Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16271A09228 September 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016Safe Shutdown
Safety Limit Minimum Critical Power Ratio
Exemption Request
Fuel cladding
ML16278A60128 September 2016Response to Request for Additional Information 2015 Steam Generator Inservice Inspection Report
ML16274A15023 September 2016Vepco/Dominion Resource Services Confirmation of Payment for Fourth Quarterly Installment of Annual Fee
ML16264A26614 September 2016Operator Licensing - Examination Approval 05000280/2016301 and 05000281/2016301
ML16320A5237 September 2016Pre-Submittal Meeting with Surry Power Station Regarding Carbon Fiber Reinforced Polymer Alternative RequestHydrostatic
Finite Element Analysis
Thermoset
Earthquake
Biofouling
ML16251A0982 September 2016Part 21 - Potential Failure of Battery System Connections
ML16244A12631 August 2016Mid-Cycle Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Report 05000280,281/2016005Spent Fuel Pool Instrumentation
ML16243A26730 August 2016Notification of Inspection and Request for InformationHigh Radiation Area
ML16208A00924 August 2016Requests for Relief LMT-R01, LMT-R02, LMT-R03, LMT-P01, and LMT-C01, Alternatives to ASME Code Requirements for Limited Coverage from the Requirements of the ASME CodeNondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld
DM weld
ML16239A40019 August 2016Confirmation of Payment
NRC-2016-0105, Federal Register Notice Correction Use of Areva'S M5 Alloy Fuel Rod Clodding Material16 August 2016Federal Register Notice Correction Use of Areva'S M5 Alloy Fuel Rod Clodding Material
ML16228A31916 August 2016Federal Register Notice Correction Use of Areva'S M5 Alloy Fuel Rod Clodding Material
ML16183A02112 August 2016NRC Report for the Audit of Virginia Electric and Power Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Surry Power Station, Units 1 and 2Fukushima Dai-Ichi
ML16230A5729 August 2016Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage
ML16158A4324 August 2016Safety Evaluation Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051Boric Acid
High winds
Shutdown Margin
Loop seal
High Radiation Area
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Emergency Lighting
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Power Operated Valves
Fire Protection Program
GOTHIC
ML16217A4571 August 2016Generic Fundamentals Examination(Gfe)Generic Fundamentals Examination
ML16195A52527 July 2016Exemption Notice for Fr - Surry Power Station, Unit Nos. 1 and 2, Use of M5 Advanced Zirconium Fuel CladdingExemption Request
Fuel cladding
ML16195A51627 July 2016Exemption for Use of M5 Advanced Zirconium Fuel Cladding from the Requirements of 10 CFR Part 50, Section 50.46Exemption Request
Fuel cladding
ML16214A26226 July 2016Supplemental Information Regarding Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
IR 05000280/201600219 July 2016NRC Integrated Inspection Report 05000280/2016002 and 05000281/2016002Safe Shutdown
Fire Barrier
Temporary Modification
FLEX
Operability Determination
Maintenance Rule Program
Fire Protection Program
Siren
ML16202A06814 July 2016Proposed Licensed Amendment Request Emergency Service Water Pump Allowed Outage Time ExtensionSafe Shutdown
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
CAC:MF812811 July 2016
ML16196A29211 July 2016ISFSI, Millstone, Units 1, 2 & 3, and ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2, and ISFSI Submission of Rev. 21 of Quality Assurance Topical Report for NRC Approval and Submission of Revision 22 for Information OnlyFitness for Duty
Shutdown Margin
Non-Destructive Examination
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
License Renewal
Fire Protection Program
05000280/LER-2016-00111 July 20161 OF 4
LER 16-001-00 for Surry Power Station, Unit 1 and 2, Regarding Emergency Service Water Pump Inoperable Due to Corrosion of Valve Support
ML16190A4205 July 2016June 2016 - Surry NRC Generic Fundamentals Examination Results Cover LetterGeneric Fundamentals Examination
ML16188A1585 July 2016Notification of Inspection and Request for Information Dated 07/05/2016Boric Acid
Nondestructive Examination
Incorporated by reference
Liquid penetrant