Browse wiki
Jump to navigation
Jump to search
ML16056A560 +
10 CFR 50 + and 10 CFR 50.54#f +
SECY-11-0093 +, SRM-COMSECY-14-0037 +, SECY-12-0025 +, L-14-024, Firstenergy Nuclear Operating Companys (Fenocs) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + and COMSECY-14-0037, Enclosure 3 - Non-Concurrence Process Record for NCP-2014-010 +
ML12242A378 +, ML12054A736 +, ML12229A174 +, ML12053A340 +, ML12333A170 +, ML15194A015 +, ML13106A331 +, ML11186A950 +, ML12054A679 +, ML13234A503 +, ML14273A444 +, ML14265A107 +, ML12240A307 +, ML12221A339 +, ML14083A620 +, ML14211A346 +, ML14309A256 +, ML15089A236 +, ML12039A103 +, ML15232A594 +, ML16056A560 +, ML15208A034 +, ML082900195 +, ML15310A094 +, ML13273A514 +, ML13267A382 +, ML120690347 +, ML13241A186 +, ML13241A188 +, ML13276A573 +...
77 FR 55230 + and 77 FR 55232 +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +, ML16056A560 +...
1.273148e-4 d (0.00306 hours, 1.818783e-5 weeks, 4.1855e-6 months) +, 2.777778e-4 d (0.00667 hours, 3.968254e-5 weeks, 9.132e-6 months) +, 3.472222e-5 d (8.333333e-4 hours, 4.960317e-6 weeks, 1.1415e-6 months) +, 6.944444e-5 d (0.00167 hours, 9.920635e-6 weeks, 2.283e-6 months) +, 3.009259e-4 d (0.00722 hours, 4.298942e-5 weeks, 9.893e-6 months) +, 0.00141 d (0.0339 hours, 2.017196e-4 weeks, 4.6421e-5 months) +, 5.439815e-4 d (0.0131 hours, 7.771164e-5 weeks, 1.78835e-5 months) +, 2.314815e-5 d (5.555556e-4 hours, 3.306878e-6 weeks, 7.61e-7 months) +, 4.62963e-5 d (0.00111 hours, 6.613757e-6 weeks, 1.522e-6 months) +, 3.819444e-4 d (0.00917 hours, 5.456349e-5 weeks, 1.25565e-5 months) +, 4.166667e-4 d (0.01 hours, 5.952381e-5 weeks, 1.3698e-5 months) +, 9.259259e-5 d (0.00222 hours, 1.322751e-5 weeks, 3.044e-6 months) +, 8.101852e-5 d (0.00194 hours, 1.157407e-5 weeks, 2.6635e-6 months) +, 1.157407e-5 d (2.777778e-4 hours, 1.653439e-6 weeks, 3.805e-7 months) +, 1.388889e-4 d (0.00333 hours, 1.984127e-5 weeks, 4.566e-6 months) +, 2.083333e-4 d (0.005 hours, 2.97619e-5 weeks, 6.849e-6 months) +, 0.00116 d (0.0278 hours, 1.653439e-4 weeks, 3.805e-5 months) +, 0.0036 d (0.0864 hours, 5.142196e-4 weeks, 1.183355e-4 months) +, 0.00397 d (0.0953 hours, 5.671296e-4 weeks, 1.305115e-4 months) +, 5.787037e-5 d (0.00139 hours, 8.267196e-6 weeks, 1.9025e-6 months) +, 0.00264 d (0.0633 hours, 3.769841e-4 weeks, 8.6754e-5 months) +, 0.00214 d (0.0514 hours, 3.058862e-4 weeks, 7.03925e-5 months) + and 8.333333e-4 d (0.02 hours, 1.190476e-4 weeks, 2.7396e-5 months) +
May 16, 2016 +
ML14083A620 +, IR 05000440/2013008 +, IR 05000440/2013201 +, CAC:MF6099 +, ML13340A653 +, ML13155A539 +, L-16-165, Supplemental Information to Compliance with NRC Order EA-12-049 +, IR 05000440/2015501 +, L-15-012, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation +, L-15-163, Core Operating Limits Report for Operating Cycle 16, Revision 23, with Provisions for Proprietary Information +, L-14-285, Revision of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +, L-14-257, Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events +, L-14-024, Firstenergy Nuclear Operating Companys (Fenocs) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + and L-13-213, Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
07:51:47, 10 January 2025 +
96 +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
CAC:MF0802 + and CAC:MF0962 +
Approval +
SECY-11-0093 + and SECY-12-0025 +
May 16, 2016 +
Reactor Coolant System +, Service water +, Emergency Diesel Generator +, Reactor Core Isolation Cooling +, Primary containment +, Shutdown Cooling +, HVAC +, Reactor Pressure Vessel +, High Pressure Core Spray +, Core Spray +, Residual Heat Removal +, Shield Building +, Fuel Pool Cooling and Cleanup +, Automatic Depressurization System +, Circulating Water System +, Decay Heat Removal +, Safety Relief Valve +, Main Condenser + and Control Rod +
Unit No.1 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 +
High winds +, Shutdown Margin +, Ultimate heat sink +, Mission time +, Tornado Missile +, Time to boil +, Safe Shutdown Earthquake +, Internal Flooding +, Probabilistic Risk Assessment +, Operating Basis Earthquake +, Emergency Lighting +, Finite Element Analysis +, FLEX +, Fukushima Dai-Ichi +, Spent Fuel Pool Instrumentation +, Frazil ice +, Earthquake +, Fire Protection Program +, GOTHIC +, Spent fuel rack + and Gas accumulation +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.