Letter Sequence Request |
---|
|
|
MONTHYEARML0228800182002-10-0707 October 2002 GE Request for Withdrawal of Proprietary Information from Public Disclosure Peach Bottom Atomic Power Station Unit 2 & 3 Project stage: Withdrawal ML0226300112002-10-24024 October 2002 Request for Withholding Information from Public Disclosure, TAC Nos. MB5192 and MB5193 Project stage: Withholding Request Acceptance ML0310103652002-11-22022 November 2002 Issuance of Amendments 247 & 250, 1.62% Increase in Licensed Power Level Project stage: Approval ML0235100692002-12-0404 December 2002 GE Request for Withholding of GE Proprietary Information from Public Disclosure, Peach Bottom Atomic Power Station, Units 2 & 3 Project stage: Request ML0518900352005-07-0606 July 2005 License Amendment Request Proposed Changes to Extend the Use of Pressure-Temperature Limits Specified in Technical Specifications Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3 Project stage: Request 2002-11-22
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] Category:Proprietary Information Review
MONTHYEARML22186A1772022-07-0707 July 2022 Request for Withholding Information from Public Disclosure Peach Bottom Atomic Power Station, Unit 2 ML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML20111A1702020-04-20020 April 2020 Emergency Preparedness Biennial Exercise Scenario Request to Withhold Previously Submitted Exercise Scenario from Public Release ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17067A0822017-03-28028 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML17065A2982017-03-17017 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML17066A0642017-03-17017 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML16050A1742016-02-29029 February 2016 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3 ML15278A0462016-02-0505 February 2016 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML15278A0552015-10-13013 October 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 3 ML15251A5792015-09-14014 September 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML15246A1612015-09-0808 September 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 3 ML15195A2902015-07-27027 July 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML15124A2242015-07-14014 July 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML15124A2952015-05-20020 May 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML15110A0852015-05-12012 May 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML15084A3422015-04-0606 April 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML15042A5302015-03-23023 March 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML15040A7202015-03-12012 March 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML14345A9882014-12-23023 December 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Station, Unit No. 2 ML14133A1172014-06-0303 June 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 (Tac ME9631 and ME9632) ML14111A3552014-05-0505 May 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 ML14111A3412014-05-0505 May 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 (Tac Nos. ME9631 and ME9632) ML14077A4612014-04-16016 April 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML14064A3012014-03-20020 March 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML14034A3572014-02-0909 February 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML14023A8092014-02-0909 February 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 and 3 ML13345B3102014-01-0808 January 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13322B2302013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13308C4412013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13302B8952013-11-21021 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3 ML13291A1222013-11-0606 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13247A7692013-09-18018 September 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13232A2902013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13232A2772013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13162A6192013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML13161A3972013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13112A8572013-05-0202 May 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13052A8532013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13052A8562013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML12300A0112012-11-13013 November 2012 Request for Withholding Information from Public Disclosure ML12279A2902012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 Nos. 2 and 3 ML12279A2852012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML12250A8552012-09-17017 September 2012 Request for Withholding Information from Public Disclosure 2022-07-07
[Table view] |
Text
W GE Nuclear Energy Nuclear Services 175 Curtner Ave M/C 747 San Jose, CA 95125 (408) 925-1913, Fax (408) 925-6710 E-mail george stramback@gene ge com MFN 02-092 December 4, 2002 U.S Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20852-2738 Attention: Chief, Information Management Branch Program Management Policy Development and Analysis Staff
Subject:
GE Request for Withholding of GE Proprietary Information from Public Disclosure Peach Bottom Atomic Power Station Unit 2 & 3 (TAC Nos.
MB5192 & 5193)
GE received a copy (Reference) of the NRC issued Safety Evaluation (SE) for the Peach Bottom Atomic Power Station (PBAPS) Appendix K power uprate. GE has reviewed the SE and determined that it contains GE proprietary information. Further, the SE is not protected from public disclosure in accordance with 10 CFR 2.790 because the SE has been issued without a proprietary information designation. GE requests that the SE, and all copies, containing the proprietary information be retrieved and withheld from public disclosure.
The basis for the proprietary classification of the information is provided in the GE affidavits covering the Thermal Power Optimization (TPO) Safety Analysis Report (TSAR) for Peach Bottom Atomic Power Station, Units 2 and 3 (NEDC-33064P), and the GE Licensing Topical Report for TPO (TLTR) (NEDC-32938P). In part, the basis for the NRC SE is the proprietary TSAR and proprietary TLTR (See SE References 4 and 7).
Furthermore, the specific information in the subject PBAPS SE is similar, and in some cases identical, to information that also was identified as proprietary during GE's review of the draft SE for Grand Gulf's TPO power uprate. After extensive discussions between GE and the NRC, the final Grand Gulf TPO SE was revised prior to final issuance such that GE proprietary information was not publicly disclosed.
The specific proprietary information contained in the SE is identified below, as well as suggested non-proprietary alternative information that could be used in a revision of the SE. Similar to the Grand Gulf SE information, the suggested non-proprietary alternative makes no technical changes, and does not alter the conclusion, or the basis for any conclusion, currently documented in the SE.
- 1. Section 3.2.7, third paragraph regarding NEDC-31984P - The second line of this paragraph is proprietary because it describes aspects of the GE processes. As an alternative, the entire sentence probably can be deleted because it may not be needed to support approval of the subject PBAPS application. This alternative b0
MFN-02-092 Page 2 may be preferable because the present statement may be inaccurate, for GE did not provide such information to be presented on the PBAPS docket for the subject license amendment application.
- 2. Section 3.9.3.1, fourth paragraph beginning "TLTR (Reference 7) .... - The first four sentences of this paragraph contain proprietary information which describe aspects of the GE processes. The second and third sentences are derived from the generic TLTR and may not be needed to support the PBAPS application. The following alternative non-proprietary statements are suggested for this paragraph:
"TLTR (Reference 7) Section 5.3.5 and Appendix L present a generic evaluation of an ATWS event for a TPO uprate. This evaluation is applicable to the PBAPS analysis for suppression pool temperature. An evaluation demonstrated that the calculated peak vessel bottom pressure meets the ATWS acceptance criteria."
- 3. Section 3.9.3.1, fifth paragraph first line, fourth word. This word conveys the GE proprietary methodology. A non-proprietary alternative would be to simply delete the fourth word of the first line.
In the past, the NRC has provided GE the opportunity to review draft SEs that reference GE proprietary documents to avoid the inadvertent release of proprietary information.
GE strongly requests that such reviews be continued in the future.
Please contact Mike Lalor at (408) 925-2443 or the undersigned if there are any questions.
Sincerely, George Stramback Regulatory Services, Project Manager GE Nuclear Energy (408) 925-1913 george.stramback@ gene.ge.com
MFN-02-092 Page 3
Reference:
NRC Safety Evaluation, Safety Evaluation By the Office of NuclearReactor Regulation Related to Amendment No. 247 to Facility OperatingLicense No.
DPR-44 and Amendment No. 250 to Facility OperatingLicense No. DPR-56, Exelon Generating Company, LLC, PSEG Nuclear LLC, Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos. 50-277 and 50-278, dated November 22, 2002 cc: JP Boska (NRC)
SP Wall (NRC)
P Golub (Exelon)
JF Klapproth (GE/San Jose)
MJ Dick (GE/San Jose)
MA Lalor (GE/San Jose)
ED Schrull (GE/San Jose)