Browse wiki
Jump to navigation
Jump to search
ML17010A332 +
SECY-11-0093 +, SRM-COMSECY-14-0037 +, SECY-12-0025 +, ULNRC-06330, Final Safety Analysis Report Revision OL-22 and Technical Specification Bases Revision 13 +, ULNRC-06311, Final Notification of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +, ULNRC-06283, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +, ULNRC-06282, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +, ULNRC-06240, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +, ULNRC-06241, Fifth Six Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +, ULNRC-06185, Fourth Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +, ULNRC-06184, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +, ULNRC-06136, Third Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +, ULNRC-06135, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) +, ULNRC-06088, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) +, ULNRC-06087, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +, ULNRC-06024, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +, ULNRC-06008, Response to Request for Additional Information with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) +, ULNRC-05962, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (EA-12-049) +, ULNRC-05960, Ameren Missouri - Spent Fuel Pool Instrumentation Integrated Plan + and COMSECY-14-0037, Enclosure 3 - Non-Concurrence Process Record for NCP-2014-010 +
ML12054A736 +, ML12053A340 +, ML11186A950 +, ML12054A679 +, ML13234A503 +, ML14265A107 +, ML12240A307 +, ML12221A339 +, ML14083A620 +, ML14211A346 +, ML14309A256 +, ML15089A236 +, ML15174A257 +, ML16005A625 +, ML15357A163 +, ML12039A103 +, ML15257A188 +, ML082900195 +, ML120690347 +, ML13241A186 +, ML13241A188 +, ML13276A573 +, ML13276A224 +, ML17010A332 +, ML13224A195 +, ML16077A353 +, ML13063A449 +, ML14241A665 +, ML13121A187 +, ML13323A111 +...
77 FR 55232 + and 81 FR 10283 +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +, ML17010A332 +...
1.388889e-4 d (0.00333 hours, 1.984127e-5 weeks, 4.566e-6 months) +, 3.009259e-4 d (0.00722 hours, 4.298942e-5 weeks, 9.893e-6 months) +, 2.777778e-4 d (0.00667 hours, 3.968254e-5 weeks, 9.132e-6 months) +, 3.472222e-4 d (0.00833 hours, 4.960317e-5 weeks, 1.1415e-5 months) +, 2.893519e-4 d (0.00694 hours, 4.133598e-5 weeks, 9.5125e-6 months) +, 3.935185e-4 d (0.00944 hours, 5.621693e-5 weeks, 1.2937e-5 months) +, 3.819444e-4 d (0.00917 hours, 5.456349e-5 weeks, 1.25565e-5 months) +, 8.333333e-4 d (0.02 hours, 1.190476e-4 weeks, 2.7396e-5 months) +, 9.259259e-5 d (0.00222 hours, 1.322751e-5 weeks, 3.044e-6 months) +, 4.62963e-5 d (0.00111 hours, 6.613757e-6 weeks, 1.522e-6 months) +, 1.041667e-4 d (0.0025 hours, 1.488095e-5 weeks, 3.4245e-6 months) +, 1.157407e-4 d (0.00278 hours, 1.653439e-5 weeks, 3.805e-6 months) +, 2.314815e-5 d (5.555556e-4 hours, 3.306878e-6 weeks, 7.61e-7 months) +, 1.157407e-5 d (2.777778e-4 hours, 1.653439e-6 weeks, 3.805e-7 months) +, 5.324074e-4 d (0.0128 hours, 7.60582e-5 weeks, 1.7503e-5 months) +, 4.050926e-4 d (0.00972 hours, 5.787037e-5 weeks, 1.33175e-5 months) + and 5.787037e-5 d (0.00139 hours, 8.267196e-6 weeks, 1.9025e-6 months) +
IEEE 323-2003 + and IEEE 344-2004 +
February 2, 2017 +
ML13234A503 +, ML14083A620 +, ML16091A152 +, ML13063A449 +, ML14241A665 +, ML13121A187 +, ML13323A111 +, ULNRC-06330, Final Safety Analysis Report Revision OL-22 and Technical Specification Bases Revision 13 +, ULNRC-06291, Supplement to Expedited Seismic Evaluation Process Report +, ML13270A066 + and 05000483/LER-2013-006, Regarding Degradation of Safety Injection Accumulator Vent Line +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
20:55:30, 9 January 2025 +
77 +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
Approval +
SECY-11-0093 + and SECY-12-0025 +
February 2, 2017 +
Steam Generator +, Reactor Coolant System +, Feedwater +, Service water +, Emergency Diesel Generator +, Main Steam Isolation Valve +, Auxiliary Feedwater +, Shutdown Cooling +, HVAC +, Residual Heat Removal +, Main Steam Safety Valve +, Decay Heat Removal +, Safety Relief Valve +, Control Rod + and Main Steam +
Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 +
Ameren Missouri + and Diya F +
Boric Acid +, High winds +, Shutdown Margin +, Loop seal +, High Radiation Area +, Ultimate heat sink +, Tornado Missile +, Time to boil +, Safe Shutdown Earthquake +, Locked High Radiation Area +, FLEX +, Fukushima Dai-Ichi +, Loss of Offsite Power +, Spent Fuel Pool Instrumentation +, Earthquake +, Fire Protection Program +, Core Exit Thermocouple +, Coast down +, GOTHIC +, Unidentified leakage + and Gas accumulation +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.