Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 07200068/200800119 December 2008IR 072000068-08-01 (Dnms), on 05/21/2008, 06/26/2008, 08/05/2008, 08/27/2008, 09/18/2008, and 12/11/2008, Byron Power StationMoisture Density Gauge
ML08353058518 December 2008Application Accepted - Braidwood/Byron LAR to Adopt TSTF-490
ML08338072216 December 2008Correction Page to Summary of Conference Call Regarding Fall 2008 Steam Generator Tube Inspections (Tac MD9590)
RS-08-161, Technical Specification Bases15 December 2008Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Missed surveillance
Battery sizing
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
BYRON 2008-0119, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.5 December 2008Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.Boric Acid
Weld Overlay
Nondestructive Examination
VT-2
ML0834304875 December 2008Ltr. 12/05/08 Byron Request for Information CDBIProbabilistic Risk Assessment
Temporary Modification
Job Performance Measure
Time Critical Operator Action
RS-08-117, License Amendment Request to Adopt TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Technical Specification4 December 2008License Amendment Request to Adopt TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Technical SpecificationIncorporated by reference
Power change
TAC:ME02064 December 2008
ML0834501614 December 2008GFE Annual Registration Letter - 2009 ExaminationsGeneric Fundamentals Examination
ML0831204873 December 2008Issuance of Amendments Revision to Technical Specifications for Engineered Safety Feature Actuation System InstrumentationSafe Shutdown
Fire Protection Program
ML08331007326 November 2008Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors
IR 05000454/200840325 November 2008IR 05000454-08-403 (Drs), 05000455-08-403(DRS), on 10/20/2008 - 10/24/2008, Byron Station; Routine Security Baseline Inspection - Cover Letter Only
ML08330033324 November 2008Letter to Licensee Notification of Inspection and Request for Information
ML08318078320 November 2008Summary of Conference Call Regarding Fall 2008 Steam Generator Tube Inspections
ML08289018414 November 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
IR 05000454/200800413 November 2008IR 05000454-08-004, 05000455/2008004, on July 1, 2008 - September 30, 2008, Byron Station, Units 1 and 2; Fire Protection, Maintenance Effectiveness; Operability EvaluationSafe Shutdown
High winds
Probabilistic Risk Assessment
Temporary Modification
Tornado-Generated Missile
Significance Determination Process
Job Performance Measure
Fire Protection Program
Operability Assessment
RS-08-150, Annual Report - Guarantees of Payment of Deferred Premiums13 November 2008Annual Report - Guarantees of Payment of Deferred Premiums
IR 05000454/200800912 November 2008IR 05000454-08-009(DRS); 05000455-08-009(DRS); 10/06/2008 Through 10/10/2008; Byron Station, Units 1 and 2; Identification and Resolution of ProblemsLoop seal
Significance Determination Process
ML0831105937 November 2008Notice of Closed Meeting to Exelon Generation Company for SCWE Survey ReviewInattentive
BYRON 2008-0108, Cycle 15 Core Operating Limits Report16 October 2008Cycle 15 Core Operating Limits ReportShutdown Margin
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-0114 October 2008General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01Surveillance Frequency Control Program
Generic Issues Program
GOTHIC
IR 05000454/200800710 October 2008IR 05000454-08-007, (Drs), IR 05000455-08-007, (Drs), on 08/25/2008 - 08/29/2008, Byron Station, Units 1 and 2, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies - Cover LetterB.5.b
TAC:MD83213 October 2008
ML0815804833 October 2008Audit of the Licensee'S Management of Regulatory CommitmentsB.5.b
ML0823407991 October 2008Units 1 and 2 - Issuance of Amendments Revision to Technical Specifications for the Steam Generator ProgramSafe Shutdown
Safe Shutdown Earthquake
Nondestructive Examination
Fire Protection Program
Affidavit
RS-08-118, Additional Information Supporting Request to Revise Containment Tendon Surveillance Program1 October 2008Additional Information Supporting Request to Revise Containment Tendon Surveillance Program