Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML06096059031 December 2002B/B - UFSAR, Section 11.2, Liquid Waste Management SystemsBoric Acid
Offsite Dose Calculation Manual
RS-02-207, Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-131 December 2002Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1Hot Short
Safe Shutdown
Boric Acid
Fire Barrier
Hydrostatic
Coatings
Emergency Lighting
Fire Protection Program
Fire Watch
Scaffolding
ML02344030024 December 2002Approval of Proposed Revision 70 of Quality Assurance Topical Report EGC-1A, REV.70 in Accordance with 10 CFR 50.54(a) Requirements for Exelon/Amergen Plants
ML02330065619 December 2002Summary of Meeting with Excelon Generating Co., to Discuss Uet/Atws Submittal for Byron & Braidwood, Units 1 & 2
RS-02-210, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure16 December 2002Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Annexes & Implementing Procedure
BYRON 2002-0133, November 2002 Monthly Operating Report for Byron Station, Units 1 & 216 December 2002November 2002 Monthly Operating Report for Byron Station, Units 1 & 2Offsite Dose Calculation Manual
RS-02-173, Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump12 December 2002Request for License Amendment to Add Technical Specification Surveillance Requirement for Diesel Driven Auxiliary Feedwater Pump
BYRON 2002-0129, Generator Inservice Inspection Summary Report10 December 2002Generator Inservice Inspection Summary ReportNondestructive Examination
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
RS-02-203, Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event26 November 2002Response to Request for Additional Information Regarding a License Amendment Request to Modify the Method of Controlling Unfavorable Exposure Time Related to an Anticipated Transient Without Scram Event
ML02337036925 November 2002GFE Registration Letter - February 2003 ExaminationGeneric Fundamentals Examination
ML02322065920 November 2002RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degration & Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseBoric Acid
VT-2
Pressure Boundary Leakage
BYRON 2002-0119, October 2002 Monthly Operating Report for Byron, Units 1 and 215 November 2002October 2002 Monthly Operating Report for Byron, Units 1 and 2Offsite Dose Calculation Manual
ML02337068613 November 2002Request for License Amendment for TS Surveillance Requirements for CS Nozzles - Dated 4/19/02Foreign Material Exclusion
ML0229500438 November 2002Summary of Conference Calls with Exelon Generation Company Regarding ITS September 2002 Steam Generator Tube Inspection ResultsForeign Material Exclusion
ML0230500678 November 2002Units 1 & 2, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B
TAC:MB66368 November 2002
ML0233706818 November 2002Request for TS Change - Revision to TS 3.7.1, Main Steam Safety Valves, for Byron/Braidwood Plants
ML0231103947 November 2002Forthcoming Meeting with Exelon Generation Co., LLC (Exelon), to Discuss Uet/Atws Amendment
RS-02-191, Revision 13 to Standardized Radiological Emergency Plan Annex5 November 2002Revision 13 to Standardized Radiological Emergency Plan Annex
ML0228304785 November 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.Nondestructive Examination
TAC:MB58765 November 2002
ML0230905561 November 2002Generic Fundamentals Examination Section of Written Operator Licensing Examination Answer Key for Forms a & B, Grading Results & Individual Answer Sheets for Individuals Taking TestGeneric Fundamentals Examination
BYRON 2002-0115, LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual25 October 2002LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an IndividualFitness for Duty
BYRON 2002-0109, Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration Nozzles25 October 2002Response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Head Penetration NozzlesBoric Acid
VT-2
IR 05000454/200200625 October 2002IR 05000454-02-006 and 05000455-02-006 DRP, on 07/01 - 09/30/2002, Byron Station, Units 1 & 2. Non-Cited Violations NotedSafe Shutdown
Unanalyzed Condition
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Stroke time
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
VT-2
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Severe Accident Management Guideline
Fire Protection Program
Siren
BYRON 2002-0111, Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.25 October 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.Boric Acid
VT-2
BYRON 2002-0110, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.25 October 2002Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
ML02291022822 October 2002Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues
RS-02-156, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B18 October 2002Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/BStroke time
RS-02-179, Request for Technical Specification Change Extension of Completion Time for Instrument Bus Inverters16 October 2002Request for Technical Specification Change Extension of Completion Time for Instrument Bus InvertersHigh winds
Anticipated operational occurrence
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
ML02296022815 October 2002Meeting Handout for Exelon/Amergen Licensing Meeting with NRC
BYRON 2002-0108, September 2002 Monthly Operating Report for Byron Station Units 1 and 215 October 2002September 2002 Monthly Operating Report for Byron Station Units 1 and 2Offsite Dose Calculation Manual
BYRON 2002-0102, Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage8 October 2002Steam Generator Tube Repairs Resulting from Byron Station, Unit 2 Cycle 10 Refueling Outage
Press Release-III-02-054, NRC Staff Issues Confirmatory Order to Exelon Nuclear in Employee Discrimination Case at Illinois Nuclear Plant4 October 2002Press Release-III-02-054: NRC Staff Issues Confirmatory Order to Exelon Nuclear in Employee Discrimination Case at Illinois Nuclear Plant
ML0227003142 October 2002Meeting with Exelon Generation Company Licensing Activities