ULNRC-05960, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)

From kanterella
(Redirected from ML13063A449)
Jump to navigation Jump to search
Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)
ML13063A449
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/28/2013
From: Maglio S
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML130630581 List:
References
EA-12-051, ULNRC-05960
Download: ML13063A449 (5)


Text

~'t.

WAmeren Callaway Plant MISSOURI February 28, 2013 ULNRC-05960 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 2.202 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 OVERALL INTEGRATED PLAN IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO RELIABLE SPENT FUEL POOL INSTRUMENTATION (ORDER NUMBER EA-12-051)

References:

1. Letter dated March 12, 2012 from E. J. Leeds and M. R. Johnson, USNRC, to Adam C. Heflin, Callaway Plant, Union Electric Company, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"

(ADAMS Accession No. ML12056A044)

2. NRC Interim Staff Guidance JLD-ISG-2012-03, "Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation," Revision 0, August 29, 2012 (ADAMS Accession No. ML12221A339)
3. Nuclear Energy Institute document NEI 12-02, "Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"' Revision 1, August 24, 2012 (ADAMS Accession No. ML12240A307)
4. ULNRC-05925, "Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation," dated October 29, 2012 On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued an order identified above as Reference 1 to Union Electric Company (dba Ameren Missouri) for Callaway Plant. Reference 1 was immediately effective and directs Ameren Missouri to have a reliable indication of water level in PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05960 February 28, 2013 Page 2 of5 associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Section IV, Condition C.1.a of Reference 1 requires submission of an Overall Integrated Plan by February 28, 2013. NRC Interim Staff Guidance (ISO) (Reference 2) was issued August 29, 2012 and endorses industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 3 provides direction regarding the content of the Overall Integrated Plan.

Reference 4 provided Ameren Missouri's initial status report for Callaway Plant regarding reliable spent fuel pool instrumentation, as required by Reference 1.

The purpose of this letter is to provide the Overall Integrated Plan pursuant to Section IV, Condition C.1.a of Reference 1. This letter confirms Ameren Missouri has received Reference 2 and has an Overall Integrated Plan developed in accordance with the guidance for use in satisfying the requirements of Order EA-12-051 regarding reliable spent fuel pool instrumentation.

The enclosure to this letter provides Ameren Missouri's Overall Integrated Plan for spent fuel pool instrumentation at Callaway Plant pursuant to Reference 3. The enclosed integrated plan is based on conceptual design information. Final design details and associated changes for implementation such as procedure guidance, as well as any revisions to the information contained in the Enclosure to this letter, will be provided in the 6-month Overall Integrated Plan updates required by Reference 1.

This letter does not contain new commitments.

If you have any questions concerning the content of this letter, please contact Scott Maglio, Regulatory Affairs Manager, at 573-676-8719.

I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Executed on:


,jc,.,-t{ A . 9 Scott A. Maglio ,

Regulatory Affairs Manager SJM/nls

ULNRC-05960 February 28, 2013 Page 3 of5

Enclosure:

Ameren Missouri Spent Fuel Pool Instrumentation Integrated Plan, LTR-PFPS-13-3, Revision 0, dated February 18, 2013

ULNRC-05960 February 28, 2013 Page 4 of5 cc: Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Eric J. Leeds Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-13H16M Washington, DC 20555-0001

ULNRC-05960 February 28, 2013 Page 5 of5 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Other Situations ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle S. A. Maglio R. Holmes-Bobo NSRB Secretary T. B. Elwood Mr. Mike Westman (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (PG&E)

Mr. Mike Murray (STPNOC)

Mr. Mark Morgan (SCE)

Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission