Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML032030355 | 3 July 2003 | Transmittal of a Signed Copy of Amendment No. 12 to Indemnity Agreement No. E-5 | |
TAC:MA9026 | 20 June 2003 | ||
ML031270703 | 20 June 2003 | Iowa State University - Termination of Facility Operating License No. R-59 for the UTR-10 Research Reactor | |
IR 05000116/2000201 | 9 May 2003 | IR 05000116-00-201, Iowa State Univ, Universal Training Reactor,On 09/25-27/00. Routine, Announced Inspection Involved the Confirmatory Radiological Survey & on-site Review of Selected Activities | |
ML030760567 | 7 March 2003 | Request for Termination of Facility License No. R-59 for the Iowa State University Argonaut Reactor (Isuar) | |
ML022140297 | 24 July 2002 | Annual Operations Report for Iowa State University UTR-10 Reactor | |
ML020850332 | 29 April 2002 | Change of Facility Project Manager Research and Test Reactors | |
ML20217P680 | 26 October 1999 | Informs That Effective 991026,SW Holmes Will Be NRC Inspector for Facility at Iowa State Univ,Due to Retirement of Previously Assigned Inspector | |
IR 05000116/1999201 | 1 September 1999 | Insp Rept 50-116/99-201 on 990810-12.No Violations Noted. Major Areas Inspected:Organizational Structure & Functions, Operations,Design Control,Review & Audit,Environ Protection, Radiation Protection Operator Requalification & Maint | |
ML20211J413 | 1 September 1999 | Forwards Insp Rept 50-116/99-201 on 990810-12.No Violations Noted | |
ML20210N560 | 5 August 1999 | Informs That Rh Estwick,License SOP 70166,has Resigned Position as RO at IA State Univ Following Completion of Academic Program | |
ML20209F652 | 30 June 1999 | Annual Operations Rept for Iowa State Univ UTR-10 Reactor for 980701-990630. with | |
TAC:MA4385 | 26 January 1999 | ||
ML20202C898 | 26 January 1999 | Ack Receipt of SE Wendt ,Forwarding Rev to Iowa State Univ UTR-10 Reactor EP Under Provisions of 10CFR50.54. NRC Approval Not Needed Based on Determination That Changes Do Not Decrease EP Effectiveness | |
ML20206S050 | 22 January 1999 | Forwards Revised Tech Specs,Reflecting Change in Facility Operating Status as Possession Only License,Per 990121 Telcon with NRC | |
ML20206S059 | 22 January 1999 | Proposed Tech Specs Reflecting Change in Facility Operating Status as Possession Only License | |
ML20198R213 | 6 January 1999 | Requests Issuance of Decommissioning Order for UTR-10 Reactor.Decommissioning Plan,Characterization Rept,Ltr of Intent & Environ Rept,Encl as Supporting Documentation | Safe Shutdown |
ML20198R254 | 6 January 1999 | Rev 0 to Draft Decommissioning Plan for Iowa State Univ UTR-10 Reactor | |
ML20198R265 | 6 January 1999 | Rev 0 to Characterization Rept for Iowa State Univ UTR-10 Reactor | |
ML20198R230 | 4 January 1999 | Forwards Environ Rept Prepared in Preparation for Proposed Decommissioning of UTR-10 Reactor,Per 10CFR51.21 | |
ML20198L657 | 28 December 1998 | Forwards Complete Text of TSs for UTR-10 Reactor Facility Which Are Being Updated to Reflect Change in Facility Operating Status | |
ML20198L708 | 28 December 1998 | Amend 13 to Proposed TS for UTR-10 Reactor Facility at IA State Univ Possession Only License | Shutdown Margin |
ML20198R221 | 21 December 1998 | Submits Revised Cost Estimate for Decommissioning UTR-10 Reactor | |
TAC:MA4179 | 23 November 1998 | ||
ML20196B158 | 23 November 1998 | Informs of Completion of Review of Iowa State Research RO Requalification Program Submitted by Wendt in . Program Meets Requirements & Considered Acceptable. Implementation of Approved Program Should Begin Immediately | |
ML20195F476 | 30 September 1998 | Forwards Copy of IA State Univ Revised Licensed Operator Requalification Program Which Is Being Provided for NRC Approval,Per 10CFR50.59.Revised Program Reflects That UTR-10 Reactor Has Permanently Ceased Reactor Operations | |
ML20154A799 | 28 September 1998 | Informs That Licensee Has Chosen Decon Decommissioning Alternative & Will Proceed with Dismantling UTR-10 Reactor as Soon as Possible.Description Decommissioning Plan, Discussed | |
ML20151Z689 | 14 September 1998 | Application for Amend to License R-59,reflecting Change in Need for Area Radiation Monitors Since Reactor Operations Have Permanently Ceased | |
ML20151Z698 | 14 September 1998 | Proposed Tech Specs 3.7,reflecting Change in Need for Area Radiation Monitors Since Reactor Operations Have Permanently Ceased | |
ML20154K362 | 17 July 1998 | Requests Assistance in Determining New Route for Iowa State Univ to Use to Transport LEU Fuel to Savannah River Site | |
ML20236P078 | 30 June 1998 | Annual Operations Rept Iowa State Univ UTR-10 Reactor for Jul 1997-June 1998 | |
ML20217A437 | 16 April 1998 | Informs of Intent to Cease Operating UTR-10 Nuclear Reactor No Later than 980515.Licensee Plans to Remove LEU Fuel from Reactor & Place Fuel Into Storage Pits by 980630 | |
ML20217H313 | 30 March 1998 | Safety Evaluation Supporting Amend 12 to License R-59 | Grace period |
ML20217H302 | 30 March 1998 | Amend 12 to License R-59,revising TS to Clarify Grace Period Associated W/Surveillance & Maint Intervals | Shutdown Margin Grace period |
ML20217H287 | 30 March 1998 | Forwards Amend 12 to License R-59 & Safety Evaluation.Amend Revises TS to Clarify Grace Periods Associated W/Surveillance & Maint Intervals | Grace period |
TAC:MA0408 | 30 March 1998 | ||
ML20217F406 | 18 March 1998 | Provides Advance Notification of Second of 2 Shipments of Spent Nuclear Fuel Consisting of Quantity of SNM of Moderate Strategic Significance.Info Required by 10CFR73.72 Provided on Encl Shipment Id Form | |
ML20217N681 | 3 March 1998 | Provides Advance Notification of Shipment of Spent Nuclear Fuel.Info Required by 10CFR73.72 Provided on Encl Shipment Id Form | |
ML20202J490 | 10 February 1998 | Proposed Tech Specs Revising Definitions Section of TS for Iowa State Univ Reactor Facility | Shutdown Margin |
ML20202F721 | 10 February 1998 | Forwards Rev to Request for Update of TS Which Was Submitted on 971222.Rev Is Result of Several Telcons W/T Michaels & Is Submitted for Approval | |
ML20198R278 | 6 January 1998 | Appendices to Characterization Rept for Iowa State Univ UTR-10 Reactor | |
ML20198Q627 | 6 January 1998 | Forwards Revised Licensed Operator Requalification Program for NRC Approval,Per 10CFR50.59.W/explanation for Changes | Power change |
ML20197G349 | 23 December 1997 | Notifies That TE Draur Has Resigned Position at Iowa State Univ Following Completion of Academic Program | |
ML20197H976 | 22 December 1997 | Forwards Three Copies of Updated TS Section 1.0, Definitions, for Approval.Explanation of Changes Provided & Additions Are Underlined | Shutdown Margin Grace period |
ML20211J473 | 2 October 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of R-059 | |
ML20216H042 | 8 September 1997 | Forwards Response to NRC Re Violations Noted in Insp of License R-059 on 970721-25.Corrective Actions:Last Three Required Surveillance Activities Were Completed on 970108 | Grace period |
IR 05000116/1997201 | 18 August 1997 | Insp Rept 50-116/97-201 on 970721-25.Violations Noted. Major Areas Inspected:Routine,Announced Insp Included Aspects of Organization,Periodic & Special Repts, Operation,Maint & Procedures | Missed surveillance License Renewal Grace period |
ML20210M801 | 18 August 1997 | Notice of Violation from Insp on 970721-25.Violation Noted: Reactor Was Taken Critical & Operated at Full Power on 961231 W/Following SR for Safety Sys Incomplete | |
ML20210M796 | 18 August 1997 | Forwards Insp Rept 50-116/97-201 on 970721-25 & Nov. Violations of Concern Because of Apparent Failure to Properly Assure,At Specified Frequencies,That Certain Safety Sys Were Operable as Required Prior to Reactor Operation | |
ML20151K238 | 30 June 1997 | Annual Operations Rept IA State Univ UTR-10 Reactor for 960701-970630 | Shutdown Margin Grace period |