Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000293/201800413 February 2019Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201
ML18194A58711 July 2018Attachment 1 to 2.18.045, EP-AD-301, Emergency Action Level Technical Bases Document, Revision 9 and Associated 10 CFR50.54(q) Review
ML18158A1307 June 2018Evaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station
IR 05000293/201700214 August 2017Integrated Inspection Report 05000293/2017002
ML17202G68017 July 2017Attachment 1 of Letter Number 2.17.053, EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and Associated 10 CFR 50.54(q) Review
05000293/LER-2016-0074 November 2016Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction
LER 16-007-00 for Pilgrim Nuclear Power Station Regarding Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction
ML16211A06722 July 2016Errata Change for Final Safety Analysis Report Revision 30
ML16055A46118 February 2016Emergency Plan Implementing Procedure Revisions, Including Revision 6 to EP-AD-601 and Revision 8 to EP-IP-261
ML16083A46130 November 2015Redacted - Updated Final Safety Analysis Report (UFSAR) Part 3 - November 2015
ML16083A45330 November 2015Redacted - Updated Final Safety Analysis Report (UFSAR) Part 2 - November 2015
ML16083A44830 November 2015Redacted - Updated Final Safety Analysis Report (UFSAR) Part 1 - November 2015
ML15202A41517 July 2015Station'S Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Submittal of Final Integrated Plan, Response..
ML15147A41227 May 2015IR 05000293/2015007; 02/02/2015 - 03/20/2015; Pilgrim Nuclear Power Station (Pnps); Special Inspection to Review the January 27, 2015 Partial Loss of Offsite Power (LOOP) and Reactor Scram Event; Inspection Procedure 93812, Special Inspecti
ML14003A04612 December 2013FSAR Update Revision 29, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes
ML13323A51814 November 2013Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel
ML13042A3029 February 2013PNO-I-13-001 - Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
ML11326A1539 November 2011FSAR Update Revision 28, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Commitment Changes
ML11042030631 January 2011GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007
ML11101040624 January 2011Final Written Examination with Answer Key (401-5 Format)
ML1106204747 January 2011Draft Written Exam (Draft 2)
ML10077045131 March 2010NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase.
ML09140006414 May 2009G20090292/LTR-09-0210/EDATS: SECY-2009-0248 - Mary E. Lampert, Rebecca J. Chin Pilgrim NPS RFO 2009: 2.206 Petition Requesting That NRC Require All Work Packages Inspected Prior to Pilgrim'S Re-start - Urgent Action Requested Due to Timing
ML0806704197 March 2008CDBI Findings
IR 05000293/20070032 August 2007IR 05000293-07-003; 04/01/2007-06/30/2007; Pilgrim Nuclear Power Station; Maintenance Effectiveness, Maintenance Risk Assessment and Emergent Work Control, Refueling and Other Outage Activities
ML07082036320 February 2007Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)
ML07061045111 December 2006Draft - RO & SRO Written Exam (Folder 2)
ML06187046930 June 2006Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems
ML06137062211 May 2006LER 06-01-000, Pilgrim Re Manual Scram Due to High Offgas Recombiner Temperature Resulting from Inadequate Preventive Recombiner Preheater Pressure Control Valve Controller
ML0416706158 June 2004LER 99-008-01 for Pilgrim Regarding Automatic Scram at 100 Percent Power Due to Turbine Trip
IR 05000293/200300630 July 2003IR 05000293-03-006; on 03/30 - 06/28/03; for Pilgrim Nuclear Power Station, Resident Inspection. Personnel Performance During Non-routine Plant Evolutions, Refueling and Other Outage Activities, and Surveillance Testing
ML03097070522 April 2003License Amendment 200 Emergency Core Cooling System Requirements During Shutdown Conditions
ML03113030922 April 2003Tech Spec Pages for Amendment 200 Emergency Core Cooling System Requirements During Shutdown Conditions
ML03030044023 January 2003Request for Amendment to TS Emergency Core Cooling System Requirements During Shutdown Conditions
IR 05000293/200200430 July 2002IR 05000293-02-004, on 05/12 - 06/29/02, Pilgrim Nuclear Power Station, Resident Inspection Report
ML02123029925 March 2002Transmittal of Written Summary of Recent Reactor Water Level Indication Issues at Pilgrim Nuclear Power Station
IR 05000293/200101218 March 2002IR 05000293/2001-012; on 12/30/2001 - 02/16/2002; Entergy Nuclear Generation Company; Pilgrim Nuclear Power Station, Resident Inspection. No Violations Identified
IR 05000293/200100828 January 2002IR 05000293/2001-08, Pilgrim Nuclear Power Station, Inspection on 11/18 - 12/29/2001, Related to Personnel Performance During Non-routine Plant Evolutions, Human Performance Issues. Non-cited Violation Noted
ML20206R81611 May 1999Proposed Tech Specs Re HPCI & RCIC Surveillance Testing
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick5 May 1999Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick
ML20198B2029 December 1998Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl
05000293/LER-1998-017, Forwards LER 98-017-00 Re Performance of Incomplete Surveillance for Reactor Water Level Instrument Channels. Action Being Taken to Preclude Recurrence,Listed12 August 1998Forwards LER 98-017-00 Re Performance of Incomplete Surveillance for Reactor Water Level Instrument Channels. Action Being Taken to Preclude Recurrence,Listed
NRC Generic Letter 1998-0228 May 1998NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition
ML20203D49820 February 1998Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173
IR 05000293/19970136 February 1998Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support
IR 05000293/199701111 December 1997Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown5 December 1997Recent Events Involving Reactor Coolant System Inventory Control During Shutdown
ML20203E31826 November 1997Forwards Corrected Copy of Pp 2 of SALP Report 50-293/97-99. NRC Has Determined That Error Did Not Change Overall Rating in Operations Area
IR 05000293/199709926 November 1997Correction to SALP Rept 50-293/97-99.Page 2 of Subj Rept Corrected
ML20198P8244 November 1997SALP Rept 50-293/97-99 for Period 960407-970913
IR 05000293/199700116 September 1997Ack Receipt of 970417 & 0829 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-293/97-01 on 970318