ML023520103

From kanterella
Jump to navigation Jump to search
Draft - Outlines (Facility Ltr. Dtd Nov. 18, 2002)
ML023520103
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/18/2002
From: Chin R
Susquehanna
To: Alan Blamey
NRC/RGN-I/DRS/OSB
Conte R
References
50-387/02-302, 50-388/02-302 50-387/02-302, 50-388/02-302
Download: ML023520103 (2)


Text

Susquehanna Learning Center 769 Salem Boulevard Berwick, PA 18603-0467 p 1 570-542-3353 P November 18, 2002 Mr. Alan Blarney USNRC Chief Examiner USNRC Region 1 475 Allendale Road King of Prussia, PA 19406-1415 Susquehanna Learning Center Examination Outline PLA 005561 File A14-13D

Dear Alan:

Enclosed are the Operating Examination Outlines for the Susquehanna Steam Electric Station Operator Examination scheduled for December 11, 2002. This information is being provided in accordance with NUREG 1021 Operating Examination Standards for Power Reactors, Rev 8, Supplement 1.

"* ES-201-2 Examination Outline Quality Checklist

"* ES-301-2 Control Room Systems and Facility Walkthrough Test Outline

"* ES-301-3 Operating Test Quality Checklist Susquehanna Steam Electric Station requests that the enclosed materials be withheld from public disclosure until after the December 2002 examination process is complete.

If you have any questions, please feel free to contact me at 570-542-3553.

Sincerely, Richard E. Chin Examination Coordinator Response: No Enclosures cc: W. W. Hunt J. M. Helsel Ops Letter File Nuc Records-Site Rcnrcexamoutlineletter4 REC/vah

ES-301 Control Room Systems and Facility Walk-Through Test OutlineForm ES-301-2 Facility: Susquehanna - Date of Examination: 12/11/2002 Exam Level (circle one): RO / SRO(l) ROU Operating Test No.: 1 B.1 Contrcol Room Systems System / JPM Title Type Safety Code* Function B1-1 RESET Recirc Pump Limiter #2 Runback in S, M, A 4 accordance with ON-1 64-002 B1-2 Override an Inadvertent Start of HPCI in accordance with OP-152-001 S, M A 2 B1-3 Perform Immediate Operator Actions for Control Room Evacuation in accordance with ON-1 00-009 S, D 7 B.2 Facility Walk .-Throug B2-1 Shift The CRD Flow Stations From A To B in D, R 1 accordance with OP-155-001 B2-2 Transfer DG "E for "C" during Station Blackout in 6 accordance with OP-024-004 Attachment C N, L Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate Path, (C)ontrol Room, (S)imulator, (L)ow-Power, (R)CA