Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:MD3021 | 31 December 2002 | ||
ML080280477 | 31 December 2002 | Information on Haliaeetus Leucocephalus - Bald Eagle | |
ML080230289 | 31 December 2002 | Pennsylvania Bureau of Radiation Protection, Environmental Radiation in Pennsylvania: 2001-2002 Annual Report | Grab sample Chernobyl Stolen |
ML070670329 | 31 December 2002 | Poisonous Plant Slides - Fly Poison | |
ML030020113 | 30 December 2002 | Technical Specifications Pages TS/37.7-1 - TS/3.7-3, TS/3.7-3a - TS/3.7-3b for Amendment 206, Susquehanna, Units 1 & Pages TS/3.7-1 - TS/3.7-3, TS/3.73a - TS/3.7-3b, for Amendment 180 Susquehanna, Units 2 | Ultimate heat sink |
ML023650034 | 30 December 2002 | Issuance of Amendment Nos. 206 & 180, Revising TS 3.7.1 to Add Operability Requirement & Surveillance Requirements for the Ultimate Heat Sink Spray Bypass & Large Valves. TACs MB2119 and MB2120 | Safe Shutdown Ultimate heat sink Probabilistic Risk Assessment |
IR 05000387/2002302 | 24 December 2002 | IR 05000387-02-302, IR 05000388-02-302; December 11, 2002; Susquehanna Units 1 & 2; Initial Operator Licensing Retake Examination. One Applicant Passed the Examination (1 SRO Upgrade Passed) | |
ML023640369 | 24 December 2002 | Transmittal of Certificate Dtd 12/24/02 | |
ML023540437 | 18 December 2002 | Rquest for Additonal Information (RAI) for Emergency Plan (E-Plan) Revisions PLA-5567 - Attachment | Safe Shutdown |
ML023520060 | 18 December 2002 | Draft Request for Additional Information (RAI) Response Regarding Amendment Request for Emergency Plan (E-Plan) Revisions | |
PLA-5563, Response to Request for Additional Information for Proposed Amendment No. 211 to Unit 2, MCPR Safety Limits and Reference Changes | 18 December 2002 | Response to Request for Additional Information for Proposed Amendment No. 211 to Unit 2, MCPR Safety Limits and Reference Changes | |
PLA-5574, November 2002 Monthly Operating Report for Susquehanna Steam Electric Station | 13 December 2002 | November 2002 Monthly Operating Report for Susquehanna Steam Electric Station | Power change |
PLA-5564, Revision to NRC Service List | 12 December 2002 | Revision to NRC Service List | |
ML023510213 | 12 December 2002 | NRC Exam Notification Ltr Dtd 12/12/02 | |
ML023520097 | 11 December 2002 | Draft - NRC Comments | |
ML023520067 | 11 December 2002 | Final Qa/Related Forms | Job Performance Measure |
ML043630116 | 11 December 2002 | Drawing E106256, Rev 18, Susquehanna S.E.S. Unit 1 P&ID Residual Heat Removal. Sheet 3 | |
TAC:MB5610 | 9 December 2002 | ||
ML023430208 | 9 December 2002 | RAI, Minimum Critical Power Ratio Safety Limits & Reference Changes | |
ML023570162 | 9 December 2002 | Final - Section B Operating | Reactor Vessel Water Level Job Performance Measure |
ML023570141 | 3 December 2002 | Final - Outlines (Change Summaries - Optional) | |
PLA-5543, Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2 | 27 November 2002 | Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2 | |
PLA-5559, Registration of Use of Dry Fuel Storage Module B-2 | 26 November 2002 | Registration of Use of Dry Fuel Storage Module B-2 | |
ML023610082 | 25 November 2002 | Synopsis of OI Case 1-2002-002 | |
ML023330442 | 25 November 2002 | Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 Starters | MELLLA |
TAC:MB6300 | 25 November 2002 | ||
ML023290530 | 25 November 2002 | Request for Additional Information - Emergency Plan (E-Plan) Revisions | |
ML023360069 | 22 November 2002 | Reportable Condition Stability Option III: Period Based Algorithm T Specification | |
ML023310569 | 22 November 2002 | Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect | |
ML023520131 | 21 November 2002 | Draft - Section B Operating | Reactor Vessel Water Level Job Performance Measure |
ML023370154 | 19 November 2002 | Revision to Technical Requirements Manual | Reactor Vessel Water Level Process Control Program |
ML023370158 | 19 November 2002 | Technical Requirements Manual, Table of Contents Dtd. 11/18/2002 | Reactor Vessel Water Level Process Control Program |
ML023520103 | 18 November 2002 | Draft - Outlines (Facility Ltr. Dtd Nov. 18, 2002) | |
ML023290162 | 18 November 2002 | Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable | MELLLA |
ML023190429 | 15 November 2002 | Senior Reactor Operator Initial Examinations (Retake) Dtd 11/15/02 | |
ML023170521 | 13 November 2002 | Project Manager Reassignment - Susquehanna Steam Electric Station, Units 1 and 2 | |
IR 05000387/2002005 | 12 November 2002 | IR 05000387-02-005, 05000388-02-005 & 07200028-02-001; PPL Susquehanna, LLC; on 06/30-09/28/2002; Susquehanna Steam Electric Station; Units 1 & 2. Event Follow-up and Operation of an Independent Spent Fuel Storage Installation | |
PLA-5553, CFR 50.46 Report - 30-Day Report & Annual Report | 12 November 2002 | CFR 50.46 Report - 30-Day Report & Annual Report | |
ML023470246 | 11 November 2002 | Revision to EP-PS-365, Emergency Plan - Position Specific Procedure | |
ML023470249 | 11 November 2002 | EP-PS-364, Emergency Plan - Position Specific Procedure | |
ML023470254 | 11 November 2002 | EP-PS-362, Emergency Plan - Position Specific Procedure | |
ML023470264 | 11 November 2002 | Revision to EP-PS-363 - Public Information Manager (PIM) | |
ML023240299 | 11 November 2002 | Revision to Emergency Plan - Position Specific Procedure | |
PLA-5552, Additional Information for Proposed Amendment No. 207 to License NFP-22: Adoption of NRC Approved Generic Changes to Improved Technical Specifications | 8 November 2002 | Additional Information for Proposed Amendment No. 207 to License NFP-22: Adoption of NRC Approved Generic Changes to Improved Technical Specifications | |
ML023230347 | 8 November 2002 | Proposed Change to the SSES Unit 1 & 2 Technical Specification Bases LCO 3.1.7: PLA-5538 | |
PLA-5554, Registration of Use of Dry Fuel Storage Module C-1 | 8 November 2002 | Registration of Use of Dry Fuel Storage Module C-1 | |
ML023190064 | 7 November 2002 | Revision to Improved Technical Specifications Manual Bases Unit 1 | Unanalyzed Condition Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Missed surveillance |
ML023180500 | 7 November 2002 | Approved Amendment to Technical Specifications Bases Manual, Revision 33 | Unanalyzed Condition Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Missed surveillance |
IR 05000387/2002011 | 4 November 2002 | IR 05000387-02-011 & IR 05000388-02-011, on 10/08-11/2002, Susquehanna Steam Electric Station, Units 1&2, Emergency Preparedness Exercise and Performance Indicator Review. Non-Cited Violations Noted | |
ML023050378 | 31 October 2002 | Comment (10) Submitted by PPL Susquehanna Jeff Jeanguenat, Supporting Proposed Rule PR-50 and PR-52 Re Combustile Gas Control in Containment |