NRR E-mail Capture - (External_Sender) South Texas Project, September 20, 2016, Pre-application Public Meeting Presentation: Proposed Emergency Response Organization Augmentation Times Amendment Request
ML16258A481
Person / Time
Site: South Texas, Perkins  Duke Energy icon.png
Issue date: 09/14/2016
From: Sterling L
South Texas
To: Lisa Regner
Plant Licensing Branch IV
References
MF8280, MF8281
Download: ML16258A481 (16)


Text

1 NRR-PMDAPEm Resource From:

Sterling, Lance <lsterling@STPEGS.COM>

Sent:

Wednesday, September 14, 2016 1:19 PM To:

Regner, Lisa

Subject:

[External_Sender] Public Meeting Presentation for ERO Augmentation time Emergency Plan Change Attachments:

Public Meeting Presentation for E-Plan Change.pdf

Lisa, Please find attached the presentation for next Tuesdays public meeting.

Thank you, Lance

Hearing Identifier:

NRR_PMDA Email Number:

3065 Mail Envelope Properties (03fa18c70d8647a4aa7d130249fbfc0d)

Subject:

[External_Sender] Public Meeting Presentation for ERO Augmentation time Emergency Plan Change Sent Date:

9/14/2016 1:19:29 PM Received Date:

9/14/2016 1:19:37 PM From:

Sterling, Lance Created By:

lsterling@STPEGS.COM Recipients:

"Regner, Lisa" <Lisa.Regner@nrc.gov>

Tracking Status: None Post Office:

CMBXEXCH02.CORP.STPEGS.NET Files Size Date & Time MESSAGE 106 9/14/2016 1:19:37 PM Public Meeting Presentation for E-Plan Change.pdf 292844 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times September 20, 2016

Introductions

  • Mike Murray-Regulatory Affairs Manager
  • Joe Enoch-Supervisor, Emergency Planning
  • Stephanie Rodgers-Staff, Emergency Planning
  • Kathleen Van Daalen-Staff, Licensing 2

Desired Outcomes

  • Communicate the content of the planned submittal
  • Provide a common understanding of the planned submittal 3

4 Proposed Changes

- Increases the required augmentation time for Emergency Response Organization members to respond to their facility

- Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth

- Increases Emergency Response Facilities activation times

  • The proposed changes considered the guidance of RIS 2016-10

Regulatory Compliance Applicable Regulatory Documents

Prior Approval (Example 1.219)

License Request (required)

Guidance (Basis for Plan)

STA (Engineering On-shift)

Guidance for Changes (50.54q)

Endorsement (NUREG-0654)

Expectation (Staff) 5

Comparison (RIS-STP LAR)

RIS 2016-10

  • Current License Basis

- Major Functions

- Technology

- Table B-1, 60-90 Minute

  • Offsite Agency Impact STP Submittal 6
  • May 20, 1993
  • No credit taken

- Identified

- Described

- Defined

  • State/County Concurrence

Comparison (RIS-STP LAR)

RIS 2016-10 Major Functional Tasks Notification and Communication Emergency Director Off-site Surveys / On-site (out-of-plant) / In-Plant Surveys Chemistry/Radio-chemistry Technical Support Repair and Corrective Actions Radiation Protection Dose Assessment STP Submittal 7

Details 2 Dedicated on-shift (RO & NLO) 2 Augmented at 90-minutes Describes personnel and technology On-shift staffed STA role and technology Identified Staffing > NUREG-0654 Staffing and technology On-shift staffed

Site/Program Enhancements

  • Technology

- Access/Dosimetry Controls

- Area Radiation Monitors

- Dose Assessment

- Plant Computer (System status trees)

- Auto Notifications Systems

- Web EOC

  • Training

- Licensed Operator Requalification and Simulator Modeling

- Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)

  • Procedures

- Symptom Based

- Initiating Events (EALs NEI 99-01 Rev. 6)

  • Shift Complement 8

9 Staffing Changes

  • Increased in 1993 to staffing of 20
  • Currently staffed at 25

- Will remain staffed at 25

  • Operations Staff
  • 2-SMs (ED qualified)
  • 2-SROs
  • 4-ROs
  • 4-NLOs
  • 1-STA

Staffing Comparison Major Functional Area NUREG-0654 NUREG-0654 On-shift/30/60 minutes Current STP Staffing On-shift/60/75 minutes Proposed STP Staffing On-shift/90 minutes Operations *

1. Shift Sup/Manager
2. Shift Foreman/US
3. RO
4. Plant Operators
5. STA
6. Operations Discipline Lead 1.

1/0/0 2.

1/0/0 3.

2/0/0 4.

2/0/0 5.

1**/0/0 (not counted in On-shift Total) 6.

None defined 1.

2/0/0 2.

2/0/0 3.

4/0/0 4.

4/0/0 5.

1**/0/0 (not counted in On-shift Total) 6.

0/0/1#

1.

2/0 2.

2/0 3.

4/0 4.

4/0 5.

1**/0 (not counted in On-shift Total) 6.

0/1#

Emergency Direction and Control***

(STA, SS, or Facility Director) 1**/0/0 (not counted in On-shift Total) 2**/0/0 (not counted in On-shift Total) 2**/0 (not counted in On-shift Total)

Notification/

Communication 1/1/2 2/0/2 2/2 10

  • Unaffected Unit in operation maintain shift foreman, 1-RO, 1-NLO May be provided by shift personnel assigned other functions Assumed by EOF Director when all facilities are manned
  1. Filled by personnel with plant operations experience

Major Functional Area NUREG-0654 NUREG-0654 On-shift/30/60 minutes Current STP Staffing On-shift/60/75 minutes Proposed STP Staffing On-shift/90 minutes Radiological Assessment Emergency Director Senior HP Expertise Offsite/Onsite surveys Chemistry/Radio-chem 0/0/1 0/1/0 0/3/3 2/1/2 0/0/1 1/0/0 2/3/4 1/0/1 0/1 1/0 2**/7 1/1 Engineering, Repair and Corrective Actions

1. Technical Support STA Core Electrical Mechanical
2. Repair and Corr. Actions Rad Waste Mechanical Electrical/I&C I&C 1.

1/0/0 0/1/0 0/0/1 0/0/1 2.

1**/0/2 (not counted in On-shift total) 1**/1/1 (not counted in On-shift Total) 0/1/0 1.

1/0/0 0/1/0 0/0/1 0/0/1 2.

2**/0/0 (not counted in On-shift Total) 1**/0/1 1**and 1/0/1 1/0/0 1.

1/0 0/1 0/1 0/1 2.

2**/0 (not counted in On-shift Total) 1**/1 1**and1/0 1/0 Staffing Comparison (Continued) 11

    • May be provided by shift personnel assigned other functions

Staffing Comparison (Continued)

Major Functional Area NUREG-0654 NUREG-0654 On-shift/30/60 minutes Current STP Staffing On-shift/60/75 minutes Proposed STP Staffing On-shift/90 minutes Protective Actions (In Plant) Radiation Protection HP Technicians for:

a.

Access Control b.

HP Coverage c.

Personnel monitor d.

Dosimetry 2**/2/2 (not counted in On-shift Total) 2**/4/0 (not counted in On-shift Total) 2**/4 (not counted in On-shift Total)

Firefighting Per T/S / Local Support /

0 Per T/S / Local Support

/ Local Support Per T/S / Local Support Rescue First Aid 2**/ Local Support (not counted in On-shift Total) 2**/ Local Support /

Local Support 2**/ Local Support Security Site Access Control and Personnel Accountability Per Security Plan Per Security Plan Per Security Plan Totals 10/11/15 = 36 25/8/13 = 46 25/21 = 46 12

    • May be provided by shift personnel assigned other functions

Precedent

  • Point Beach
  • Prairie Island

Closing Remarks

  • Desired Outcome
  • Submittal Date
  • STP Point of Contact 14