ML051940033

From kanterella
Jump to navigation Jump to search

SG Inspection Summary Report Draft RAI
ML051940033
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/12/2005
From: Tam P
NRC/NRR/DLPM/LPD1
To: Distel D, David Helker
Exelon Corp
References
TAC MC4619
Download: ML051940033 (2)


Text

From:

Peter Tam To:

David Distel; David Helker Date:

7/12/05 9:02AM

Subject:

SG Inspection Summary Report Draft RAI (TAC MC4619)

Dave:

Our reviewer, Emmett Murphy, has completed his initial review of your 2/24/05 submittal and found that he needs answers/clarification to a number of questions (below). Emmett will not be back in the office until after July. Please work with me to set up a conference call to discuss the following 2 questions:

1. How were the indications identified in the lower tubesheet region, including those located above the expansion region, factored into condition monitoring assessment for structural and accident leakage integrity? This description should include a description of the loads considered for the structural assessment (axail load and differential pressure) and the loads considered for the accident leakage assessment. Include the methodology for assessing accident induced leakage.
2. Were the indications in the non-expanded portion of tubing in the lower tubesheet identified with the bobbin probe or only with the MRPC? If not identified with the bobbin, should the use of MRPC in this region be expanded during future steam generator inspections?

This e-mail aims solely to prepare you and others for the requested conference call. It does not convey a formal NRC staff position, nor does it formally ask for additional information.

Peter S. Tam Senior Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation CC:

David Kern; Emmett Murphy Mail Envelope Properties (42D3BF66.237 : 10 : 20510)

Subject:

SG Inspection Summary Report Draft RAI (TAC MC4619)

Creation Date:

7/12/05 9:02AM From:

Peter Tam Created By:

PST@nrc.gov Recipients Action Date & Time David Transferred 07/12/05 09:03AM distel (David Distel) exeloncorp.com Transferred 07/12/05 09:03AM david.helker (David Helker) nrc.gov kp1_po.KP_DO Delivered 07/12/05 09:02AM DMK CC (David Kern)

nrc.gov owf2_po.OWFN_DO Delivered 07/12/05 09:02AM ELM CC (Emmett Murphy)

Post Office Delivered Route David INTernet:exeloncorp.

com exeloncorp.com kp1_po.KP_DO 07/12/05 09:02AM nrc.gov owf2_po.OWFN_DO 07/12/05 09:02AM nrc.gov Files Size Date & Time MESSAGE 2293 07/12/05 09:02AM Options Auto Delete:

No Expiration Date:

None Notify Recipients:

Yes Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard To Be Delivered:

Immediate Status Tracking:

Delivered & Opened