Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000293/2018004 | 13 February 2019 | Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201 |
ML18194A587 | 11 July 2018 | Attachment 1 to 2.18.045, EP-AD-301, Emergency Action Level Technical Bases Document, Revision 9 and Associated 10 CFR50.54(q) Review |
ML18158A130 | 7 June 2018 | Evaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station |
IR 05000293/2017002 | 14 August 2017 | Integrated Inspection Report 05000293/2017002 |
ML17202G680 | 17 July 2017 | Attachment 1 of Letter Number 2.17.053, EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and Associated 10 CFR 50.54(q) Review |
05000293/LER-2016-007 | 4 November 2016 | Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction LER 16-007-00 for Pilgrim Nuclear Power Station Regarding Manual Reactor Scram Due To Feedwater Regulating Valve Malfunction |
ML16211A067 | 22 July 2016 | Errata Change for Final Safety Analysis Report Revision 30 |
ML16055A461 | 18 February 2016 | Emergency Plan Implementing Procedure Revisions, Including Revision 6 to EP-AD-601 and Revision 8 to EP-IP-261 |
ML16083A461 | 30 November 2015 | Redacted - Updated Final Safety Analysis Report (UFSAR) Part 3 - November 2015 |
ML16083A453 | 30 November 2015 | Redacted - Updated Final Safety Analysis Report (UFSAR) Part 2 - November 2015 |
ML16083A448 | 30 November 2015 | Redacted - Updated Final Safety Analysis Report (UFSAR) Part 1 - November 2015 |
ML15202A415 | 17 July 2015 | Station'S Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Submittal of Final Integrated Plan, Response.. |
ML15147A412 | 27 May 2015 | IR 05000293/2015007; 02/02/2015 - 03/20/2015; Pilgrim Nuclear Power Station (Pnps); Special Inspection to Review the January 27, 2015 Partial Loss of Offsite Power (LOOP) and Reactor Scram Event; Inspection Procedure 93812, Special Inspecti |
ML14003A046 | 12 December 2013 | FSAR Update Revision 29, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes |
ML13323A518 | 14 November 2013 | Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel |
ML13042A302 | 9 February 2013 | PNO-I-13-001 - Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo |
ML11326A153 | 9 November 2011 | FSAR Update Revision 28, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Commitment Changes |
ML110420306 | 31 January 2011 | GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007 |
ML111010406 | 24 January 2011 | Final Written Examination with Answer Key (401-5 Format) |
ML110620474 | 7 January 2011 | Draft Written Exam (Draft 2) |
ML100770451 | 31 March 2010 | NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase. |
ML091400064 | 14 May 2009 | G20090292/LTR-09-0210/EDATS: SECY-2009-0248 - Mary E. Lampert, Rebecca J. Chin Pilgrim NPS RFO 2009: 2.206 Petition Requesting That NRC Require All Work Packages Inspected Prior to Pilgrim'S Re-start - Urgent Action Requested Due to Timing |
ML080670419 | 7 March 2008 | CDBI Findings |
IR 05000293/2007003 | 2 August 2007 | IR 05000293-07-003; 04/01/2007-06/30/2007; Pilgrim Nuclear Power Station; Maintenance Effectiveness, Maintenance Risk Assessment and Emergent Work Control, Refueling and Other Outage Activities |
ML070820363 | 20 February 2007 | Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) |
ML070610451 | 11 December 2006 | Draft - RO & SRO Written Exam (Folder 2) |
ML061870469 | 30 June 2006 | Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems |
ML061370622 | 11 May 2006 | LER 06-01-000, Pilgrim Re Manual Scram Due to High Offgas Recombiner Temperature Resulting from Inadequate Preventive Recombiner Preheater Pressure Control Valve Controller |
ML041670615 | 8 June 2004 | LER 99-008-01 for Pilgrim Regarding Automatic Scram at 100 Percent Power Due to Turbine Trip |
IR 05000293/2003006 | 30 July 2003 | IR 05000293-03-006; on 03/30 - 06/28/03; for Pilgrim Nuclear Power Station, Resident Inspection. Personnel Performance During Non-routine Plant Evolutions, Refueling and Other Outage Activities, and Surveillance Testing |
ML030970705 | 22 April 2003 | License Amendment 200 Emergency Core Cooling System Requirements During Shutdown Conditions |
ML031130309 | 22 April 2003 | Tech Spec Pages for Amendment 200 Emergency Core Cooling System Requirements During Shutdown Conditions |
ML030300440 | 23 January 2003 | Request for Amendment to TS Emergency Core Cooling System Requirements During Shutdown Conditions |
IR 05000293/2002004 | 30 July 2002 | IR 05000293-02-004, on 05/12 - 06/29/02, Pilgrim Nuclear Power Station, Resident Inspection Report |
ML021230299 | 25 March 2002 | Transmittal of Written Summary of Recent Reactor Water Level Indication Issues at Pilgrim Nuclear Power Station |
IR 05000293/2001012 | 18 March 2002 | IR 05000293/2001-012; on 12/30/2001 - 02/16/2002; Entergy Nuclear Generation Company; Pilgrim Nuclear Power Station, Resident Inspection. No Violations Identified |
IR 05000293/2001008 | 28 January 2002 | IR 05000293/2001-08, Pilgrim Nuclear Power Station, Inspection on 11/18 - 12/29/2001, Related to Personnel Performance During Non-routine Plant Evolutions, Human Performance Issues. Non-cited Violation Noted |
ML20206R816 | 11 May 1999 | Proposed Tech Specs Re HPCI & RCIC Surveillance Testing |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
ML20198B202 | 9 December 1998 | Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl |
05000293/LER-1998-017, Forwards LER 98-017-00 Re Performance of Incomplete Surveillance for Reactor Water Level Instrument Channels. Action Being Taken to Preclude Recurrence,Listed | 12 August 1998 | Forwards LER 98-017-00 Re Performance of Incomplete Surveillance for Reactor Water Level Instrument Channels. Action Being Taken to Preclude Recurrence,Listed |
NRC Generic Letter 1998-02 | 28 May 1998 | NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition |
ML20203D498 | 20 February 1998 | Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 |
IR 05000293/1997013 | 6 February 1998 | Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support |
IR 05000293/1997011 | 11 December 1997 | Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
ML20203E318 | 26 November 1997 | Forwards Corrected Copy of Pp 2 of SALP Report 50-293/97-99. NRC Has Determined That Error Did Not Change Overall Rating in Operations Area |
IR 05000293/1997099 | 26 November 1997 | Correction to SALP Rept 50-293/97-99.Page 2 of Subj Rept Corrected |
ML20198P824 | 4 November 1997 | SALP Rept 50-293/97-99 for Period 960407-970913 |
IR 05000293/1997001 | 16 September 1997 | Ack Receipt of 970417 & 0829 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-293/97-01 on 970318 |