UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2010 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTIONS FOR AMENDMENT NOS. 328 AND 321 (TAC NOS. ME3262 AND ME3263)
Dear Mr. Krich:
On December 21,2010, the Nuclear Regulatory Commission (NRC) issued Amendment Nos. 328 and 321 to Facility Operating License Nos. DPR-77 and DPR-79 for Sequoyah Nuclear Plant, Units 1 and 2, respectively. These amendments were in response to your application dated January 26, 2010. It was discovered that page 3 of Operating License DPR-77 and page 3 of Operating License DPR-79 were inadvertently excluded from these amendments.
This was an administrative oversight on our part and does not affect the NRC staff's conclusions associated with Amendment Nos. 328 and 321.
Enclosed are the above-mentioned missing pages to be included with the issued amendments.
We regret any inconvenience this may have caused.
Sincerely,
(]J
~':-:'~
~ \\,j IJ Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-327 and 50-328
Enclosures:
As stated cc w/encl: Distribution via Listserv
- 3 (4)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis, instrument calibration or associated with radioactive apparatus or components; and (5)
Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the Sequoyah and Watts Bar Unit 1 Nuclear Plants.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The Tennessee Valley Authority is authorized to operate the facility at reactor core power levels not in excess of 3455 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 328 are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Initial Test Program The Tennessee Valley Authority shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Tennessee Valley Authority's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:
- a.
Elimination of any test identified in Section 14 of TVA's Final Safety Analysis Report as amended as being essential;
- b.
Modification of test objectives, methods or acceptance criteria for any test identified in Section 14 of TVA's Final Safety Analysis Report as amended as being essential;
- c.
Performance of any test at power level different from there described; and Facility Operating License No. DPR-77 Amendment No. 328
-3 (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the Sequoyah and Watts Bar Unit 1 Nuclear Plants.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level The Tennessee Valley Authority is authorized to operate the facility at reactor core power levels not in excess of 3455 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 321 are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3)
Initial Test Program The Tennessee Valley Authority shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Tennessee Valley Authority's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:
- a.
Elimination of any test identified in Section 14 of TVA's Final Safety Analysis Report as amended as being essential;
- b.
Modification of test objectives, methods or acceptance criteria for any test identified in Section 14 of TVA's Final Safety Analysis Report as amended as being essential;
- c.
Performance of any test at power level different from there described; and Facility Operating License No. DPR-79 Amendment No. 321
' ML103560127 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME SLingam CSoia DBroaddus DATE 12/22/10 12/22/10 12/22/10