MONTHYEARML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18190A5002018-07-0909 July 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Unit 1 Relief Request - Relief Request RR-ENG-3-16 (L-2018-LLR-0097) ML18121A0322018-04-30030 April 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Technical Specification Change for Standby Diesel Generator Surveillance Requirements Acceptance Criteria (L-2018-LLA-0078) ML18060A3062018-03-0101 March 2018 NRR E-mail Capture - Acceptance Review Results for South Texas Project Relief Request to Extend the Timeframe for Volumetric Exams of B-A and B-D Reactor Vessel Welds (L-2018-LLR-0010) ML18016A1542018-01-16016 January 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Relief Request to Use Ultrasonic Examination Techniques in Lieu of Radiography (L-2017-LLR-0154) 2023-09-21
[Table view] |
Text
NRR-PMDAPEm Resource From: Sterling, Lance <lsterling@STPEGS.COM>
Sent: Wednesday, September 14, 2016 1:19 PM To: Regner, Lisa
Subject:
[External_Sender] Public Meeting Presentation for ERO Augmentation time Emergency Plan Change Attachments: Public Meeting Presentation for E-Plan Change.pdf
- Lisa, Please find attached the presentation for next Tuesdays public meeting.
Thank you, Lance 1
Hearing Identifier: NRR_PMDA Email Number: 3065 Mail Envelope Properties (03fa18c70d8647a4aa7d130249fbfc0d)
Subject:
[External_Sender] Public Meeting Presentation for ERO Augmentation time Emergency Plan Change Sent Date: 9/14/2016 1:19:29 PM Received Date: 9/14/2016 1:19:37 PM From: Sterling, Lance Created By: lsterling@STPEGS.COM Recipients:
"Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None Post Office: CMBXEXCH02.CORP.STPEGS.NET Files Size Date & Time MESSAGE 106 9/14/2016 1:19:37 PM Public Meeting Presentation for E-Plan Change.pdf 292844 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times September 20, 2016
Introductions
- Mike Murray- Regulatory Affairs Manager
- Joe Enoch- Supervisor, Emergency Planning
- Stephanie Rodgers- Staff, Emergency Planning
- Kathleen Van Daalen- Staff, Licensing 2
Desired Outcomes
- Communicate the content of the planned submittal
- Provide a common understanding of the planned submittal 3
Proposed Changes
- Increases the required augmentation time for Emergency Response Organization members to respond to their facility
- Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth
- Increases Emergency Response Facilities activation times
- The proposed changes considered the guidance of RIS 2016-10 4
Regulatory Compliance Applicable Regulatory Referenced in LAR Documents Submittal
- Prior Approval (Example 1.219)
- License Request (required)
- Guidance (Basis for Plan)
- STA (Engineering On-shift)
- Guidance for Changes (50.54q)
Comparison (RIS-STP LAR)
RIS 2016-10 STP Submittal
- Major Functions - Identified
- Technology - Described
- Table B-1, 60-90 Minute - Defined
- State/County Concurrence 6
Comparison (RIS-STP LAR)
RIS 2016-10 STP Submittal Major Functional Tasks Details
- Notification and Communication
- 2 Dedicated on-shift (RO & NLO)
- 2 Augmented at 90-minutes
- Off-site Surveys / On-site (out-of-
- Describes personnel and plant) / In-Plant Surveys technology
- Chemistry/Radio-chemistry
- Repair and Corrective Actions
Site/Program Enhancements
- Access/Dosimetry Controls
- Area Radiation Monitors
- Dose Assessment
- Plant Computer (System status trees)
- Auto Notifications Systems
- Web EOC
- Licensed Operator Requalification and Simulator Modeling
- Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)
- Symptom Based
- Initiating Events (EALs NEI 99-01 Rev. 6)
Staffing Changes
- Increased in 1993 to staffing of 20
- Will remain staffed at 25
Staffing Comparison Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Operations *
- 1. Shift Sup/Manager 1. 1/0/0 1. 2/0/0 1. 2/0
- 2. Shift Foreman/US 2. 1/0/0 2. 2/0/0 2. 2/0
- 3. RO 3. 2/0/0 3. 4/0/0 3. 4/0
- 4. Plant Operators 4. 2/0/0 4. 4/0/0 4. 4/0
- 5. STA 5. 1**/0/0 (not counted in 5. 1**/0/0 (not counted in 5. 1**/0 (not counted in On-shift Total) On-shift Total) On-shift Total)
- 6. Operations Discipline 6. None defined 6. 0/0/1# 6. 0/1#
Lead Emergency Direction and Control*** 1**/0/0 (not counted in 2**/0/0 (not counted in 2**/0 (not counted in (STA, SS, or Facility On-shift Total) On-shift Total) On-shift Total)
Director)
Notification/ 1/1/2 2/0/2 2/2 Communication
- Unaffected Unit in operation maintain shift foreman, 1-RO, 1-NLO
- May be provided by shift personnel assigned other functions
- Assumed by EOF Director when all facilities are manned
- Filled by personnel with plant operations experience 10
Staffing Comparison (Continued)
Major Functional Area NUREG-0654 NUREG-0654 Current STP Staffing Proposed STP Staffing On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Radiological Assessment Emergency Director 0/0/1 0/0/1 0/1 Senior HP Expertise 0/1/0 1/0/0 1/0 Offsite/Onsite surveys 0/3/3 2/3/4 2**/7 Chemistry/Radio-chem 2/1/2 1/0/1 1/1 Engineering, Repair and Corrective Actions
- 1. Technical Support 1. 1. 1.
STA 1/0/0 1/0/0 1/0 Core 0/1/0 0/1/0 0/1 Electrical 0/0/1 0/0/1 0/1 Mechanical 0/0/1 0/0/1 0/1
- 2. Repair and Corr. Actions
- 2. 2. 2.
Rad Waste 1**/0/2 (not counted 2**/0/0 (not counted in 2**/0 (not counted in in On-shift total) On-shift Total) On-shift Total)
Mechanical 1**/0/1 1**/1 Electrical/I&C 1**/1/1 (not counted 1**and 1/0/1 1**and1/0 in On-shift Total)
I&C 0/1/0 1/0/0 1/0
- May be provided by shift personnel assigned other functions 11
Staffing Comparison (Continued)
Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Protective Actions (In Plant) Radiation 2**/2/2 (not counted in 2**/4/0 (not counted in 2**/4 (not counted in Protection HP On-shift Total) On-shift Total) On-shift Total)
Technicians for:
- a. Access Control
- b. HP Coverage
- c. Personnel monitor
- d. Dosimetry Firefighting Per T/S / Local Support / Per T/S / Local Support Per T/S / Local Support 0 / Local Support Rescue First Aid 2**/ Local Support 2**/ Local Support / 2**/ Local Support (not counted in On-shift Total) Local Support Security Site Access Per Security Plan Per Security Plan Per Security Plan Control and Personnel Accountability Totals 10/11/15 = 36 25/8/13 = 46 25/21 = 46
- May be provided by shift personnel assigned other functions 12
Precedent
Closing Remarks