Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000277/200200824 December 2002IR 05000277-02-008, IR 05000278-02-008, on 11/19-21/2002, Peach Bottom Atomic Power Station, Units 2 & 3. Emergency Preparedness Exercise Report
ML02344030024 December 2002Approval of Proposed Revision 70 of Quality Assurance Topical Report EGC-1A, REV.70 in Accordance with 10 CFR 50.54(a) Requirements for Exelon/Amergen Plants
ML03008005320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal ScheduleAnticipated operational occurrence
Hydrostatic
Nondestructive Examination
ML03008004320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal Schedule
ML02361016819 December 2002Amendment 1 to Application for Renewed Operating LicensesHydrostatic
Aging Management
ML02361038219 December 2002Reply to a Notice of Violation (EA-02-142) Involving Emergency ClassificationSignificance Determination Process
ML02365049718 December 200210 CFR 50.46 Reporting Requirements
ML02360049011 December 2002Response to Request for Additional Information Related to Financial Qualification
ML0236004849 December 2002Submittal of Analytical Evaluation of Reactor Pressure Vessel Closure Head IndicationsHydrostatic
Finite Element Analysis
ML0235204906 December 2002November 2002 Monthly Operating Report for Peach Bottom Units 2 & 3
ML0235100694 December 2002GE Request for Withholding of GE Proprietary Information from Public Disclosure, Peach Bottom Atomic Power Station, Units 2 & 3
ML02345057027 November 2002Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement ProcessOffsite Dose Calculation Manual
Incorporated by reference
Annual Radioactive Effluent Release Report
Press Release-I-02-067, NRC Issues Final Significance Determination for Two Emergency Preparedness Findings at Peach Bottom27 November 2002Press Release-I-02-067: NRC Issues Final Significance Determination for Two Emergency Preparedness Findings at Peach BottomSignificance Determination Process
ML02330028326 November 2002EA-02-121, EA-02-142, Peach Bottom, NOV & Green and White FindingsSignificance Determination Process
Preliminary White Finding
ML02338059925 November 2002Exemption Request from the Requirements of 10 CFR 50.36(c)(1)Safety Limit Minimum Critical Power Ratio
Abnormal operational transient
Exemption Request
Fuel cladding
ML02330028425 November 2002Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Peach Bottom 2 & 3Probabilistic Risk Assessment
ML02333044225 November 2002Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 StartersMELLLA
ML02330052725 November 2002Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Peach Bottom 2 & 3Probabilistic Risk Assessment
Press Release-02-135, NRC Approves Power Uprate for Peach Bottom Nuclear Plant22 November 2002Press Release-02-135: NRC Approves Power Uprate for Peach Bottom Nuclear Plant
ML03101036522 November 2002Issuance of Amendments 247 & 250, 1.62% Increase in Licensed Power LevelShutdown Margin
Hydrostatic
Scram Discharge Volume
ML02336006922 November 2002Reportable Condition Stability Option III: Period Based Algorithm T Specification
ML02331056922 November 2002Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect
ML02325030321 November 2002EN-02-056, Exelon Generation Company, LLC, Peach BottomSignificance Determination Process
ML02331020421 November 2002EP-MA-110-200, Revision 1, Dose Assessment.Met Tower
Fuel cladding
ML02329018420 November 2002Slides for 11/4/2002 Lrsc MeetingAging Management
ML02329016218 November 2002Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not ReportableMELLLA
IR 05000277/20020058 November 2002IR 05000277-02-005, IR 05000278-02-005; on 06/30-09/28/2002; Exelon Generation Company; Peach Bottom Atomic Power Station; Units 2 and 3. Refueling and Other Outage ActivitiesHigh winds
Packing leak
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Control of Heavy Loads
Liquid penetrant
Preliminary White Finding
Scaffolding
Siren
IR 05000277/20023026 November 2002IR Peach Bottom, Units 1 and 2, Reactor Operator and Senior Reactor Operator Initial Examination Report No. 50-277/02-302; 50-278/02-302 Dtd 11/6/02Job Performance Measure
ML0232303524 November 2002October 2002 Monthly Operating Report for Peach Bottom Units 2 & 3
ML02263001124 October 2002Request for Withholding Information from Public Disclosure, TAC Nos. MB5192 and MB5193
ML02297036323 October 2002Meeting with NEI, Surry & North Anna Units 1 & 2, McGuire & Catawba Units 1 & 2, Peach Bottom Units 2 & 3, St. Lucie Units 1 & 2, Fort Calhoun, H. B. Robinson Unit 2, R.E. Ginna, and Virgil C. Summer. the Proposed Agenda Is Attached
ML02297046223 October 2002NRC Exam Notification Letter Dated 10/23/2002
ML02291022822 October 2002Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues
ML02336009218 October 2002Response to Open Item 4.5.2-1 (Enclosure 2Safe Shutdown
Aging Management
ML02301047816 October 2002Request for Additional Information Appendix K Measurement Uncertainty Recovery Power Uprate
ML02287000816 October 2002Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D
ML02296022815 October 2002Meeting Handout for Exelon/Amergen Licensing Meeting with NRC
TAC:MB51927 October 2002
ML0228800187 October 2002GE Request for Withdrawal of Proprietary Information from Public Disclosure Peach Bottom Atomic Power Station Unit 2 & 3
ML0229604273 October 2002September 2002 Monthly Operating Report for Peach Bottom Units 2 & 3
ML0227003142 October 2002Meeting with Exelon Generation Company Licensing Activities
ML0228302781 October 2002Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets
ML0228301781 October 2002Issuance of Core Operating Limits Report for Reload 14, Cycle 15, Revision 0Unanalyzed Condition
Anticipated operational occurrence
ML0228200321 October 2002Stability Option III: Possible Successive Confirmation Count Resets