Text
1 NRR-PMDAPEm Resource From:
Sterling, Lance <lsterling@STPEGS.COM>
Sent:
Wednesday, September 14, 2016 1:19 PM To:
Regner, Lisa
Subject:
[External_Sender] Public Meeting Presentation for ERO Augmentation time Emergency Plan Change Attachments:
Public Meeting Presentation for E-Plan Change.pdf
- Lisa, Please find attached the presentation for next Tuesdays public meeting.
Thank you, Lance
Hearing Identifier:
NRR_PMDA Email Number:
3065 Mail Envelope Properties (03fa18c70d8647a4aa7d130249fbfc0d)
Subject:
[External_Sender] Public Meeting Presentation for ERO Augmentation time Emergency Plan Change Sent Date:
9/14/2016 1:19:29 PM Received Date:
9/14/2016 1:19:37 PM From:
Sterling, Lance Created By:
lsterling@STPEGS.COM Recipients:
"Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None Post Office:
CMBXEXCH02.CORP.STPEGS.NET Files Size Date & Time MESSAGE 106 9/14/2016 1:19:37 PM Public Meeting Presentation for E-Plan Change.pdf 292844 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times September 20, 2016
Introductions
- Mike Murray-Regulatory Affairs Manager
- Joe Enoch-Supervisor, Emergency Planning
- Stephanie Rodgers-Staff, Emergency Planning
- Kathleen Van Daalen-Staff, Licensing 2
Desired Outcomes
- Communicate the content of the planned submittal
- Provide a common understanding of the planned submittal 3
4 Proposed Changes
- Increases the STPEGS (STP) Emergency Plan staff augmentation times from 60 and 75 minutes to 90 minutes.
- Increases the required augmentation time for Emergency Response Organization members to respond to their facility
- Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth
- Increases Emergency Response Facilities activation times
- The proposed changes considered the guidance of RIS 2016-10
Regulatory Compliance Applicable Regulatory Documents
- RIS 2016-10 Referenced in LAR Submittal Planning Standard (ERO)
Prior Approval (Example 1.219)
License Request (required)
Guidance (Basis for Plan)
STA (Engineering On-shift)
Guidance for Changes (50.54q)
Endorsement (NUREG-0654)
Expectation (Staff) 5
Comparison (RIS-STP LAR)
- Current License Basis
- Fukushima (FLEX)
- NUREG-0654 Staffing
- Major Functions
- Technology
- Table B-1, 60-90 Minute
- Offsite Agency Impact STP Submittal 6
- May 20, 1993
- No credit taken
- Staffing > NUREG-0654
- Identified
- Described
- Defined
- State/County Concurrence
Comparison (RIS-STP LAR)
RIS 2016-10 Major Functional Tasks Notification and Communication Emergency Director Off-site Surveys / On-site (out-of-plant) / In-Plant Surveys Chemistry/Radio-chemistry Technical Support Repair and Corrective Actions Radiation Protection Dose Assessment STP Submittal 7
Details 2 Dedicated on-shift (RO & NLO) 2 Augmented at 90-minutes Describes personnel and technology On-shift staffed STA role and technology Identified Staffing > NUREG-0654 Staffing and technology On-shift staffed
Site/Program Enhancements
- Technology
- Access/Dosimetry Controls
- Area Radiation Monitors
- Dose Assessment
- Plant Computer (System status trees)
- Auto Notifications Systems
- Web EOC
- Training
- Licensed Operator Requalification and Simulator Modeling
- Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)
- Procedures
- Symptom Based
- Initiating Events (EALs NEI 99-01 Rev. 6)
- Shift Complement 8
9 Staffing Changes
- Increased in 1993 to staffing of 20
- Currently staffed at 25
- Will remain staffed at 25
- Operations Staff
- 2-SMs (ED qualified)
- 2-SROs
- 4-ROs
- 4-NLOs
- 1-STA
Staffing Comparison Major Functional Area NUREG-0654 NUREG-0654 On-shift/30/60 minutes Current STP Staffing On-shift/60/75 minutes Proposed STP Staffing On-shift/90 minutes Operations *
- 1. Shift Sup/Manager
- 2. Shift Foreman/US
- 3. RO
- 4. Plant Operators
- 5. STA
- 6. Operations Discipline Lead 1.
1/0/0 2.
1/0/0 3.
2/0/0 4.
2/0/0 5.
1**/0/0 (not counted in On-shift Total) 6.
None defined 1.
2/0/0 2.
2/0/0 3.
4/0/0 4.
4/0/0 5.
1**/0/0 (not counted in On-shift Total) 6.
0/0/1#
1.
2/0 2.
2/0 3.
4/0 4.
4/0 5.
1**/0 (not counted in On-shift Total) 6.
0/1#
Emergency Direction and Control***
(STA, SS, or Facility Director) 1**/0/0 (not counted in On-shift Total) 2**/0/0 (not counted in On-shift Total) 2**/0 (not counted in On-shift Total)
Notification/
Communication 1/1/2 2/0/2 2/2 10
- Unaffected Unit in operation maintain shift foreman, 1-RO, 1-NLO May be provided by shift personnel assigned other functions Assumed by EOF Director when all facilities are manned
- Filled by personnel with plant operations experience
Major Functional Area NUREG-0654 NUREG-0654 On-shift/30/60 minutes Current STP Staffing On-shift/60/75 minutes Proposed STP Staffing On-shift/90 minutes Radiological Assessment Emergency Director Senior HP Expertise Offsite/Onsite surveys Chemistry/Radio-chem 0/0/1 0/1/0 0/3/3 2/1/2 0/0/1 1/0/0 2/3/4 1/0/1 0/1 1/0 2**/7 1/1 Engineering, Repair and Corrective Actions
- 1. Technical Support STA Core Electrical Mechanical
- 2. Repair and Corr. Actions Rad Waste Mechanical Electrical/I&C I&C 1.
1/0/0 0/1/0 0/0/1 0/0/1 2.
1**/0/2 (not counted in On-shift total) 1**/1/1 (not counted in On-shift Total) 0/1/0 1.
1/0/0 0/1/0 0/0/1 0/0/1 2.
2**/0/0 (not counted in On-shift Total) 1**/0/1 1**and 1/0/1 1/0/0 1.
1/0 0/1 0/1 0/1 2.
2**/0 (not counted in On-shift Total) 1**/1 1**and1/0 1/0 Staffing Comparison (Continued) 11
- May be provided by shift personnel assigned other functions
Staffing Comparison (Continued)
Major Functional Area NUREG-0654 NUREG-0654 On-shift/30/60 minutes Current STP Staffing On-shift/60/75 minutes Proposed STP Staffing On-shift/90 minutes Protective Actions (In Plant) Radiation Protection HP Technicians for:
a.
Access Control b.
HP Coverage c.
Personnel monitor d.
Dosimetry 2**/2/2 (not counted in On-shift Total) 2**/4/0 (not counted in On-shift Total) 2**/4 (not counted in On-shift Total)
Firefighting Per T/S / Local Support /
0 Per T/S / Local Support
/ Local Support Per T/S / Local Support Rescue First Aid 2**/ Local Support (not counted in On-shift Total) 2**/ Local Support /
Local Support 2**/ Local Support Security Site Access Control and Personnel Accountability Per Security Plan Per Security Plan Per Security Plan Totals 10/11/15 = 36 25/8/13 = 46 25/21 = 46 12
- May be provided by shift personnel assigned other functions
Precedent
- Point Beach
- Prairie Island
- RAIs Reviewed 13
Closing Remarks
- Desired Outcome
- Submittal Date
- STP Point of Contact 14