ML020850332
Text
April 29, 2002 Dr. Kenan Ünlü, Director Ward Center for Nuclear Sciences Cornell University 105 Ward Laboratory Ithaca, NY 14853-7701
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Ünlü:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Cornell University Docket Nos. 50-97/157 cc:
Dr. John Silcox, Vice Provost for Physical Sciences and Engineering Cornell University 314 Day Hall Ithaca, NY 14853-2801 Dr. Paul J. Merges, Director Bureau of Pesticides and Radiation NYS Department of Environmental Conservation 50 Wolf Road, Room 498 Albany, NY 12233-7255 Mr. Paul Craven Ward Center for Nuclear Sciences Cornell University 105 Ward Laboratory Ithaca, NY 14853 Mr. John P. Spath NYS Energy Research and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399
April 29, 2002 Dr. Daniel B. Bullen Mechanical Engineering Department Iowa State University 2025 H. M. Black Engineering Building Ames, IA 50011-2241
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Bullen:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Iowa State University Docket No. 50-116 cc:
Mayor Ted Tedesco City Hall 515 Clark Avenue Ames, IA 50010 Director, Office for Planning and Programming 523 East 12th Street Des Moines, IA 50319 Mr. Warren DeVries Department Executive Officer, Mechanical Engineering Department 2025 H.M. Black Engineering Building Ames, IA 50011-2160 Mr. Scott E. Wendt, Reactor Manager Mechanical Engineering Department 209W Nuclear Engineering Laboratory Iowa State University Ames, IA 50011-2241
April 29, 2002 Dr. Nolan E. Hertel, Director Neely Nuclear Research Center Georgia Institute of Technology 900 Atlantic Drive Atlanta, GA 30332-0425
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Hertel:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Marvin M. Mendonca, your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Georgia Institute of Technology Docket No. 50-160 cc:
Mr. Charles H. Badger Office of Planning and Budget Room 608 270 Washington Street, S.W.
Atlanta, GA 30334 Mayor of City of Atlanta 55 Trinity Avenue, S.W.
Suite 2400 Atlanta, GA 30335 Dr. William Vernetson Director of Nuclear Facilities Department of Nuclear Engineering Sciences University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Joe D. Tanner, Commissioner Department of Natural Resources 47 Trinity Avenue, S.W.
Atlanta, GA 30334 Dr. Rodney Ice, MORS Neely Nuclear Research Center Georgia Institute of Technology 900 Atlantic Drive Atlanta, GA 30332-0425 Ms. Pamela Blockey-OBrien D23 Golden Valley Douglasville, GA 30134 Mr. E.F. Cobb Southern Nuclear Company 42 Iverness Center Birmingham, AL 35242 Dr. G. Wayne Clough, President Georgia Institute of Technology Carnegie Building Atlanta, GA 30332-0325 Ms. Glen Carrol 139 Kings Highway Decatur, GA 30030 Charles Bechhoefer, Chairman Atomic Safety and Licensing Board Panel U.S. NRC, MS: T3-F23 Washington, DC 20555-0001 Mr. James C. Hardeman, Jr.
Manager, Environmental Radiation Program Environmental Protection Division Dept. of Natural Resources State of Georgia 4244 International Parkway Suite 114 Atlanta, GA 30354 Dr. Jean-Lou Chameau, Dean College of Engineering Georgia Institute of Technology 225 North Avenue Atlanta, GA 30332-0425 Dr. Peter S. Lam Atomic Safety and Licensing Board Panel U.S. NRC, MS: T3-F23 Washington, DC 20555-0001 Dr. J. Narl Davidson, Interim Dean Chair, Technical and Safety Review Committee Georgia Institute of Technology 225 North Avenue Atlanta, GA 3033-0360 Dr. Charles Liotta, Vice Provost of Research and Dean of Graduate Studies Georgia Institute of Technology 225 North Avenue Atlanta, GA 30332
April 29, 2002 Mr. David Wehe, Director Phoenix Memorial Laboratory Ford Nuclear Reactor University of Michigan 2301 Bonisteel Boulevard Ann Arbor, MI 48109-2100
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Mr. Wehe:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
University of Michigan Docket No. 50-02 cc:
Special Assistant to the Governor Office of the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. C.W. Becker Phoenix Memorial Laboratory 2301 Bonisteel Boulevard University of Michigan Ann Arbor, MI 48109 Michigan Department of Environmental Quality Drinking Water and Radiological Protection Division P.O. Box 30630 Lansing, MI 48909-8130
April 29, 2002 Dr. Jay F. Kunze Dean College of Engineering Idaho State University P.O. Box 8060 Pocatello, ID 83209
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Kunze:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Marvin M. Mendonca, your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Idaho State University Docket No. 50-284 cc:
Mr. Todd Gansauge Research Reactor Facility College of Engineering Idaho State University, Box 8060 Pocatello, ID 83209 Idaho State University ATTN: Dr. John Bennion Reactor Administrator Pocatello, ID 83209 Idaho State University ATTN: Mr. Tom Gesell Radiation Safety Officer Physics Department Box 8106 Pocatello, ID 83209 Radiation Control Program Director Division of Environment 450 West State, 3rd Floor Boise, ID 83720 Test, Research and Training Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611
April 29, 2002 Mr. Michael Whaley, Manager KSU Nuclear Reactor Facility Department of Mechanical and Nuclear Engineering Kansas State University 112 Ward Hall Manhattan, KS 66506-5204
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Mr. Whaley:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Marvin M. Mendonca, your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Kansas State University Docket No. 50-188 cc:
Office of the Governor State of Kansas Topeka, KS 66612 Mayor of Manhattan P.O. Box 748 Manhattan, KS 66502 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
April 29, 2002 Dr. Richard Heist Professor and Dean School of Engineering Manhattan College Manhattan College Parkway Riverdale, NY 10471-4098
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Heist:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Marvin M. Mendonca, your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Manhattan College Docket No. 50-199 cc:
Municipal Reference and Research Center 31 Chambers Street New York, NY 10007 Mr. John P. Spath NYS Energy Research and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Bob Berlin 35 Sterling Pines Road Tuxedo, NY 10987 Dr. Paul J. Merges, Director Bureau of Pesticides and Radiation NYS Department of Environmental Conservation 50 Wolf Road, Room 498 Albany, NY 12233-7255
April 29, 2002 Dr. Marye Anne Fox, Chancellor North Carolina State University Room A, Holladay Hall P.O. Box 7001 Raleigh, NC 27695-7001
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Fox:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
North Carolina State University Docket No. 50-297 cc:
Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Dr. Paul J. Turinsky, Head Nuclear Engineering Department North Carolina State University P.O. Box 7909 Raleigh, NC 27695-7909 Dayne H. Brown, Director Division of Radiation Protection Department of Environmental, Health and Natural Resources P.O. Box 27687 Raleigh, NC 27611-7687 Dr. Nino A. Masnari Dean of Engineering North Carolina State University P.O. Box 7909 Raleigh, NC 27695-7909 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
April 29, 2002 Dr. James C. Williams, Director Engineering Experiment Station Ohio State University 167 Hitchcock Hall Columbus, OH 43210
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Williams:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Marvin M. Mendonca, your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Ohio State University Docket No. 50-150 cc:
Ohio Department of Health ATTN: Radiological Health Program Director P.O. Box 118 Columbus, OH 43216 Ohio Environmental Protection Agency Division of Planning Environmental Assessment Section P.O. Box 1049 Columbus, OH 43216 Mr. Richard D. Myser Reactor Operations Manager Engineering Experiment Station Ohio State University 142 Hitchcock Hall Columbus, OH 43210 Dr. William Vernetson Director of Nuclear Facilities Department of Nuclear Engineering Science University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
April 29, 2002 Mr. Robert Bean, Director Radiation Laboratories Purdue University 1290 Nuclear Engineering Bldg.
West Lafayette, IN 47907
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Mr. Bean:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Purdue University Docket No. 50-182 cc:
Mayor City of West Layfayette 609 W. Navajo West Lafayette, IN 47906 Indoor and Radiologic Health Indiana State Department of Health 2 North Meridian Street, 5th Floor Indianapolis, IN 46204-3006 State Board of Health ATTN: Director, Bureau of Engineering 1330 West Michigan Street Indianapolis, IN 46206 Ed Merritt Reactor Supervisor Department of Nuclear Engineering Purdue University West Lafayette, IN 47907
April 29, 2002 Mr. Stephen G. Frantz, Director Reed Reactor Facility Reed College 3203 SE Woodstock BLVD.
Portland, OR 97202
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Mr. Frantz:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Reed College Docket No. 50-288 cc:
Mayor of the City of Portland 1220 Southwest 5th Avenue Portland, OR 97204 Reed College ATTN: Dr. Ellen Stauder Acting Dean of the Faculty 3203 S.E. Woodstock Boulevard Portland, OR 97202-8199 Reed College ATTN: Dr. Peter Steinberger Acting President 3203 S.E. Woodstock Boulevard Portland, OR 97202-8199 Oregon Department of Energy ATTN: David Stewart-Smith, Director Division of Radiation Control 625 Marion Street, N.E.
Salem, OR 97310 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
April 29, 2002 Dr. Donald R. Harris, Director Critical Facility Rensselaer Polytechnic Institute Troy, NY 12181
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Harris:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
Rensselaer Polytechnic Institute Docket No. 50-225 cc:
Mayor of the City of Schenactady Schenactady, NY 12305 Dr. Paul J. Merges, Director Bureau of Pesticides and Radiation NYS Department of Environmental Conservation 50 Wolf Road, Room 498 Albany, NY 12233-7255 Mr. Brian S. Craig Department of Nuclear Engineering and Science Rensselaer Polytechnic Institute Troy, NY 12181 Mr. John P. Spath NYS Energy Research and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 New York City Department of Health Public Health Library 125 Worth Street New York, NY 10013
April 29, 2002 Mr. David Vasbinder, Director Occupational and Environmental Safety State University of New York at Buffalo 220 Winspear Avenue Buffalo, NY 14214-1034
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Mr. Vasbinder:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
State University of New York Docket No. 50-57 at Buffalo cc:
Dr. Paul J. Merges, Director Bureau of Pesticides and Radiation NYS Department of Environmental Conservation 50 Wolf Road, Room 498 Albany, NY 12233-7255 Mr. John P. Spath NYS Energy Research and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399
April 29, 2002 Dr. Robert U. Mulder, Director UVA Reactor Facility University of Virginia Charlottesville, VA 22903-2442
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Mulder:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
University of Virginia Docket Nos. 50-62/396 cc:
Department of Environmental Quality Office of Grants Management and Intergovernmental Affairs 629 East Main Street, Sixth Floor Richmond, VA 23219 Dr. William Vernetson Director of Nuclear Facilities Department of Nuclear Engineering Sciences University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Office of the Attorney General 900 East Main Street Richmond, VA 23219 Radiological Health Program Virginia Department of Health P.O. Box 2448 Richmond, VA 23218 Dr. Ralph O. Allen, Chairman Reactor Decommissioning Committee Environmental Health and Safety University of Virginia P.O. Box 3425 Charlottesville, VA 22904 Mr. Paul E. Benneche, Supervisor Nuclear Reactor Facility Environmental Health and Safety University of Virginia P.O. Box 400322 Charlottesville, VA 22904-4322
April 29, 2002 Dr. Michael R. Gottfredson, Executive Vice Chanclellor University of California at Irvine Irvine, CA 92697-1000
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Dr. Gottfredson:
This letter is to inform you we have made changes to our Project Manager assignments.
Effective the date of this letter, Mr. Alexander Adams, Jr. will be the Project Manager for your facility. Mr. Marvin M. Mendonca, your previous Project Manager, will act in a backup capacity and provide support to Mr. Adams during the transition. Als address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1127. If you have any questions, please contact me at 301-415-1188.
Sincerely, Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate
University of California at Irvine Docket No. 50-326 cc:
Dr. Richard Chamberlain, Chair Department of Chemistry University of California, Irvine Irvine, CA 92697-2025 Mr. Steve Hsu Radiological Health Branch State Department of Health Services P.O. Box 9442732 Sacramento, CA 94234-7320 Dr. George E. Miller Department of Chemistry 516 Physical Sciences 1 University of California, Irvine Irvine, CA 92697-2025 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
April 29, 2002 Various Addressees
SUBJECT:
CHANGE OF FACILITY PROJECT MANAGER RESEARCH AND TEST REACTORS
Dear Sir or Madam:
This letter is to inform you that Mr. Daniel E. Hughes has recently joined the Research and Test Reactors Section as a Project Manager. Effective April 29, 2002, Mr. Hughes was assigned to your facility as its Project Manager, Mr. Alexander Adams, Jr., your previous Project Manager, will act in a backup capacity and provide support to Mr. Hughes during his transition. Dans address is U.S. Nuclear Regulatory Commission, Mail Stop O12-G13, Washington, D.C. 20555 and his telephone number is 301-415-1631. If you have any questions, please contact me at 301-415-1188.
Docket No.:
Licensee:
50-97 Cornell ZPR 50-157 Cornell TRIGA 50-116 Iowa State 50-160 Georgia Tech.
50-284 Idaho State 50-188 Kansas State 50-2 Michigan 50-199 Manhattan 50-297 North Carolina State 50-150 Ohio State 50-182 Purdue 50-288 Reed 50-225 Rensselaer 50-57 SUNY Buffalo 50-62 Virginia 50-396 Virginia ZPR Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation cc: As appropriate DISTRIBUTION:
PUBLIC RORP r/f AAdams MMendonca CBassett PDoyle TDragoun WEresian SHolmes DHughes EHylton PIsaac ADAMS ACCESSION NO.: ML020850332 TEMPLATE #: NRR-106
- Please see previous concurrence OFFICE RORP:LA RORP:PM RORP:SC NAME
- EHylton:rdr DHughes PMadden DATE 03/ 27 /2002 04/ 10 /2002 04/ 10 /2002 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY