UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 18, 2010 LICENSEE:
Tennessee Valley Authority (TVA)
FACILITY:
Sequoyah Nuclear Plant, Units 1 and 2 SUB..IECT:
SUMMARY
OF OCTOBER 7,2010, PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA) REGARDING NEW FUEL TRANSITION AT SEOUOYAH NUCLEAR PLANT, UNITS 1 AND 2 On October 7,2010, a Category 1 public meeting was held between Nuclear Regulatory Commission (NRC) staff and representatives of TVA (the licensee). The purpose of the meeting was to discuss the proposed fuel transition from existing AREVA-MARK BW fuel to new AREVA High Thermal Performance fuel for Sequoyah Nuclear Plant, Units 1 and 2 (SON). The enclosure contains a list of attendees. The licensee's presentation slides may be accessed from the NRC Agencywide Documents Access and Management System, Accession No. ML102850311.
Highlights from the Meeting TVA provided an overview of the new fuel transition, and addressed the following:
o Comparison of SON fuel designs o Operating experience o Analytical methodology o License amendment submittal o Schedule TVA plans to submit the license amendment request (LAR) in the early part of next year.
The NRC staff asked TVA to provide detailed technical information in the LAR regarding design change process from EMF-92-116(P)(A), Generic Mechanical Design criteria for PWR [Pressurized Water Reactor] Fuel Designs.
TVA stated that they will use the same analysis approach as used for the Calvert Cliffs fuel transition. The NRC staff recommended that TVA may consider looking into the analytical approach used in application for Prairie Island Nuclear Generating Plant, dated June 26, 2008 (Agencywide Documents Access and Management System Accession No. ML081820137). The NRC staff indicated that the LAR should address any unique aspects of the SON approach.
R. Krich
- 2 No commitments or regulatory decisions were made by the NRC staff during the meeting.
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1564, or by email to siva.lingam@nrc.gov.
('~n..
~.
v<.vv~r"VvV\\.
Siva P. Lingam, Project Manager Plant Licensing Branch 2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES U. S. NUCLEAR REGULATORY COMMISSION (NRC)
PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA).
REGARDING THE NEW FUEL TRANSITION AT SEQUOYAH NUCLEAR PLANT. UNITS 1 AND 2 October 7. 2010 NRC Doug Broaddus Anthony Mendiola Tony Ulses Mark Blumberg Tony Attard Ervin Geiger Mathew Panicker Sam Miranda Benjamin Parks Victor Cusumano Shih-Liang Wu Siva P. Lingam Gerald Waig (By Phone)
TVA Rod cook Stephanie-Newman French Craig S. Faulkner AREVA Patrick Williams David Brown Robert Baxter Gayle Elliott (By Phone)
Larry Flores (By Phone)
Matt Lepcio (By Phone)
Anant Mohan (By Phone)
Parvez Salim (By Phone)
Enclosure
November 18, 2010 R. Krich
- 2 No commitments or regulatory decisions were made by the f\\lRC staff during the meeting.
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1564, or by email to siva.lingam@nrc.gov.
IRA!
Siva P. Lingam, Project Manager Plant Licensing Branch 2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrLACSola G. Waig, NRR RidsNrrPMSequoyah RidsRgn2MailCenter C. Steger, NRR M. Blumberg, NRR N. Coleman, ACRS RidsAcrsAcnw_MailCTR RidsOgcRp RidsNrrDssSrxb N. Sanfilippo, EDO Ridsl\\lrrDssSnpb E. Geiger, NRR A. Attard, NRR V. Cusumano, f\\lRR S. Miranda, NRR M. Panicker, NRR B. Parks, NRR S. Wu, NRR Package Accession No.: ML102850290 Meeting Summary Accession No.: ML102850325 Slides Presentation Accession No : ML102850311 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME SLinQam CSola(THarris for)
DBroaddus DATE 10/25/2010 10/25/2010 11/18/2010 OFFICIAL RECORD COpy