Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051930480 + (ML051930480)
- ML051930481 + (ML051930481)
- ML051930482 + (ML051930482)
- ML051930485 + (ML051930485)
- ML051930487 + (ML051930487)
- ML051930488 + (ML051930488)
- ML051930492 + (ML051930492)
- ML051930526 + (ML051930526)
- ML051930535 + (ML051930535)
- ML051930570 + (ML051930570)
- ML051930571 + (ML051930571)
- ML051940017 + (ML051940017)
- ML051940028 + (ML051940028)
- ML051940031 + (ML051940031)
- ML051940033 + (ML051940033)
- ML051940035 + (ML051940035)
- ML051940036 + (ML051940036)
- IR 05000331/2005009 + (ML051940049)
- ML051940057 + (ML051940057)
- ML051940070 + (ML051940070)
- ML051940073 + (ML051940073)
- ML051940077 + (ML051940077)
- ML051940081 + (ML051940081)
- ML051940132 + (ML051940132)
- ML051940154 + (ML051940154)
- Press Release-05-101, NRC Approves Expedited Procedures for Permitting Higher Dose Limits for Patient Caregivers + (ML051940170)
- ML051940179 + (ML051940179)
- ML051940185 + (ML051940185)
- ML051940189 + (ML051940189)
- ML051940201 + (ML051940201)
- ML051940202 + (ML051940202)
- 05000272/LER-2005-003, Regarding ECCS Leakage Outside Containment Exceeds Dose Analysis Limits (Seal Injection Filter Replacement) + (ML051940204)
- ML051940205 + (ML051940205)
- 3F0705-03, Response to Request for Additional Information Regarding Third 10 Year Inservice Inspection Program + (ML051940206)
- ML051940207 + (ML051940207)
- RNP-RA/04-0085, Spent Fuel Shipment Cancellation Notification + (ML051940262)
- ML051940267 + (ML051940267)
- 3F0705-02, Response to Request for Additional Information (RAI) Regarding the Crystal River Unit 3, 60 - Day Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections + (ML051940269)
- NL-05-088, Inservice Inspection (ISI) Second Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval + (ML051940271)
- NRC 2005-0085, Spring 2004 Unit 2 (U2R27) Steam Generator Examination Report + (ML051940273)
- L-05-114, Eleventh Refueling Steam Generator Condition Monitoring Report + (ML051940281)
- NOC-AE-05001891, License Amendment Request Proposed Change to Technical Specification 3.7.4, Essential Cooling Water System, and Associated Supported Systems Limiting Condition for Operation Action Statements + (ML051940284)
- ML051940284 + (ML051940284)
- RS-05-088, Supplemental Response to Request for Additional Information Concerning License Amendment Request - Activation of the Trip Outputs of the Oscillation Power Range Monitor System + (ML051940286)
- NOC-AE-05001901, Proposed Amendment to Technical Specification 4.0.5 for Applicability of Surveillance Requirements + (ML051940288)
- ML051940288 + (ML051940288)
- ML051940290 + (ML051940290)
- ML051940291 + (ML051940291)
- E910-05-028, Transmitting Saxton Nuclear Experimental Corporation (SNEC) 2004 Annual Report + (ML051940296)
- BW050059, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors + (ML051940300)
- ML051940301 + (ML051940301)