~3- 1 Cm Point Beach Nuclcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: April 30. 2004 Time: 140:0 Preparcr: John Olvera U I R 28 NOTE: Refer to baseprocedure NP 10.3.6for safety assessment check-list KSFidefinitions.
NOTE: WVhieneverfiuel has been remnovedfrom the reactorvessel and refueling cavity, all key safety fiunctions are GREEN except spentfiel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition
- 1. RCS Boron concentration = 31)11 ppm a.) For RSD, RCS boron >Refucling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
- 2. Number of boration paths (0-2) 1 2
- 3. Nodfuel motion (0-1) 0 3-4
- 4. SR instrumentation operable (0-1) 1 5 Cavity Boron concentration = 3004 ppm SEP' Boron concentration = 3027 ppm Subtotal = 3 CORE COOLING Subtotal Condition I. Number of SG available for DHR (0-2) 0 0-1 RED
- 2. Refueling cavity filled (0-1) 1 2
- 3. Number of trains RHR available (0-2) 1 3
- 4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TnorP =76'F; 27 days shutdown, Subtotal = 3 RCS L.evel = Rcfueling Hleight RCS Time to Boil 26.0 hrs (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 %a _
and 345 kV levels) (0-2) 2 4-5
- 2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil Ž 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 1 Subtotal = 5 INVENTORY Subtotal Condition
- 1. Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2 ORANGE
- 2. Refueling Cavity filled (see definition) (0-3) 3 3
- 3. RCS level above REDUCED INVENTORY (0-1) 1 4
- 4. Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal =. 4 Wdombon inflti record was deletd PBF- 1562 inaccordance Wti Me Freedom of InaM n
References:
NP 10.3.6 Revision 2 10/30/02 Act, exemptiors 4 Page I of 9 NP 10.2.1 ff~wCE
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition I. Containment integrity (TS 15. 1.D) (Containment 0 RED Operable) (ITS TS 3.6.1) set (Oor4) 0 __O'
- 2. Containment Closure CL-IE maintained 2-3 and closure < time to boil (Oor2) 2 4-5-6
- 3. No fuel motion (0-1) 0
- 4. DHR Capability:
- cavity flooded and internals out t=
- at least one SG available OR
- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE: Take creditforonly one P-12 independent offsite power source duringperiods of single X-03 orX.04 availability(*).
Subtotal Condition
- 1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE
- G-02 or G-01 via 2B-32 (0-1) 1 3 _yiLW
-(*) an independent off-site power source different than that for 4-5 fen Train B below (0-1) 1
- 2. 'B" SFP cooling pump available with power available from:
- G-03 or G-04 via IB42 (0-1) 1
-(*) an independent off-site power source different than that for Train A above (0-1) 1
- 3. Temporary power available to one SFP cooling pump, G-05 available, and SEP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 SFP Temperatures: Subtotal = 4 0
NW 86 F SE 82 OF SFP Average Temp 84 OF SFP Time to Boil 19.5 hrs GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD:
- 1. 1X04 to be removed from service. Currently on hold during verification of jumper points in the proceultrc.
POWER AN'AILABIILITY will remain GREEN. SFP COOLING eiill become YELLOW.
- 2. Stinip *3' Screen scheduled to le removed on or after 4/30104. INVENI'OII' will become YElk'l.OW'.
PBF-1 562
References:
NP 10.3.6 Revision 2 10130/02 Page 2 of 9 NP 10.2.1
Point Beach Nuclear Plant C
PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: April 30, 2004 TIME: 0200 KEY SAFETY FUNCTIONS:
REACTIVITY: YELLOW CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: YELLOW SFP COOLING: GREEN PROTECTED EQUIPMENT:
COMMENTS: PTh RCS Time to Boil is 26.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> SFP Time to Boil is 19.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (full core orf-load is assumed)
Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1 562
References:
NP 10.3.6 Revision 2 IL30/102 Page 5 of 9 NP 10.2.1