ML083590136 | 24 December 2008 | EN-08-074, Issuance of Notice of Violation and Proposed Civil Penalty in the Amount of $65,000 to Exelon Generation Company and Issuance of Notice of Violation to Wackenhut | |
ML083590110 | 23 December 2008 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection | Safe Shutdown Fitness for Duty Fire Barrier Emergency Lighting Fire Protection Program |
ML19064B218 | 22 December 2008 | Letter to PADEP (L. Mcdonnell) Regarding NPDES Permit PA0009733, Section 316(b) Cooling Water Intake Structure Evaluation - 65533 | |
ML11228A229 | 17 December 2008 | Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants | |
ML083470170 | 11 December 2008 | Response to Request for Additional Information Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability | Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Locked High Radiation Area Exemption Request Fire Protection Program |
ML083390459 | 4 December 2008 | Operator Licensing Examination Approval Peach Bottom Atomic Power Station, Units 2 and 3 | |
ML083120224 | 26 November 2008 | Nuclear Regulatory Commission Public Meeting with Exelon Generation Company, LLC, to Discuss Peach Bottom Request for Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R, Section Iii. G | |
ML083310073 | 26 November 2008 | Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors | |
ML083330187 | 21 November 2008 | Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012 | |
ML083230849 | 17 November 2008 | NRC Office of Investigations Case No. 1-2008-016 - Peach Bottom | |
ML090290228 | 17 November 2008 | Final - Operating Exam (Folder 3) | High winds Half scram Job Performance Measure Scram Discharge Volume Offsite Circuit Power change |
ML090290224 | 17 November 2008 | Summary of Handouts to Applicants (Folder 3) | |
ML090290223 | 17 November 2008 | Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Half scram Stroke time Squib Locked High Radiation Area Scram Discharge Volume Earthquake |
ML090290221 | 17 November 2008 | Final Outlines (Folder 3) | High winds Half scram Scram Discharge Volume |
ML083290241 | 17 November 2008 | Security Safety Conscious Work Environment (SCWE) Surveys | |
ML082890184 | 14 November 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
ML083220143 | 13 November 2008 | Relief Requests Associated with the Third and Fourth Inservice Inspection (Lsi) Intervals and the First and Second Containment Inservice Inspection (Cisi) Intervals - Submittal of Revised Relief Request I4R-47 | VT-2 Scram Discharge Volume |
RS-08-150, Annual Report - Guarantees of Payment of Deferred Premiums | 13 November 2008 | Annual Report - Guarantees of Payment of Deferred Premiums | |
IR 05000277/2008004 | 13 November 2008 | IR 05000277-08-004, 05000278-08-004; on 07/01/2008 - 09/30/2008; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Operability Evaluations; Event Follow-up; Public Radiation Safety | Safe Shutdown Time of Discovery High winds High Radiation Area Fire Barrier Water Inventory Control Internal Flooding Hydrostatic Nondestructive Examination Temporary Modification Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Liquid penetrant Pressure Boundary Leakage Through-Wall Leak Through Wall Leak Scaffolding Unidentified leakage |
ML083230056 | 13 November 2008 | Submittal of Program for the Fourth Ten-Year Interval Inservice Testing Program | Safe Shutdown Reactor Vessel Water Level High Radiation Area Stroke time Squib Incorporated by reference Cold shutdown justification Power Operated Valves |
ML083540401 | 10 November 2008 | Draft - Section a Operating Exam (Folder 2) | High winds Job Performance Measure |
ML083540411 | 10 November 2008 | Draft - Section B Operating Exam (Folder 2) | Job Performance Measure Scram Discharge Volume |
ML083540454 | 10 November 2008 | Draft - Section C Operating Exam (Folder 2) | Half scram Scram Discharge Volume Offsite Circuit Power change |
ML083110593 | 7 November 2008 | Notice of Closed Meeting to Exelon Generation Company for SCWE Survey Review | Inattentive |
ML083190840 | 6 November 2008 | Response to Request for Additional Information - Revision to Technical Specification 4.3.1.1.a Concerning K-Infinity | |
TAC:MD9154 | 6 November 2008 | ||
ML12024A379 | 5 November 2008 | Soarca Comparison to NUREG-1150, Res/Dra | |
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | 14 October 2008 | General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | Surveillance Frequency Control Program Generic Issues Program GOTHIC |
ML083540178 | 13 October 2008 | Draft - RO & SRO Written Exam (Folder 2) | Hot Short Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Half scram Stroke time Squib Locked High Radiation Area Scram Discharge Volume Earthquake |
IR 05000171/2008009 | 10 October 2008 | IR 05000171-08-009, on 07/01-02/2008 and 08/14/2008, Peach Bottom Atomic Power Station, Unit 1 | Process Control Program |
ML082880597 | 10 October 2008 | Inspection Letter 05000171/2008009, Exelon Generation Company, LLC, Peach Bottom Atomic Power Station, Unit 1 | |
ML082880120 | 9 October 2008 | Relief Requests Associated with the Third & Fourth Inservice Inspection Intervals & the First & Second Containment Inservice Inspection Intervals - Response to Request for Additional Information Concerning Relief Request.. | VT-2 Scram Discharge Volume |
ML082900066 | 2 October 2008 | NRC Generic Fundamentals Examination (GFE) Results for Peach Bottom Atomic Power Station, Units 2 & 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
ML082750196 | 1 October 2008 | Issuance of the Core Operating Limits Report for Reload 17, Cycle 18, Revision 5 | Minimum Critical Power Ratio MELLLA |