Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0320303553 July 2003Transmittal of a Signed Copy of Amendment No. 12 to Indemnity Agreement No. E-5
TAC:MA902620 June 2003
ML03127070320 June 2003Iowa State University - Termination of Facility Operating License No. R-59 for the UTR-10 Research Reactor
IR 05000116/20002019 May 2003IR 05000116-00-201, Iowa State Univ, Universal Training Reactor,On 09/25-27/00. Routine, Announced Inspection Involved the Confirmatory Radiological Survey & on-site Review of Selected Activities
ML0307605677 March 2003Request for Termination of Facility License No. R-59 for the Iowa State University Argonaut Reactor (Isuar)
ML02214029724 July 2002Annual Operations Report for Iowa State University UTR-10 Reactor
ML02085033229 April 2002Change of Facility Project Manager Research and Test Reactors
ML20217P68026 October 1999Informs That Effective 991026,SW Holmes Will Be NRC Inspector for Facility at Iowa State Univ,Due to Retirement of Previously Assigned Inspector
IR 05000116/19992011 September 1999Insp Rept 50-116/99-201 on 990810-12.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Environ Protection, Radiation Protection Operator Requalification & Maint
ML20211J4131 September 1999Forwards Insp Rept 50-116/99-201 on 990810-12.No Violations Noted
ML20210N5605 August 1999Informs That Rh Estwick,License SOP 70166,has Resigned Position as RO at IA State Univ Following Completion of Academic Program
ML20209F65230 June 1999Annual Operations Rept for Iowa State Univ UTR-10 Reactor for 980701-990630. with
TAC:MA438526 January 1999
ML20202C89826 January 1999Ack Receipt of SE Wendt ,Forwarding Rev to Iowa State Univ UTR-10 Reactor EP Under Provisions of 10CFR50.54. NRC Approval Not Needed Based on Determination That Changes Do Not Decrease EP Effectiveness
ML20206S05022 January 1999Forwards Revised Tech Specs,Reflecting Change in Facility Operating Status as Possession Only License,Per 990121 Telcon with NRC
ML20206S05922 January 1999Proposed Tech Specs Reflecting Change in Facility Operating Status as Possession Only License
ML20198R2136 January 1999Requests Issuance of Decommissioning Order for UTR-10 Reactor.Decommissioning Plan,Characterization Rept,Ltr of Intent & Environ Rept,Encl as Supporting DocumentationSafe Shutdown
ML20198R2546 January 1999Rev 0 to Draft Decommissioning Plan for Iowa State Univ UTR-10 Reactor
ML20198R2656 January 1999Rev 0 to Characterization Rept for Iowa State Univ UTR-10 Reactor
ML20198R2304 January 1999Forwards Environ Rept Prepared in Preparation for Proposed Decommissioning of UTR-10 Reactor,Per 10CFR51.21
ML20198L65728 December 1998Forwards Complete Text of TSs for UTR-10 Reactor Facility Which Are Being Updated to Reflect Change in Facility Operating Status
ML20198L70828 December 1998Amend 13 to Proposed TS for UTR-10 Reactor Facility at IA State Univ Possession Only LicenseShutdown Margin
ML20198R22121 December 1998Submits Revised Cost Estimate for Decommissioning UTR-10 Reactor
TAC:MA417923 November 1998
ML20196B15823 November 1998Informs of Completion of Review of Iowa State Research RO Requalification Program Submitted by Wendt in . Program Meets Requirements & Considered Acceptable. Implementation of Approved Program Should Begin Immediately
ML20195F47630 September 1998Forwards Copy of IA State Univ Revised Licensed Operator Requalification Program Which Is Being Provided for NRC Approval,Per 10CFR50.59.Revised Program Reflects That UTR-10 Reactor Has Permanently Ceased Reactor Operations
ML20154A79928 September 1998Informs That Licensee Has Chosen Decon Decommissioning Alternative & Will Proceed with Dismantling UTR-10 Reactor as Soon as Possible.Description Decommissioning Plan, Discussed
ML20151Z68914 September 1998Application for Amend to License R-59,reflecting Change in Need for Area Radiation Monitors Since Reactor Operations Have Permanently Ceased
ML20151Z69814 September 1998Proposed Tech Specs 3.7,reflecting Change in Need for Area Radiation Monitors Since Reactor Operations Have Permanently Ceased
ML20154K36217 July 1998Requests Assistance in Determining New Route for Iowa State Univ to Use to Transport LEU Fuel to Savannah River Site
ML20236P07830 June 1998Annual Operations Rept Iowa State Univ UTR-10 Reactor for Jul 1997-June 1998
ML20217A43716 April 1998Informs of Intent to Cease Operating UTR-10 Nuclear Reactor No Later than 980515.Licensee Plans to Remove LEU Fuel from Reactor & Place Fuel Into Storage Pits by 980630
ML20217H31330 March 1998Safety Evaluation Supporting Amend 12 to License R-59Grace period
ML20217H30230 March 1998Amend 12 to License R-59,revising TS to Clarify Grace Period Associated W/Surveillance & Maint IntervalsShutdown Margin
Grace period
ML20217H28730 March 1998Forwards Amend 12 to License R-59 & Safety Evaluation.Amend Revises TS to Clarify Grace Periods Associated W/Surveillance & Maint IntervalsGrace period
TAC:MA040830 March 1998
ML20217F40618 March 1998Provides Advance Notification of Second of 2 Shipments of Spent Nuclear Fuel Consisting of Quantity of SNM of Moderate Strategic Significance.Info Required by 10CFR73.72 Provided on Encl Shipment Id Form
ML20217N6813 March 1998Provides Advance Notification of Shipment of Spent Nuclear Fuel.Info Required by 10CFR73.72 Provided on Encl Shipment Id Form
ML20202J49010 February 1998Proposed Tech Specs Revising Definitions Section of TS for Iowa State Univ Reactor FacilityShutdown Margin
ML20202F72110 February 1998Forwards Rev to Request for Update of TS Which Was Submitted on 971222.Rev Is Result of Several Telcons W/T Michaels & Is Submitted for Approval
ML20198R2786 January 1998Appendices to Characterization Rept for Iowa State Univ UTR-10 Reactor
ML20198Q6276 January 1998Forwards Revised Licensed Operator Requalification Program for NRC Approval,Per 10CFR50.59.W/explanation for ChangesPower change
ML20197G34923 December 1997Notifies That TE Draur Has Resigned Position at Iowa State Univ Following Completion of Academic Program
ML20197H97622 December 1997Forwards Three Copies of Updated TS Section 1.0, Definitions, for Approval.Explanation of Changes Provided & Additions Are UnderlinedShutdown Margin
Grace period
ML20211J4732 October 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of R-059
ML20216H0428 September 1997Forwards Response to NRC Re Violations Noted in Insp of License R-059 on 970721-25.Corrective Actions:Last Three Required Surveillance Activities Were Completed on 970108Grace period
IR 05000116/199720118 August 1997Insp Rept 50-116/97-201 on 970721-25.Violations Noted. Major Areas Inspected:Routine,Announced Insp Included Aspects of Organization,Periodic & Special Repts, Operation,Maint & ProceduresMissed surveillance
License Renewal
Grace period
ML20210M80118 August 1997Notice of Violation from Insp on 970721-25.Violation Noted: Reactor Was Taken Critical & Operated at Full Power on 961231 W/Following SR for Safety Sys Incomplete
ML20210M79618 August 1997Forwards Insp Rept 50-116/97-201 on 970721-25 & Nov. Violations of Concern Because of Apparent Failure to Properly Assure,At Specified Frequencies,That Certain Safety Sys Were Operable as Required Prior to Reactor Operation
ML20151K23830 June 1997Annual Operations Rept IA State Univ UTR-10 Reactor for 960701-970630Shutdown Margin
Grace period