Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML060960590 | 31 December 2002 | B/B - UFSAR, Section 11.2, Liquid Waste Management Systems | Boric Acid Offsite Dose Calculation Manual |
RS-02-207, Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1 | 31 December 2002 | Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1 | Hot Short Safe Shutdown Boric Acid Fire Barrier Hydrostatic Coatings Emergency Lighting Fire Protection Program Fire Watch Scaffolding |
ML023440300 | 24 December 2002 | Approval of Proposed Revision 70 of Quality Assurance Topical Report EGC-1A, REV.70 in Accordance with 10 CFR 50.54(a) Requirements for Exelon/Amergen Plants | |
ML023300656 | 19 December 2002 | Summary of Meeting with Excelon Generating Co., to Discuss Uet/Atws Submittal for Byron & Braidwood, Units 1 & 2 | |
RS-02-210, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure | 16 December 2002 | Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure | |
BYRON 2002-0133, November 2002 Monthly Operating Report for Byron Station, Units 1 & 2 | 16 December 2002 | November 2002 Monthly Operating Report for Byron Station, Units 1 & 2 | Offsite Dose Calculation Manual |
RS-02-173, Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump | 12 December 2002 | Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump | |
BYRON 2002-0129, Generator Inservice Inspection Summary Report | 10 December 2002 | Generator Inservice Inspection Summary Report | Nondestructive Examination |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
RS-02-203, Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event | 26 November 2002 | Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event | |
ML023370369 | 25 November 2002 | GFE Registration Letter - February 2003 Examination | Generic Fundamentals Examination |
ML023220659 | 20 November 2002 | RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degration & Reactor Coolant Pressure Boundary Integrity, 60-Day Response | Boric Acid VT-2 Pressure Boundary Leakage |
BYRON 2002-0119, October 2002 Monthly Operating Report for Byron, Units 1 and 2 | 15 November 2002 | October 2002 Monthly Operating Report for Byron, Units 1 and 2 | Offsite Dose Calculation Manual |
ML023370686 | 13 November 2002 | Request for License Amendment for TS Surveillance Requirements for CS Nozzles - Dated 4/19/02 | Foreign Material Exclusion |
ML022950043 | 8 November 2002 | Summary of Conference Calls with Exelon Generation Company Regarding ITS September 2002 Steam Generator Tube Inspection Results | Foreign Material Exclusion |
ML023050067 | 8 November 2002 | Units 1 & 2, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B | |
TAC:MB6636 | 8 November 2002 | ||
ML023370681 | 8 November 2002 | Request for TS Change - Revision to TS 3.7.1, Main Steam Safety Valves, for Byron/Braidwood Plants | |
ML023110394 | 7 November 2002 | Forthcoming Meeting with Exelon Generation Co., LLC (Exelon), to Discuss Uet/Atws Amendment | |
RS-02-191, Revision 13 to Standardized Radiological Emergency Plan Annex | 5 November 2002 | Revision 13 to Standardized Radiological Emergency Plan Annex | |
ML022830478 | 5 November 2002 | Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | Nondestructive Examination |
TAC:MB5876 | 5 November 2002 | ||
ML023090556 | 1 November 2002 | Generic Fundamentals Examination Section of Written Operator Licensing Examination Answer Key for Forms a & B, Grading Results & Individual Answer Sheets for Individuals Taking Test | Generic Fundamentals Examination |
BYRON 2002-0115, LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual | 25 October 2002 | LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual | Fitness for Duty |
BYRON 2002-0109, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration Nozzles | 25 October 2002 | Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration Nozzles | Boric Acid VT-2 |
IR 05000454/2002006 | 25 October 2002 | IR 05000454-02-006 and 05000455-02-006 DRP, on 07/01 - 09/30/2002, Byron Station, Units 1 & 2. Non-Cited Violations Noted | Safe Shutdown Unanalyzed Condition High Radiation Area Ultimate heat sink Grab sample Fire Barrier Stroke time Probabilistic Risk Assessment Nondestructive Examination Temporary Modification VT-2 Significance Determination Process Foreign Material Exclusion Operability Determination Severe Accident Management Guideline Fire Protection Program Siren |
BYRON 2002-0111, Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | 25 October 2002 | Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | Boric Acid VT-2 |
BYRON 2002-0110, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 25 October 2002 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 |
ML022910228 | 22 October 2002 | Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues | |
RS-02-156, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B | 18 October 2002 | Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B | Stroke time |
RS-02-179, Request for Technical Specification Change Extension of Completion Time for Instrument Bus Inverters | 16 October 2002 | Request for Technical Specification Change Extension of Completion Time for Instrument Bus Inverters | High winds Anticipated operational occurrence Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
ML022960228 | 15 October 2002 | Meeting Handout for Exelon/Amergen Licensing Meeting with NRC | |
BYRON 2002-0108, September 2002 Monthly Operating Report for Byron Station Units 1 and 2 | 15 October 2002 | September 2002 Monthly Operating Report for Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2002-0102, Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage | 8 October 2002 | Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage | |
Press Release-III-02-054, NRC Staff Issues Confirmatory Order to Exelon Nuclear in Employee Discrimination Case at Illinois Nuclear Plant | 4 October 2002 | Press Release-III-02-054: NRC Staff Issues Confirmatory Order to Exelon Nuclear in Employee Discrimination Case at Illinois Nuclear Plant | |
ML022700314 | 2 October 2002 | Meeting with Exelon Generation Company Licensing Activities |