Phase 2 Supplemental - License Amendment Request - Digital Power Range Neutron Monitoring (Prnm) System Upgrade
ML16256A639
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/12/2016
From: Davison P
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16256A638 List:
References
CAC MF6768, LAR H15-01, LR-N16-0113
Download: ML16256A639 (4)


Text

Enclosure 6 (6.1, 6.2, and 6.3) Contains Proprietary Information to be Withheld from Public Disclosure Pursuant to 10 CFR 2.390 SEP 1*2 2016 LR-N16-0113 LAR H15-01 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSE:<-1 Nuclear-LLC 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

PHASE 2 SUPPLEMENT-LICENSE AMENDMENT REQUEST-DIGITAL POWER RANGE NEUTRON MONITORING (PRNM) SYSTEM UPGRADE (CAC NO. MF6768)

References

1. PSEG letter to NRC, "License Amendment Request - Digital Power Range Neutron Monitoring (PRNM) System Upgrade," dated September 21, 2015 (ADAMS Accession Nos. ML15265A224 and ML15265A225)
2. NRC letter to PSEG, " Hope Creek Generating Station, Acceptance of Requested Licensing Action Re: Amendment Request Regarding Digital Power Range Neutron Monitoring System Upgrade," dated December 21, 2015 (ADAMS Accession No. ML15338A182)

In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request for Hope Creek Generating Station (HCGS). The proposed amendment would revise the HCGS

___.T._.e=ch._,ni_._ca=I_.,.Sr:>ecifications to reflect the installation of the General Electric-Hitachi (GEH)_Qig._.,.ita_,._I Nuclear Measurement Analysis and Control (NUMAC) Power Range Neutron Monitoring (PRNM) system. Reference 1 provided the Phase 1 information in accordance with Digital I&C ISG-06 Licensing Process. The attachments and enclosures of this letter provide the ISG-06 Phase 2 supplemental information, plus additional supplemental information, as described below:

  • : Human Factors Engineering Assessment (Non-Proprietary). As discussed in References 1 and 2, an assessment of compliance with NUREG-0700 is provided for the PRNM upgrade. This assessment addresses the review elements

SEP 12 2016 (6.1, 6.2, and 6.3) Contains Proprietary Information to be Withheld from Public Disclosure Pursuant to 10 CFR 2.390 Page 2 LR-N16-0113 10 CFR 50.90 identified in NUREG-0711, verifying that human factors engineering (HFE) has been

,integrated into the PRNM upgrade. The assessment inclusively addresses the two HFE elements of the PRNM Licensing Topical Report (L TR) "Confirmation of Plant-Specific Actions" Items 5 and 6 (Section 4.11 of Attachment 1 of Reference 1 ). This assessment also includes a description of the procedure development and the administrative controls required for the PRNM upgrade. This document was previously made available (on June 8, 2016) for audit in the PRNM Reading Room portal. (Proprietary version provided in Enclosure 6.3)

  • : NUREG-0800 Appendix 18-A Assessment. As discussed in Reference 2, and as part of the public teleconference meetings supporting the review of the PRNM upgrade (Open Item #15), an assessment of manual operator actions credited in the diversity and defense-in-depth analyses is provided for the PRNM upgrade. This document was previously made available (on June 8, 2016) for audit in the PRNM Reading Room portal.
  • : Phase 2 ISG-06 Enclosure B Roadmap. A roadmap, or cross-reference, between the ISG-06 Enclosure B document name and the equivalent Phase 2 GEH document is provided. Two variations of the road map are included:
1. ISG-06 Enclosure B Item mapped to the HCGS PRNM GEH Document(s)
2. HCGS PRNM GEH Document mapped to the ISG-06 Enclosure B ltem(s)

The Phase 2 GEH documents are provided in Enclosure 4.1 (NED0-33872, Non Proprietary) and Enclosure 6.1 (NEDC-33872P, Proprietary).

  • : Non-Proprietary GEH Documents o

4.1: NED0-33872, Hope Creek Generating Station NUMAC PRNM Upgrade Phase 2 (Non-Proprietary). The Phase 2 documents associated with the PRNM upgrade are provided (Non-Proprietary).

o 4.2: NED0-33864 Appendix B (NED0-33834), NUMAC Systems Engineering Development Plan (Non-Proprietary). As discussed in the public teleconference meetings (Open Item #5), the proprietary markings in the Phase 1 NEDC-33864P (NED0-33864) Appendix B and D are inconsistent. Sections 4.2 and 4.3 in Appendix B are not marked proprietary, but the same information is also provided in Sections 4.2 and 4.3 of Appendix D, where it is marked as



preprietary:--Appendix-B-Sections-4:2-and-4;-3-should-be-marked-proprietary-to,--:

match Appendix D. Corrected versions of Appendix B proprietary and non-proprietary are provided (Proprietary in Enclosure 6.2).

  • : GEH Affidavits supporting the withholding of information in from public disclosure (6.1, 6.2, and 6.3) Contains Proprietary Information to be Withheld from Public Disclosure Pursuant to 10 CFR 2.390 Page 3 LR-N 16-0113

6.1: NEDC-33872P, Hope Creek Generating Station NUMAC PRNM Upgrade Phase 2 (Proprietary). The Phase 2 documents associated with the PRNM upgrade are provided (Proprietary).

o 6.2: NEDC-33864P Appendix B (NEDE-33834), NUMAC Systems Engineering Development Plan (Proprietary). Corrected proprietary version of Appendix B.

o 6.3: Human Factors Engineering Assessment (Proprietary) (6.1, 6.2, and 6.3) contains proprietary information as defined by 10 CFR 2.390. GEH, as the owner of the proprietary information, has executed affidavit(s) (provided in Enclosure 5) identifying that the proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. GEH requests that the proprietary information in Enclosure 6 (6.1, 6.2, and 6.3) be withheld from public disclosure, in accordance with the requirements of 10 CFR 2.390(a)(4).

PSEG has determined that the information provided in this submittal does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determination previously submitted. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

No new regulatory commitments are established by this submittal. If you have any questions or require additional information, please do not hesitate to contact Mr. Brian Thomas at (856) 339-2022.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 5ee te""'- her \\ 2.., J.. o \\ b (Date)

Respectfully,

?\\>


Paui-Gavisem---

Site Vice President Hope Creek Generating Station J

(6.1, 6.2, and 6.3) Contains Proprietary Information to be Withheld from Public Disclosure Pursuant to 10 CFR 2.390 SEP 12 2016 Page 4 LR-N16-0113 Enclosures

1. Human Factors Engineering Assessment-Non-Proprietary 10 CFR 50.90
2. NUREG-0800 Appendix 18-A Assessment, Crediting Manual Operator Actions in the Diversity and Defense-in-Depth Analyses
3. HCGS PRNM Upgrade -ISG-06 Enclosure B Road map, Phase 2 Documents
4. Non-Proprietary GEH Documents

4.1 NED0-33872

Hope Creek Generating Station NUMAC PRNM Upgrade - Non Proprietary 4.2.

NED0-33864 Appendix B (NED0-33834), NUMAC Systems Engineering Development Plan - Non-Proprietary

5. GEH Affidavits supporting the withholding of information in Enclosure 6 from public disclosure
6. Proprietary Documents

6.1 NEDC-33872P

Hope Creek Generating Station NUMAC PRNM Upgrade Proprietary (Withhold from Public Disclosure Pursuant to 10 CFR 2.390) 6.2.

NEDC-33864P Appendix B (NEDE-33834P), NUMAC Systems Engineering Development Plan -Proprietary (Withhold from Public Disclosure Pursuant to 10 CFR 2.390) 6.3 Human Factors Engineering Assessment-Proprietary (Withhold from Public Disclosure Pursuant to 10 CFR 2.390) cc:

Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. MacEwen, Hope Creek Commitment Tracking Coordinator