13302B801 + (ML13302B801)
- ML13302B804 + (ML13302B804)
- ML13302B806 + (ML13302B806)
- ML13302B811 + (ML13302B811)
- ML13302B816 + (ML13302B816)
- ML13302B822 + (ML13302B822)
- ML13302B829 + (ML13302B829)
- ML13302B831 + (ML13302B831)
- ML13302B835 + (ML13302B835)
- ML13302B851 + (ML13302B851)
- ML13302B858 + (ML13302B858)
- ML13302B869 + (ML13302B869)
- DCL-13-103, Response to NRC Request for Additional Information Regarding Implementation of Multi-Unit/Multi-Source Dose Assessment Capability + (ML13302B875)
- ML13302B891 + (ML13302B891)
- ML13302B892 + (ML13302B892)
- ML13302B893 + (ML13302B893)
- ML13302B895 + (ML13302B895)
- ML13302B896 + (ML13302B896)
- ML13302B902 + (ML13302B902)
- NRC-2013-0245, Confirmatory Order Modifying License + (ML13302B902)
- ML13302B903 + (ML13302B903)
- ML13302B911 + (ML13302B911)
- ML13302B922 + (ML13302B922)
- ML13302B923 + (ML13302B923)
- ML13302B924 + (ML13302B924)
- ML13302B926 + (ML13302B926)
- ML13302B928 + (ML13302B928)
- ML13302B930 + (ML13302B930)
- ML13302B931 + (ML13302B931)
- ML13302B932 + (ML13302B932)
- ML13302B933 + (ML13302B933)
- ML13302B934 + (ML13302B934)
- ML13302B936 + (ML13302B936)
- ML13302B937 + (ML13302B937)
- ML13302B946 + (ML13302B946)
- Press Release-I-13-037, NRC Assigns New Resident Inspectors to Susquehanna Nuclear Power Plant + (ML13302B947)
- ML13302B949 + (ML13302B949)
- ML13302B952 + (ML13302B952)
- ML13302B954 + (ML13302B954)
- ML13302B956 + (ML13302B956)
- ML13302B957 + (ML13302B957)
- ML13302B959 + (ML13302B959)
- Press Release-II-13-061, NRC to Hold Meeting on Planned Modifications at Duke Energy Nuclear Power Plants + (ML13302B961)
- ML13302B964 + (ML13302B964)