Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NOC-AE-16003356, Flooding Mitigating Strategies Assessment (MSA) Report Submittal29 September 2016Flooding Mitigating Strategies Assessment (MSA) Report SubmittalFLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
NOC-AE-16003398, Mitigating Strategies Assessment Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.1 Path 1: GMRS SSE29 September 2016Mitigating Strategies Assessment Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.1 Path 1: GMRS SSESafe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
NOC-AE-16003403, Supplemental Information for the Review of the South Texas Project, Units 1 and 2, License Renewal - (TAC Nos. ME4936 and ME4937)28 September 2016Supplemental Information for the Review of the South Texas Project, Units 1 and 2, License Renewal - (TAC Nos. ME4936 and ME4937)Ultimate heat sink
Coatings
Aging Management
Liquid penetrant
Through-Wall Leak
Through Wall Leak
NOC-AE-16003404, Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives27 September 2016Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives
ML16271A46727 September 2016Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000498/2017007 and 05000499/2017007) and Request for InformationHot Short
Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Multiple Spurious Operation
Emergency Lighting
B.5.b Mitigating Strategies
Maintenance Rule Program
Fire Protection Program
ML16281A27022 September 2016Part 21 - Initial Notification of Masterpact Breaker Fail to Close
ML16278A47122 September 2016Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close
CAC:MF828020 September 2016
ML16264A36320 September 2016Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation TimesFLEX
ML16259A33815 September 2016Amendment to NRC Indemnity - Executed by Nrg
ML16259A33715 September 2016Amendment to NRC Indemnity - Executed by CPS
ML16246A09515 September 2016Correction to 8/26/16 Request for Additional Information Enclosure, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies
ML16259A33915 September 2016Amendment to NRC Indemnity - Executed by Austin
ML16258A20714 September 2016NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 37 Clarification for September 14, 2016 Public Meeting
ML16258A20814 September 2016NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 34 Clarification for September 14, 2016 Public Meeting
ML16258A48114 September 2016NRR E-mail Capture - (External_Sender) South Texas Project, September 20, 2016, Pre-application Public Meeting Presentation: Proposed Emergency Response Organization Augmentation Times Amendment RequestFLEX
ML16258A09613 September 2016NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI SSIB-3-4 Clarification for September 14, 2016 Public Meeting
ML16258A09813 September 2016NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 33 Clarification for September 14, 2016 Public Meeting
ML16258A10012 September 2016NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI APLA-3-2 Clarification for September 14, 2016 Public Meeting
ML16258A10412 September 2016NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI SNPB-3-13 Clarification for September 14, 2016 Public Meeting
NOC-AE-16003412, Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing Application12 September 2016Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing ApplicationLarge early release frequency
IR 05000498/201600512 September 2016Errata for Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)B.5.b
Spent Fuel Pool Instrumentation
ML16118A3119 September 2016Revision of Schedule for the Conduct of the South Texas Project License Renewal Application Review (TAC Nos. ME4938, ME4939, ME5122, and ME5123)Aging Management
NOC-AE-16003409, Submittal of Operations Quality Assurance Plan Change QA-0847 September 2016Submittal of Operations Quality Assurance Plan Change QA-084Fitness for Duty
Probabilistic Risk Assessment
Cyber Security
Large early release frequency
Exemption Request
Fire Protection Program
ML16272A1596 September 2016Extension for Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives
ML16258A3676 September 2016NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution SNPB-3-2, Bullet 4 16 -inch Bounding Break Clarification for September 14, 2016 Public Meeting
ML16238A5271 September 2016Summary of 7/28/16, Public Meeting with STP Nuclear Operating Company to Discuss the License Amendment and Exemption Requests to Use a Risk-Informed Approach to the Resolution of GSI-191 (CAC Nos. MF2400 - MF2409)Boric Acid
Coatings
Exemption Request
IR 05000498/201640131 August 2016Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2016401 and 05000499/2016401)
ML16237A06031 August 2016Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
ML16218A25630 August 2016Aluminum Bronze Selective Leaching Aging Management Program and PWR Reactor Internals Program Inspection Plan Audit Report Regarding the South Texas Project, Units 1 and 2Aging Management
ML16218A36730 August 201607/21/2016 Summary of Public Teleconference Meeting with STP Nuclear Operating Company Discussing Revisions to License Renewal Application Aluminum Bronze Selective Leaching Aging Management Program and Background DocumentCoatings
Aging Management
Through Wall Leak
ML16252A27429 August 2016Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay
ML16214A29126 August 2016Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod AssembliesShutdown Margin
Anticipated operational occurrence
ML16243A47426 August 2016Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays
ML16242A00925 August 2016NRR E-mail Capture - (External_Sender) South Texas Project GSI-191 Draft thermal-hydraulic Responses to Questions for Public Meeting on August 29, 2016
ML16236A03223 August 201608/18/2016 Summary of Conference Call With STP Nuclear Operating Company Concerning the Aluminum Bronze Selective Leaching Aging Management Program in the South Texas Project, License Renewal ApplicationAging Management
ML16242A01023 August 2016NRR E-mail Capture - (External_Sender) FW: South Texas Project GSI-191 Draft Risk Responses to Questions for Public Meeting on August 29, 2016Probabilistic Risk Assessment
ML16236A30423 August 201608/11/2016 Summary of Conference Call Between NRC and STP Nuclear Operating Company Concerning the 2016 Annual Update to the South Texas Project License Renewal Application
ML16236A23122 August 2016NRR E-mail Capture - Email to South Texas Project: Draft follow-up RAI for Snpb Concerning GSI-191
ML16232A60415 August 2016Potentially Unqualified Component in Certain Allen Bradley Timing Relays
ML16238A18615 August 2016Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016
IR 05000498/201600211 August 2016NRC Integrated Inspection Report 05000498/2016002 and 05000499/2016002Functionality Assessment
Missed surveillance
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Scaffolding
ML16228A00210 August 2016NRR E-mail Capture - 8/10/2016 Email: South Texas Project, Unit 1, Permanent Operation with 56 Control Rods - Draft Request for Additional InformationShutdown Margin
Anticipated operational occurrence
IR 05000498/201640328 July 2016Cover Letter for NRC Security Inspection Report 05000498/2016403; 05000499/2016403Affidavit
NOC-AE-16003397, Docket Nos. Stn 50-498, Stn 50-499, Response to RAI 4-2 of Apla Round 4 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application28 July 2016Docket Nos. Stn 50-498, Stn 50-499, Response to RAI 4-2 of Apla Round 4 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing ApplicationBoric Acid
Reactor Vessel Water Level
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Large early release frequency
Earthquake
IR 05000498/201640628 July 2016Cover Letter for NRC Security Inspection Report 05000498/2016406 and 05000499/2016406Affidavit
ML16210A04428 July 2016STP Nuclear Operating Company Handouts for July 28, 2016 Public Meeting on GSI-191
NOC-AE-16003394, Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937)28 July 2016Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937)Coatings
Aging Management
Liquid penetrant
Through Wall Leak
ML16172A01925 July 2016STP Aluminum Bronze Selective Leaching Public Meeting - June 21, 2016Coatings
Aging Management
ML16175A02125 July 2016June 21, 2016, Attendance List