Letter Sequence Other |
---|
|
|
MONTHYEARML0205901602002-03-0505 March 2002 Memo to File Re Request for Additional Information Faxed to the Licensee Residual Heat Removal Service Water System and Ultimate Heat Sink Technical Specifications Modifications (TAC MB2119 and TAC MB2120) Project stage: RAI ML0206100032002-03-19019 March 2002 Request for Additional Information Residual Heat Removal Service Water System and Ultimate Heat Sink Technical Specifications Modifications (TAC Nos. MB2119 and MB2120) Project stage: RAI ML0219802582002-07-17017 July 2002 Safety Evaluation Input for Proposed Changes to the Susquehanna, Units 1 & 2 Technical Specifications Implementing Operability Requirements for the Ultimate Heat Sink Spray Valves (TAC Nos. MB2119 & MB2120) Project stage: Approval ML0300201132002-12-30030 December 2002 Technical Specifications Pages TS/37.7-1 - TS/3.7-3, TS/3.7-3a - TS/3.7-3b for Amendment 206, Susquehanna, Units 1 & Pages TS/3.7-1 - TS/3.7-3, TS/3.73a - TS/3.7-3b, for Amendment 180 Susquehanna, Units 2 Project stage: Other ML0236500342002-12-30030 December 2002 Issuance of Amendment Nos. 206 & 180, Revising TS 3.7.1 to Add Operability Requirement & Surveillance Requirements for the Ultimate Heat Sink Spray Bypass & Large Valves. TACs MB2119 and MB2120 Project stage: Approval 2002-03-19
[Table View] |
Technical Specifications Pages TS/37.7-1 - TS/3.7-3, TS/3.7-3a - TS/3.7-3b for Amendment 206, Susquehanna, Units 1 & Pages TS/3.7-1 - TS/3.7-3, TS/3.73a - TS/3.7-3b, for Amendment 180 Susquehanna, Units 2ML030020113 |
Person / Time |
---|
Site: |
Susquehanna |
---|
Issue date: |
12/30/2002 |
---|
From: |
Colburn T NRC/NRR/DLPM/LPD1 |
---|
To: |
|
---|
References |
---|
TAC MB2119, TAC MB2120 |
Download: ML030020113 (10) |
|
|
---|
Category:Technical Specifications
MONTHYEARML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses ML23010A1082023-01-15015 January 2023 – Issuance of Amendment No. 268 Change to Control Rod Technical Specifications PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence ML22294A1502022-11-17017 November 2022 Issuance of Amendment Nos. 284 and 267 Relocating Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program ML22146A2072022-07-15015 July 2022 Issuance of Amendment Nos. 281 and 264 Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR - NON-PROPRIETARY - ML22101A0282022-03-30030 March 2022 Revised Technical Specification Bases Unit 1 Manual ML20342A2372021-02-18018 February 2021 Issuance of Amendment Nos. 279 and 261 Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements ML20297A5642020-12-22022 December 2020 Issuance of Amendment Nos. 277 and 259 Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 ML19248A8442020-01-17017 January 2020 Issuance of Amendment Nos. 275 and 257 Temporary Changes to Allow Replacement of Emergency Service Water System Piping ML19232A0692019-08-0808 August 2019 Technical Specification Bases Unit 2 Manual ML19232A0682019-08-0808 August 2019 Technical Specification Bases Manual ML19155A2642019-07-16016 July 2019 Issuance of Amendment Nos. 273 and 255 Adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19154A0602019-06-24024 June 2019 Issuance of Amendment Nos. 272 and 254 Technical Specifications to Adopt TSTF-501, Revision 1, Relocated Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML19052A0082019-03-0505 March 2019 Correction to Technical Specifications Page 3.3-45 (Unit 1) and Page 3.6-11 (Unit 2) for Administrative Errors Introduced During the Issuance of Amendment Nos. 271 and 253 ML18222A2032018-09-26026 September 2018 Issuance of Amendment Nos. 271 and 253 Revising Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MG0269 and MG0270; EPID L-2017-LLA-0306) PLA-7733, Correction of Technical Specification Typographical Error for TS 3.6.4.1 (PLA-7733)2018-09-11011 September 2018 Correction of Technical Specification Typographical Error for TS 3.6.4.1 (PLA-7733) ML18017A2272017-12-15015 December 2017 Technical Specification Bases Manual ML18017A2282017-12-15015 December 2017 Technical Specifications Bases Manual ML17221A2892017-08-0909 August 2017 Draft TSTF-542-Variations ML17187A2972017-07-28028 July 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Issuance of Amendments Revising Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF9154 and MF9155) PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A ML17067A4442017-03-27027 March 2017 Issuance of Amendments Secondary Containment Access Openings ML16005A2342016-05-20020 May 2016 Issuance of Amendments Adoption of TSTF-425 ML16062A2162016-03-28028 March 2016 Issuance of Amendments Emergency Action Level Scheme Change PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7406, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-11-11011 November 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 ML15267A3812015-11-0202 November 2015 Issuance of Amendments Approval of Cyber Security Plan Milestone 8 ML15243A1402015-09-30030 September 2015 Issuance of Amendments Revisions to Technical Specification 3.4.10, Reactor Coolant System Pressure and Temperature (P/T) Limits PLA-7334, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-07-0202 July 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7299, Response to Request for Additional Information on Technical Specification Changes to RCS Pressure and Temperature (P/T) Limits2015-04-0606 April 2015 Response to Request for Additional Information on Technical Specification Changes to RCS Pressure and Temperature (P/T) Limits PLA-7119, PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force...2014-10-27027 October 2014 PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force... ML14316A6062014-10-27027 October 2014 PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force... ML14111A0522014-05-14014 May 2014 Issuance of Amendments Regarding Change to Technical Specification Surveillance Requirement 3.5.1.12 ML14036A2572014-02-26026 February 2014 Issuance of Amendment Change to Allow Only One Manual Trip System to Be Operable for the Residual Heat Removal Shutdown Cooling System in Modes 4 and 5 ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment ML13361A0872013-12-11011 December 2013 Revision 112 to Technical Specification Bases Manual PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage ML11221A2712011-09-0808 September 2011 License Amendment, Issuance of Amendment Adoption of TSTF-514, Revision 3 ML11251A1532011-08-24024 August 2011 Technical Requirements Manual, Rev. 69 and Table of Contents, Rev. 20 ML11251A1522011-08-24024 August 2011 Revision 68 to Technical Requirements Manual PLA-6642, Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances2010-11-10010 November 2010 Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances ML1020103852010-07-12012 July 2010 Revision 100 to Technical Specifications Bases Unit 2 Manual ML1020104112010-07-12012 July 2010 Revisions to Technical Specification Bases Manual ML1012605332010-04-28028 April 2010 Technical Specification Bases Manual ML1011003942010-04-0606 April 2010 Technical Specifications Bases Unit 2 Manual, Rev. 98 ML0932901772009-11-24024 November 2009 Technical Specifications for Susquehanna Steam Electric Station, Unit 2 2024-02-27
[Table view] |
Text
3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS)
LCO 3.7.1 Two RHRSW subsystems and the UHS shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
- ~ - - - - -
-1 -'T.-...-.---------------.......
l~~
Enter applicable Conditions and Required Actions of LCO 3.4.8, fResidual Heat Removal (RHR)
Shutdown Cooling System-Hot Shutdown,n for RHR shutdown cooling made inoperable by RHRSW System.
CONDITION REQUIRED ACTION COMPLETION TIME A.------- -NOTE - A.1 Declare the associated Immediately.
Separate Condition entry is RHRSW subsystem allowed for each valve. inoperable.
One valve in Table 3.7.1-1 inoperable.
OR AND One valve In Table 3.7.1-2 A.2 Restore the inoperable valve(s) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from the inoperable, to OPERABLE status. discovery of an inoperable RHRSW subsystem in the opposite loop from the inoperable valve(s).
OR AND One valve inTable 3.7.1-2 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and the same return loop valve in Table 3.7.1-1 inoperable.
(continued)
SUSQUEHANNA - UNIT 1 TS / 3.7-1 Amendment .1-78",
206
RHRSW System and UHS 3.7.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 1 RHRSW B.1 Restore the Unit 1 RHRSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from subsystem inoperable, subsystem to OPERABLE discovery of the status. associated' Unit 2 RHRSW subsystem inoperable AND 7 days C. Both Unit I RHRSW C.1 Restore one Unit 1 RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from subsystems inoperable, subsystem to OPERABLE discovery of one status. Unit 2 RHRSW subsystem not capable of supporting associated Unit 1 RHRSW subsystem AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I associated Completion Time not met. AND OR D.2 Be In MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> UHS inoperable I SUSQUEHANNA -UNIT 1 TS /13.7 Amendment IS-27, 2
RHRSW System and UHS 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify the water level is greater than or equal to 678 feet 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1 inch above Mean Sea Level.
SR 3.7.1.2 Verify the average water temperature.of the UHS is: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- a. - - ------ ----NOTE...-----
Only applicable with both units in MODE 1 or 2, or with either unit in MODE 3 for less than twelve (12) hours.
< 85°F; or
- b. NOT_
Only applicable when either unit has been in MODE 3 for at least twelve (12) hours but not more than twenty-four (24) hours.
< 87oF; or C. - -NOTE--
Only applicable when either unit has been in MODE 3 for at least twenty-four (24) hours.
<88F SR 3.7.1.3 Verify each RHRSW manual, power operated, and 31 days automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.
SR 3.7.1.4 Verify that valves HV-01 222A and B (the spray loop 92 days bypass valves) close upon receipt of a closing signal. I SR 3.7.1.5 Verify that valves HV-01 224A1 and B1 (the large loop 92 days spray array valves) open on receipt of an opening signal. I SUSQUEHANNA - UNIT 1 TS /13.7-3 Amendment 1.8--, ..1.8-', 2
RHRSW System and UHS 3.7.1 TABLE 3.7.1-1 (PAGE 1 OF 1)
Ultimate Heat Sink Spray Cooling Large Array Valves VALVE NUMBER VALVE DESCRIPTION HV-O1224A1 Loop A large spray array valve HV-O1 224B1 Loop B large spray array valve SUSQUEHANNA - UNIT 1 TS / 3.7-3a . Amendment 206 I
RHRSW System and UHS 3.7.1 TABLE 3.7.1-2 Ultimate Heat Sink Spray Bypass Valves VALVE NUMBER VALVE DESCRIPTION HV-01222A Loop A spray array bypass valve HV-01 222B Loop B spray array bypass valve SUSQUEHANNA - UNIT 1 TS / 3.7-3 b Amendment 206 I
3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS)
LCO 3.7.1 Two RHRSW subsystems and the UHS shall be OPERABLE.
APPLICABILITY: MODES 1,2, and 3.
ACTIONS I1%.ll
S.
Enter applicable Conditions and Required Actions of LCO 3.4.8, 'Residual Heat Removal (RHR)
Shutdown Cooling System-Hot Shutdown," for RHR shutdown cooling made inoperable by RHRSW System.
CONDITION REQUIRED ACTION COMPLETION TIME A. ------- NOTE A.1 Declare the associated Immediately.
Separate Condition entry is RHRSW subsystem allowed for each valve. inoperable.
One valve in Table 3.7.1-1 inoperable.
OR AND One valve in Table 3.7.1-2 A.2 Restore the inoperable valve(s) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from the inoperable, to OPERABLE status. discovery of an inoperable RHRSW subsystem in the opposite loop from the inoperable valve(s).
OR AND One valve in Table 3.7.1-2 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and the same return loop valve in Table 3.7.1-1 inoperable. (continued)
(continued)
SUSQUEHANNA - UNIT 2 TS / 3.7-1 Amendment 18.,j 180
RHRSW System and UHS 3.7.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 2 RHRSW B.1 Restore the Unit 2 RHRSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from subsystem inoperable, subsystem to OPERABLE discovery of the status, associated Unit 1 RHRSW subsystem inoperable AND 7 days C. Both Unit 2 RHRSW C.1 Restore one Unit 2 RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from subsystems inoperable, subsystem to OPERABLE discovery of one status. Unit 1 RHRSW subsystem not capable of supporting associated Unit 2 RHRSW subsystem AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I associated Completion lime not met.
AND OR D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> UHS inoperable.
SUSQUEHANNA - UNIT 2 TS / 3.7-2 - Amendment,ý.5.*, *,.1-s6,18
RHRSW System and UHS 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify the water level is greater than or equal to 678 feet 1 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inch above Mean Sea Level.
SR 3.7.1.2 Verify the average water temperature of the UHS is: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- a. NT Only applicable with both units in MODE 1 or 2, or with either unit in MODE 3 for less than twelve (12) hours.
- < 85°F; or
- b. ----------- NOTE Only applicable when either unit has been in MODE 3 for at least twelve (12) hours but not more than twenty four (24) hours.
< 87OF; or
- c. -. NOTE-Only applicable when either unit has been in MODE 3 for at least twenty-four (24) hours.
5 88oF.
SR 3.7.1.3 Verify each RHRSW manual, power operated, and 31 days automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.
SR 3.7.1.4 Verify that valves HV-O1222A and B (the spray loop bypass valves) close upon receipt of a closing signal.
92 days i
SR 3.7.1.5 Verify that valves HV-01224A1 and B1 (the large loop spray 92 days t
array valves) open upon receipt of an opening signal.
SUSQUEHANNA - UNIT 2 TS / 3.7-3 Amendment. 1..r, I-W 18
RHRSW System and UHS 3.7.1 TABLE 3.7.1-1 (PAGE 1 OF 1)
Ultimate Heat Sink Spray Cooling Large Array Valves VALVE NUMBER VALVE DESCRIPTION HV-01224A1 Loop A large spray array valve HV-01224B1 Loop B large spray array valve SUSQUEHANNA - UNIT 2 TS / 3.7-3a - Amendment 180
RHRSW System AND UHS 3.7.1 TABLE 3.7.1-2 (PAGE 1 OF 1)
Ultimate Heat Sink Spray Bypass Valves VALVE NUMBER VALVE DESCRIPTION HV-01222A Loop A spray array bypass valve HV-01 222B Loop B spray array bypass valve SUSQUEHANNA - UNIT 2 TS / 3.7-3b Amendment 180