 Issue dateTitleTopic
ML08359013624 December 2008EN-08-074, Issuance of Notice of Violation and Proposed Civil Penalty in the Amount of $65,000 to Exelon Generation Company and Issuance of Notice of Violation to Wackenhut
ML08359011023 December 2008Notification of Conduct of a Triennial Fire Protection Baseline InspectionSafe Shutdown
Fitness for Duty
Fire Barrier
Emergency Lighting
Fire Protection Program
ML19064B21822 December 2008Letter to PADEP (L. Mcdonnell) Regarding NPDES Permit PA0009733, Section 316(b) Cooling Water Intake Structure Evaluation - 65533
ML11228A22917 December 2008Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants
ML08347017011 December 2008Response to Request for Additional Information Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown CapabilitySafe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Locked High Radiation Area
Exemption Request
Fire Protection Program
ML0833904594 December 2008Operator Licensing Examination Approval Peach Bottom Atomic Power Station, Units 2 and 3
ML08312022426 November 2008Nuclear Regulatory Commission Public Meeting with Exelon Generation Company, LLC, to Discuss Peach Bottom Request for Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R, Section Iii. G
ML08331007326 November 2008Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors
ML08333018721 November 2008Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012
ML08323084917 November 2008NRC Office of Investigations Case No. 1-2008-016 - Peach Bottom
ML09029022817 November 2008Final - Operating Exam (Folder 3)High winds
Half scram
Job Performance Measure
Scram Discharge Volume
Offsite Circuit
Power change
ML09029022417 November 2008Summary of Handouts to Applicants (Folder 3)
ML09029022317 November 2008Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Half scram
Stroke time
Squib
Locked High Radiation Area
Scram Discharge Volume
Earthquake
ML09029022117 November 2008Final Outlines (Folder 3)High winds
Half scram
Scram Discharge Volume
ML08329024117 November 2008Security Safety Conscious Work Environment (SCWE) Surveys
ML08289018414 November 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
ML08322014313 November 2008Relief Requests Associated with the Third and Fourth Inservice Inspection (Lsi) Intervals and the First and Second Containment Inservice Inspection (Cisi) Intervals - Submittal of Revised Relief Request I4R-47VT-2
Scram Discharge Volume
RS-08-150, Annual Report - Guarantees of Payment of Deferred Premiums13 November 2008Annual Report - Guarantees of Payment of Deferred Premiums
IR 05000277/200800413 November 2008IR 05000277-08-004, 05000278-08-004; on 07/01/2008 - 09/30/2008; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Operability Evaluations; Event Follow-up; Public Radiation SafetySafe Shutdown
Time of Discovery
High winds
High Radiation Area
Fire Barrier
Water Inventory Control
Internal Flooding
Hydrostatic
Nondestructive Examination
Temporary Modification
Significance Determination Process
Annual Radioactive Effluent Release Report
Process Control Program
Operability Determination
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leak
Through Wall Leak
Scaffolding
Unidentified leakage
ML08323005613 November 2008Submittal of Program for the Fourth Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Stroke time
Squib
Incorporated by reference
Cold shutdown justification
Power Operated Valves
ML08354040110 November 2008Draft - Section a Operating Exam (Folder 2)High winds
Job Performance Measure
ML08354041110 November 2008Draft - Section B Operating Exam (Folder 2)Job Performance Measure
Scram Discharge Volume
ML08354045410 November 2008Draft - Section C Operating Exam (Folder 2)Half scram
Scram Discharge Volume
Offsite Circuit
Power change
ML0831105937 November 2008Notice of Closed Meeting to Exelon Generation Company for SCWE Survey ReviewInattentive
ML0831908406 November 2008Response to Request for Additional Information - Revision to Technical Specification 4.3.1.1.a Concerning K-Infinity
TAC:MD91546 November 2008
ML12024A3795 November 2008Soarca Comparison to NUREG-1150, Res/Dra
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-0114 October 2008General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01Surveillance Frequency Control Program
Generic Issues Program
GOTHIC
ML08354017813 October 2008Draft - RO & SRO Written Exam (Folder 2)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Half scram
Stroke time
Squib
Locked High Radiation Area
Scram Discharge Volume
Earthquake
IR 05000171/200800910 October 2008IR 05000171-08-009, on 07/01-02/2008 and 08/14/2008, Peach Bottom Atomic Power Station, Unit 1Process Control Program
ML08288059710 October 2008Inspection Letter 05000171/2008009, Exelon Generation Company, LLC, Peach Bottom Atomic Power Station, Unit 1
ML0828801209 October 2008Relief Requests Associated with the Third & Fourth Inservice Inspection Intervals & the First & Second Containment Inservice Inspection Intervals - Response to Request for Additional Information Concerning Relief Request..VT-2
Scram Discharge Volume
ML0829000662 October 2008NRC Generic Fundamentals Examination (GFE) Results for Peach Bottom Atomic Power Station, Units 2 & 3 (Cover Letter Publicly Available, Enclosures Withheld from Public)Generic Fundamentals Examination
ML0827501961 October 2008Issuance of the Core Operating Limits Report for Reload 17, Cycle 18, Revision 5Minimum Critical Power Ratio
MELLLA