ML023570141
| ML023570141 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/03/2002 |
| From: | Chin R Susquehanna |
| To: | Alan Blamey NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| 50-387/02-302, 50-388/02-302, PLA 005568 50-387/02-302, 50-388/02-302 | |
| Download: ML023570141 (2) | |
Text
Susquehanna Learning Center 769 Salem BoulevardP P k Berwick, PA 18603-0467 V
570-542-3353 December 3, 2002 Mr. Alan Blarney USNRC Chief Examiner USNRC Region 1 475 Allendale Road King of Prussia, PA 19406-1415 Susquehanna Learning Center Examination Outline/Materials/References PLA 005568 File A14-13D
Dear Alan:
Enclosed are the Examination Materials for the Susquehanna Steam Electric Station Operator Examination scheduled for December 11, 2002. This information is being provided in accordance with NUREG 1021 Operating Examination Standards for Power Reactors, Rev 8, Supplement 1.
"* JPMs as per ES-301-2 Control Room Systems and Facility Walkthrough Test Outline
"* Applicable Procedure references which facilitate execution of the JPMs Susquehanna Steam Electric Station requests that the enclosed materials be withheld from public disclosure until after the December 2002 examination process is complete.
If you have any questions, please feel free to contact me at 570-542-3553.
Sincerely, Richard E. Chin Examination Coordinator
Response
No Enclosures cc:
J. M. Helsel K. M. Roush Ops Letter File Nuc Records-Site Rcnrcexamoutlineletter6 REC/vah TM
ES-301 Control Room Systems and Facility Walk-Through Test OutlineForm ES-301-2 Facility:
Susquehanna Date of Examination:
12/11/2002 Exam Level SRO(U)
Operating Test No.:
1 B.1 Control Room Systems System / JPM Title Type Safety Code*
Function B1-1 202002 A2.05 (3.8/4.0)
S, M, A 4
RESET Recirc Pump Limiter #2 Runback in accordance with ON-1 64-002 B1-2 206000 A2.17 (3.9/4.3)
Override an Inadvertent Start of HPCI in accordance S, M A 2
with OP-152-001 B1-3 295016 AA 1.06 (4.0/4.1)
Perform Immediate Operator Actions for Control S, D 7
Room Evacuation in accordance with ON-1 00-009 B.2 Facility Walk -Throug B2-1 201001 A2.07 (3.2/3.1)
D, R Shift The CRD Flow Stations From A To B in accordance with OP-255-001 B2-2 264000 A2.09 (3.7/ 4.1) 6 N,L Transfer DG "E for "C" during Station Blackout in accordance with OP-024-004 Attachment C Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate Path, (C)ontrol Room, (S)imulator, (L)ow-Power, (R)CA Susquehanna 12/2/02