Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LR-N16-0180, Submittal of 2016 Annual 10 CFR 50.46 Report30 September 2016Submittal of 2016 Annual 10 CFR 50.46 Report
ML16256A65530 September 2016Hope Creek Generating Station - Request for Relaxation of the Release Point Height Requirement of NRC Order EA-13-109,Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
ML16264A07229 September 2016and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Review of Security Plan, Revision 17, Changes
ML16278A27829 September 2016NRC Office of Investigations Case No. 1-2015-026
ML16265A44928 September 2016Regulatory Audit Plan for October 3-6, 2016, at General Electric - Hitachi in Support of License Amendment Request to Upgrade Hope Creek Generating Station'S Power Range Neutron Monitoring System to a Digital Power Range Neutron MonitoringAnticipated operational occurrence
Cyber Security
LR-N16-0165, Transmittal of Response to Request for Additional Information Regarding Digital Power Range Neutron Monitoring (Prnm) System Upgrade23 September 2016Transmittal of Response to Request for Additional Information Regarding Digital Power Range Neutron Monitoring (Prnm) System UpgradeSafety Limit Minimum Critical Power Ratio
LR-N16-0174, Response to Second Request for Additional Information Regarding Relief Request VR-02 Associated with the Fourth 10-Year Inservice Test Interval23 September 2016Response to Second Request for Additional Information Regarding Relief Request VR-02 Associated with the Fourth 10-Year Inservice Test Interval
ML16281A27022 September 2016Part 21 - Initial Notification of Masterpact Breaker Fail to Close
ML16278A47122 September 2016Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close
ML16266A03122 September 2016NRR E-mail Capture - Hope Creek Generating Station - Updated Draft Hope Creek Audit Plan for GEH Related to the Prnm LAR (MF6768)Anticipated operational occurrence
Cyber Security
HCH-2016-034, Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report21 September 2016Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report
ML16259A20420 September 2016Hope Creek Generating Station - Safety Evaluation - Request to revise technical specifications - safety limit minimum critical power ratio.(TAC NO. MF7793)Minimum Critical Power Ratio
ML16231A21516 September 2016Draft Audit Plan for August 16, 2016 Public Teleconference Between PSEG LLC and the Nuclear Regulatory Commission Concerning Hope Creek Generating Station (HCGS) Power Range Neutron Monitoring (Prnm) System Digital Upgrade License AmendmentCyber Security
ML16256A63912 September 2016Phase 2 Supplemental - License Amendment Request - Digital Power Range Neutron Monitoring (Prnm) System Upgrade
ML16256A64112 September 2016NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses.
LR-N16-0113, NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses.12 September 2016NUREG-0800, Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses.
LR-N16-0164, Core Operating Limits Report, Reload 19, Cycle 20, Revision 127 September 2016Core Operating Limits Report, Reload 19, Cycle 20, Revision 12Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Surveillance Frequency Control Program
LR-N16-0148, Supplemental Information Regarding Request for Relaxation from the Hardened Containment Vent Release Point Height Requirement of NRC Order EA-13-1097 September 2016Supplemental Information Regarding Request for Relaxation from the Hardened Containment Vent Release Point Height Requirement of NRC Order EA-13-109FLEX
IR 05000354/201600531 August 2016Mid-Cycle Assessment Letter for Hope Creek Generating Station Report (05000354/2016005)Spent Fuel Pool Instrumentation
LR-N16-0113, NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.31 August 2016NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.Safe Shutdown Earthquake
Operating Basis Earthquake
Cyber Security
ML16256A64031 August 2016Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment
ML16256A64231 August 2016NED0-33872, Rev. 0, Hope Creek Generating Station Numac Prnm Upgrade Phase 2.Safe Shutdown Earthquake
Operating Basis Earthquake
Cyber Security
LR-N16-0113, Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment31 August 2016Hope Creek Power Range Neutron Monitoring Upgrade - Human Factors Engineering Assessment
ML16242A03325 August 2016NRR E-mail Capture - Acceptance Review - Hope Creek LAR to Adopt TSTF-545 (MF8166)
ML16242A00625 August 2016NRR E-mail Capture - Hope Creek Generating Station - Updated Draft Hope Creek Audit Plan for GEH Related to the Prnm LAR (MF6768)Anticipated operational occurrence
Cyber Security
ML16231A42724 August 2016Request for Additional Information Regarding Relief Request VR-02, Associated with the Fourth 10-Year Inservice Test Interval
LR-N16-0137, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External24 August 2016Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis ExternalHigh winds
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
ML16225A00322 August 2016Status of NRC Operating Reactor Regulatory and Licensing Review Procedures
HCH-2016-031, Submittal of Discharge Monitoring Report for July 201617 August 2016Submittal of Discharge Monitoring Report for July 2016
ML16217A43017 August 2016Request for Additional Information Regarding Digital Power Range Neutron Monitoring System UpgradeMinimum Critical Power Ratio
LR-N16-0113, GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure16 August 2016GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure
ML17186A12116 August 2016Final Qa/Related Forms (Folder 1)Job Performance Measure
ML16231A11016 August 2016Updated Issues List for 08/16/2016 Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System Meeting HandoutCyber Security
MELLLA
IR 05000272/201640416 August 2016IR 05000354/2016404, 05000272/2016404, 05000311/2016404; 07/11/2016 to 07/15/2016; Salem Nuclear Generating Station, Units 1 and 2 and Hope Creek Generating Station; Baseline Security Inspection; Equipment Performance, Testing, MaintenanceAffidavit
ML16217A45515 August 2016Summary of July 19, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of Hope Creek Generating Station'S Power Range Neutron Monitoring System
ML16201A02915 August 2016Summary of June 21, 2016, Teleconference with PSEG Nuclear LLC on the Upgrade of the Hope Creek Generating Station Power Range Neutron Monitoring System to a Digital Power Range Neutron Monitoring System
ML17186A14514 August 2016Final Outlines (Folder 3)
ML16224A30311 August 2016Initial Operator Licensing Operating Test and Written Examination Approval
IR 05000354/20160028 August 2016Integrated Inspection Report 05000354/2016002, April 1, 2016 Through June 30, 2016Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Operability Determination
Maintenance Rule Program
Downpower
Loctite
NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20163 August 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Cyber Security
Pressure and Temperature Limits Report
Exemption Request
ML16215A2273 August 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Cyber Security
Pressure and Temperature Limits Report
Exemption Request
ML16103A3202 August 2016Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents)High winds
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
Containment Hardened Vent
Earthquake
ML16200A2532 August 201608/02/2016 NRC Approval of Request for Withholding Information from Public Disclosure
LR-N16-0140, 2015 Summary of Revised Regulatory Commitments1 August 20162015 Summary of Revised Regulatory Commitments
ML17186A23728 July 2016Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2)
ML17186A24428 July 2016Draft - Outlines (Folder 2)Shutdown Margin
Locked High Radiation Area
TAC:U0192528 July 2016
LR-N16-0077, PSEG Nuclear, LLC - Transmittal of Updated Owners, Officers, Directors, and Executive Personnel (Oodeps)27 July 2016PSEG Nuclear, LLC - Transmittal of Updated Owners, Officers, Directors, and Executive Personnel (Oodeps)
ML16207A01922 July 2016NRR E-mail Capture - Hope Creek Generating Station - Acceptance Review of LAR to Revise the Cyber Security Plan Milestone 8 Implementation Schedule (MF8071, MF8072, and MF8073)Cyber Security
HCH-2016-028, Submittal of Discharge Monitoring Report for June 201621 July 2016Submittal of Discharge Monitoring Report for June 2016NJPDES