ML13042A302

From kanterella
Jump to navigation Jump to search
PNO-I-13-001 - Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo
ML13042A302
Person / Time
Site: Pilgrim
Issue date: 02/09/2013
From: Andrew Rosebrook
Reactor Projects Region 1 Branch 4
To:
Bellamy R R
References
PNO-I-13-001
Download: ML13042A302 (1)


Text

February 9, 2013 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE

-PNO-I-13-001 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance.

Some of the information may not yet be fully verified or evaluated by the Region I staff (King of Prussia, PA) Facility Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station Plymouth, MA Docket No. 50-293 License No. DPR-35 Licensee Emergency Classification X Notification of Unusual Event Alert _ Site Area Emergency

_ General Emergency

_ Not Applicable

SUBJECT:

PILGRIM STATION: UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER DURING WINTER STORM NEMO On February 8,2013, at 9:17 p.m. EST, while operating at 80% power, the Pilgrim Nuclear Power Station automatically scrammed following the loss of all three sources of offsite power, apparently caused by Winter Storm Nemo. All plant systems performed as designed.

The Reactor Core Isolation Cooling system is being used to control reactor vessel water level and the High Pressure Coolant Injection is controlling reactor pressure.

The Unusual Event was declared at 10:00 p.m. EST based on the loss of offsite power lasting greater than 15 minutes. As of 5:00 a.m. EST on February 9, 2013, both emergency diesel generators continue to provide power to the safety-related electrical busses. Pilgrim has three sources of offsite power: the 355 and 342 lines (both 345KV lines), which feed the plant's startup transformer and have been given priority restoration status by the electrical transmission company; and a 25KV line, which connects to the station's shutdown transformer and could not be immediately restored.

Once one of the offsite lines is restored and determined to be reliable, the operators will reconnect offsite power to the vital and non-vital 4160 Volt AC buses and exit the Unusual Event. Region I Public Affairs Officers have responded to media inquiries and have issued a press release. This information has been reviewed with licensee plant management. This preliminary notification is issued for information only. ADAMS Accession Number: ML 1304 2A30 2 CONTACT: Andrew Rosebrook, (610) 337-5199