Category:License-Operator
MONTHYEARML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23005A1062023-01-0505 January 2023 Requalification Program Inspection ML22235A7202022-06-14014 June 2022 Administrative Files ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21105A6592021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21012A0542021-01-12012 January 2021 Requalification Program Inspection ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML20105A1822020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19120A3312019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18128A0062018-05-0707 May 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18207A8602017-12-0808 December 2017 Response to Questions Pertaining to Licensed Operator ML17277A1532017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000277/20173012017-05-23023 May 2017 Initial Operator Licensing Examination Report 05000277/2017301 and 05000278/2017301 RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17186A3172017-05-0303 May 2017 Final Qa/Related Forms (Folder 1) ML17072A3262017-03-10010 March 2017 Units 2 and 3 Initial Operator Licensing Operating Test and Written Examination Approval ML17034A4662017-02-0202 February 2017 Requalification Program Inspection - Peach Bottom Atomic Power Station, Units 2 and 3 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 IR 05000277/20153012015-05-18018 May 2015 Er 05000277/2015301; 05000278/2015301; March 23-30, 2015 and April 16, 2015; Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report ML15131A2552015-05-0707 May 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15131A2562015-05-0707 May 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15174A0532015-05-0707 May 2015 Final Qa/Related Forms (Folder 1) ML15169A6482015-04-16016 April 2015 Handouts to Applications (Folder 3) ML15169A6512015-04-11011 April 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15103A1322015-04-10010 April 2015 Initial Operator Licensing Written Examination Approval (Peach Bottom, Units 2 and 3) ML15169A6462015-03-13013 March 2015 Final Outlines (Folder 3) ML15169A6542015-02-19019 February 2015 Draft Written Exam (Folder 2) 2023-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22235A7202022-06-14014 June 2022 Administrative Files ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18128A0062018-05-0707 May 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17277A1532017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000277/20173012017-05-23023 May 2017 Initial Operator Licensing Examination Report 05000277/2017301 and 05000278/2017301 ML17186A3172017-05-0303 May 2017 Final Qa/Related Forms (Folder 1) RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17072A3262017-03-10010 March 2017 Units 2 and 3 Initial Operator Licensing Operating Test and Written Examination Approval ML17034A4662017-02-0202 February 2017 Requalification Program Inspection - Peach Bottom Atomic Power Station, Units 2 and 3 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 IR 05000277/20153012015-05-18018 May 2015 Er 05000277/2015301; 05000278/2015301; March 23-30, 2015 and April 16, 2015; Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report ML15131A2552015-05-0707 May 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15174A0532015-05-0707 May 2015 Final Qa/Related Forms (Folder 1) ML15131A2562015-05-0707 May 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15169A6482015-04-16016 April 2015 Handouts to Applications (Folder 3) ML15169A6512015-04-11011 April 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15103A1322015-04-10010 April 2015 Initial Operator Licensing Written Examination Approval (Peach Bottom, Units 2 and 3) ML15169A6462015-03-13013 March 2015 Final Outlines (Folder 3) ML15169A6542015-02-19019 February 2015 Draft Written Exam (Folder 2) ML15169A6492015-02-13013 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15169A6562015-01-23023 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15169A6522015-01-23023 January 2015 Draft - Outlines (Folder 2) ML15012A0212015-01-0808 January 2015 Requalification Program Inspection-Peach Bottom Atomic Power Station, Units 2 and 3 ML14302A0202014-10-28028 October 2014 Senior Reactor and Reactor Operator Initial License Examinations: Peach Bottom Atomic Power Station, Units 2 and 3 ML13312A0542013-11-0707 November 2013 September 4, 2013,NRC Generic Fundamentals Examination Results for Peach Bottom (Cover Ltr) IR 05000277/20133012013-05-0909 May 2013 Er 05000277-13-301 & 05000278-13-301, March 25-28, 2013, and April 4, 2013, Peach Bottom Atomic Power Station, Units 2 and 3, Initial Operator Licensing Examination Report ML13182A5742013-04-16016 April 2013 Final Qa/Related Forms (Folder 1) ML13098A2562013-04-0101 April 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 3) 2023-06-27
[Table view] |
Text
ber 6, 2002
SUBJECT:
PEACH BOTTOM, UNITS 1 AND 2, REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO.
50-277/02-302;50-278/02-302
Dear Mr. Skolds:
This report transmits the results of the reactor operator (RO) and senior reactor operator (SRO)
licensing examination conducted by the NRC during the period of September 23 - 27, 2002.
This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 8, Supplement 1).
Based on the results of the examination, all four applicants passed all portions of the examination. The four applicants included 3 ROs and 1 upgrade SRO. Examination results indicated that the applicants were well prepared for the examination. Mr. P. Bissett discussed performance insights observed during the examination with Mr. T. VanWyen and others on September 25, 2002. On October 24, 2002, final examination results, including all individual license numbers, were given during a telephone call between Mr. Bissett and Mr. VanWyen and others of your staff. The NRC also expressed their appreciation to the facility for their assistance during the development of the exam by the NRC. No findings of significance were identified.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (SRO/RO Written-Accession Number ML022970351; SRO/RO Operating Section A-Accession Number ML022970354; SRO/RO Operating Section B-Accession Number ML022970359; and SRO/RO Operating Section C-Accession Number ML022970361). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ADAMS.html (the Public Electronic Reading Room).
Should you have any questions regarding this examination, please contact me at (610) 337-5183, or by E-mail at RJC@nrc.gov.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-277, 50-278 License Nos.: DPR-44, DPR-56
Enclosure:
Initial Examination Report No. 50-277/02-302;278/02-302
REGION I==
Docket Nos: 50-277 50-278 License Nos: DPR-44 DPR-56 Report No: 02-302 Licensee: Exelon Nuclear Facility: Peach Bottom Atomic Power Station, Units 2 and 3 Location: 1848 Lay Road Delta, PA 17314-9031 Dates: September 23 - 25, 2002 (Operating Test Administration)
September 27, 2002 (Written Examination Administration)
October 1 - 4, 2002 (Examination Grading)
Examiners: P. Bissett, Senior Operations Engineer (Chief Examiner)
A. Blamey, Senior Operations Engineer C. Sisco, Operations Engineer Approved by: Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety
SUMMARY OF FINDINGS IR 05000277/02-302;05000278/02-302; September 23 - 27, 2002; Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report. Four of four applicants (3 ROs and 1 SRO upgrade) passed the examination.
The written examinations were administered by the facility and the operating tests were administered by three NRC region-based examiners.
A. Inspector Identified Findings No findings of significance were identified.
B. License Identified Findings No findings of significance were identified.
ii
Report Details 1. REACTOR SAFETY Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examinations a. Scope of Review The Peach Bottom examination team developed the written and operating initial examinations and together with the NRC personnel, verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 8, Supplement 1 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors and it met the overall quality goals (range of acceptability) of these standards. The review was conducted both in the Region I office and at the Peach Bottom, Unit 2 and 3 plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- Simulation facility operation was proper.
- Facility licensee completed a test item analysis on the written examination for feedback into the systems approach to training program.
- Examination security requirements were met.
The NRC examiners administered the operating portion of the examination to all four applicants from September 23 - 25, 2002. The written examination was subsequently administered by the Peach Bottom training staff on September 27, 2002.
b. Findings Grading and Results All four applicants (3 ROs and 1upgrade SRO) passed all portions of the initial licensing examination.
There were no post-written examination comments submitted by the licensee.
Examination Preparation and Quality The examination was within the acceptable range.
Examination Administration and Performance No generic performance errors by the applicants were noted during the administration of the examination.
4. OTHER ACTIVITIES
4OA6 Meetings, including Exit On October 24, 2002, the NRC provided conclusions and examination results to the Peach Bottom Operations Training Manager, Mr. T. Van Wyen, via telephone. License numbers for the four applicants were also provided during this time.
The NRC also expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
ATTACHMENT 1 SUPPLEMENTARY INFORMATION KEY POINTS OF CONTACT LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
ATTACHMENT 2 ES501 SIMULATION FACILITY REPORT Facility Licensee: Peach Bottom 2/3 Facility Docket No: 50-277/278 Operating Tests Administered on: September 23 - 25, 2002 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review, are not indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations. No licensee action is required in response to these observations.
While conducting the job performance measure portion of the operating test, NRC examiners observed the following item:
ITEM DESCRIPTION HPCI Flow Indication During a simulator JPM, the HPCI flow indicating meter was observed to be indicating lower than expected. Simulator support personnel confirmed that the software model was correct and identified the meter error as a hardware problem. A Simulator Minor Maintenance Item (MMI #2128) was generated by the licensee to address and resolve this discrepancy.
NUREG-1021 Revision 8 Supplement 1