Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] |
Text
November 25, 2002 Mr. Greg Krueger Exelon Nuclear Nuclear Engineering Division Mid Atlantic Regional Operating Group 200 Exelon Way, KSA 2-N Kennett Square, PA 19348
Dear Mr. Krueger:
Enclosed is a compact disk containing the Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) model for Peach Bottom 2 & 3 and the SAPHIRE 6.75 suite of probabilistic risk assessment (PRA) computer codes. Also enclosed is a copy of the users manual for the Peach Bottom 2 & 3 SPAR model. The SAPHIRE code suite is required to perform analyses with the Revision 3i SPAR model. Both of these software packages are in the form of executable files that can be run directly from the compact disk. These items are for your organizations use only and are not to be distributed further without the consent of the NRC.
Also please note that the information contained in the SPAR model is considered sensitive and should be treated accordingly.
These software packages are provided to facilitate your participation in our onsite QA review of the SPAR model for Peach Bottom 2 & 3, currently scheduled for December 2002. At that time, the Revision 3i (i denotes interim) SPAR model for Peach Bottom 2 & 3 will be reviewed with your PRA staff and benchmarked against your PRA model for these units. Until this review and benchmarking have been conducted and the SPAR model revised to reflect the results of the review, the model is considered to be interim, and should be used by your staff analysts with appropriate discretion.
Questions about the model should be directed to Mr. Robert Buell of the Idaho National Engineering and Environmental Laboratory (INEEL) at (208) 526-9400 (buelrf@inel.gov) .
Questions about the SAPHIRE code suite should be directed to Mr. Ted Wood, INEEL, at (208) 526-8729 (stw@inel.gov). Comments and suggestions may also be directed to either of these gentlemen or to Dr. Patrick OReilly, NRC project manager for SPAR model development, at (301) 415-7570 (pdo@nrc.gov).
G. Krueger 2 If you are interested in receiving on-going technical support for SAPHIRE, you are invited to join the SAPHIRE Users Group. Mr. John Schroeder, INEEL, at (208) 526-8755 (roe@inel.gov) can provide more details about the group and the services offered.
Due to the potential sensitivity of the information contained in the Enclosures, they are not publicly available.
Sincerely, Original Signed By Scott F. Newberry, Director Division of Risk Analysis and Applications Office of Nuclear Regulatory Research
Enclosures:
As stated cc: J. Boska, NRR/LPD1-2 (w/o enclosures)
G. Krueger 2 If you are interested in receiving on-going technical support for SAPHIRE, you are invited to join the SAPHIRE Users Group. Mr. John Schroeder, INEEL, at (208) 526-8755 (roe@inel.gov) can provide more details about the group and the services offered.
Due to the potential sensitivity of the information contained in the Enclosures, they are not publicly available.
Sincerely, Original Signed By Scott F. Newberry, Director Division of Risk Analysis and Applications Office of Nuclear Regulatory Research
Enclosures:
As stated cc: J. Boska, NRR/LPD1-2 (w/o enclosures)
Distribution w/o enclosures:
OERAB RF PWilson, NRR (SRA)
DRAA RF CCarpenter, NRR File Center DCoe, NRR Public SRichard, NRR JStrosnider/AThadani, RES WLanning, RGN-IV DMarksberry, RES ECobey, RGN-I (SRA)
JAndersen, NRR TMcMurtray, SRI MJohnson, NRR DOCUMENT NAME: A:\PEACH BOTTOMLTR.WPD To receive a copy of this document, indicate in the box C = Copy wo/encl E = Copy w/encl N = No copy OFFICE OERAB E OERAB E OERAB C OERAB C DRAA C NAME EGoldfeiz POReilly Mcheok PBaranowsky SNewberry DATE 11/21/02 11/22/02 11/22/02 11/22/02 11/25/02 OFFICIAL RECORD COPY OAR in ADAMS (Y or N)? Y Publicly Available (Y or N)? Y Template No.: RES-006 Accession No.: ML023300527 Res File Code: 2C-3
Date 11/21/2002 ROUTING AND TRANSMITTAL SLIP TO: (Name, office symbol, room #, building, agency/post) Initials Date
- 1. Eli Goldfeiz - Concur - Fill in Y or N for OAR in ADAMS and Publicly EBG 11/21 Available
- 2. Pat OReilly - Concur PDO 11/22
- 3. Mike Cheok - Concur MCC 11/22
- 4. Pat Baranowsky - Concur MCC for 11/22 PWB
- 5. Scott Newberry - Signature SFN 11/25
- 6. Nancy - Distribute - Fill in Template Number, Accession Number and RES NLL 11/25 Code Number 7.
8.
9.
10.
Action File Note and Return Approval For Clearance Per Conversation As Requested For Correction Prepare Reply Circulate For Your Information See Me Comment Investigate X Concurrence/Signature Coordination Justify REMARKS Letter to Mr. G. Krueger - Per your request, enclosed is a compact disk containing the Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) model for Peach Bottom 2 & 3 and the SAPHIRE 6.75 suite of probabilistic risk assessment (PRA) computer codes. Also enclosed is a copy of the users manual for the Peach Bottom 2 & 3 SPAR model.
Room # - Bldg.
FROM: (Name, org. symbol, Agency/Post)
Phone #