Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML103610353 | 30 December 2010 | Audit of the Licensee'S Management of Regulatory Commitments | Operating Basis Earthquake Earthquake |
TAC:ME5171 | 30 December 2010 | ||
IR 05000327/2010302 | 23 December 2010 | Er 05000327-10-302, 05000328-10-302, 09/13-22/2010 & 09/29/2010; Sequoyah Nuclear Plant; Operator License Examinations | Fitness for Duty Fatigue Rule |
ML103630044 | 22 December 2010 | Request to Employ Alternative Testing to IWE-5221 Requirements in American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI (2001 Edition with 2003 Addenda) - Request Number 2-APPJ-1 | |
TAC:ME5245 | 22 December 2010 | ||
ML103560127 | 22 December 2010 | Corrections for Amendment Nos. 328 and 321 | |
ML102990074 | 21 December 2010 | License Amendment, Issuance of Amendments to Revised Technical Specifications to Resolve an Oversight Regarding the Operability Requirements for the Intermediate Range Neutron Flux Channels (TS-09-05) | |
IR 05000327/2010501 | 20 December 2010 | IR 05000327-10-501 & 05000328-10-501; on 11/15/2010 - 11/19/2010; Sequoyah Nuclear Plant, Units 1 and 2; Baseline Inspection | |
ML103500174 | 15 December 2010 | Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML103300218 | 23 November 2010 | National Pollutant Discharge Elimination System (NPDES) Permit No. TN0026450-Signatory Authority | |
ML102850325 | 18 November 2010 | Summary of Public Meeting with Tennessee Valley Authority (Tva), Regarding New Fuel Transition at Sequoyah Nuclear Plant, Units 1 and 2 | |
ML111160547 | 17 November 2010 | FEMA Sequoyah Final Exercise Report, Drill Date - November 17, 2010 | |
ML11112A132 | 17 November 2010 | Homeland Security Exercise and Evaluation Program, After Action Report | |
ML103440541 | 15 November 2010 | Reactor Operator and Senior Operator Initial Examinations - 05000327-10-302 and 05000328-10-302 | Fitness for Duty Job Performance Measure |
ML103160080 | 12 November 2010 | Notice of Forthcoming Conference Call with Tennessee Valley Authority | |
ML110060691 | 10 November 2010 | NPDES Permit No. TN0026450 - Comments on Draft NPDES Permit | Safe Shutdown Grab sample Zebra Mussel Veliger |
ML103190407 | 10 November 2010 | Discharge Monitoring Report for October 2010 | Veliger |
ML103130191 | 4 November 2010 | Falsification of Response Weapon Test Fire Records (Office of Investigations Case No. 2-2010-007) | |
TAC:ME4955 | 4 November 2010 | ||
ML103050171 | 4 November 2010 | Acknowledgement Receipt of Browns Ferry, Units 1, 2 & 3, Sequoyah, Units 1 & 2, and Watts Bar, Units 1 & 2 - Acknowledgement of Cyber Security Plans Supplements Based on NEI 08-09, Revision 6 | Cyber Security |
ML103070084 | 4 November 2010 | Request Withholding Information from Public Disclosure Regarding Cyber Security Plans and Cyber Security Plan Implement | Cyber Security |
ML103020448 | 29 October 2010 | IR 05000327-10-004 & 05000328-10-004, on 07/01/2010 - 09/30/2010, Sequoyah Nuclear Plant, Units 1 and 2, Heat Sink Performance, Identification and Resolution of Problems, and Event Followup | Fire Barrier Internal Flooding Past operability Temporary Modification Emergency Lighting Significance Determination Process Maintenance Rule Program Fuel cladding Biofouling |
ML103010271 | 28 October 2010 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection (IR 05000327-11-006 and 05000328-11-006) | Safe Shutdown Fitness for Duty Fire Barrier Operator Manual Action Severe Accident Management Guideline B.5.b Mitigating Strategies Fire Protection Program |
ML103000228 | 26 October 2010 | 10-302,05000328-10-302 Final RO and SRO Written as Given Exam | Shutdown Margin Grab sample Post Accident Monitoring |
ML102990150 | 26 October 2010 | Cancelled - Notice of Meeting with (Tva), to Discuss Responses to the NRC Requests for Additional Information (Rals) for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis. | |
ML103000225 | 26 October 2010 | 10-302,05000328-10-302 Post Exam Comments | Shutdown Margin |
ML103000223 | 26 October 2010 | 10-302, 05000328-10-302 Reactor Operator and Senior Reactor Operator Initial Examinations | |
ML102930505 | 20 October 2010 | GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades | |
ML102940037 | 19 October 2010 | Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Permit No. TNR050015 Sector O Exceedance of the Benchmark Monitoring Requirement | |
ML11350A240 | 18 October 2010 | Cycle 17, 180-Day Steam Generator Inspection Report | Nondestructive Examination |
ML102870997 | 12 October 2010 | Discharge Monitoring Report for September 2010 | Veliger |
ML102740437 | 12 October 2010 | Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Responses to the NRC Requests for Additional Information (Rais) for General Letter 2004-02 | |
ML102871000 | 8 October 2010 | TVA Voluntary Response to RIS 2010-01 | |
ML102790047 | 1 October 2010 | Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |