Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16235A28730 September 2016Issuance of Amendments Regarding Secondary Containment Drawdown TimeSurveillance Frequency Control Program
Fire Protection Program
ML16231A04129 September 2016Issuance of Amendments Regarding Multiple Technical Specification ChangesReactor Vessel Water Level
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Process Control Program
Power Operated Valves
Offsite Circuit
Fire Protection Program
ML16271A20228 September 2016EN-16-022, Confirmatory Order to Southern Nuclear Operating Company, Inc., (EA-16-163)Enforcement Discretion
Probabilistic Risk Assessment
ML16271A09228 September 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016Safe Shutdown
Safety Limit Minimum Critical Power Ratio
Exemption Request
Fuel cladding
NL-16-1831, Signed Consent and Hearing Wavier Form Regarding Adoption of NFPA 805 in Accordance with 10 CFR 50.48(c)23 September 2016Signed Consent and Hearing Wavier Form Regarding Adoption of NFPA 805 in Accordance with 10 CFR 50.48(c)Enforcement Discretion
ML16281A27022 September 2016Part 21 - Initial Notification of Masterpact Breaker Fail to Close
ML16278A47122 September 2016Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close
NL-16-1564, Revised Technical Specifications Pages for Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-Write.20 September 2016Revised Technical Specifications Pages for Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-Write.Surveillance Frequency Control Program
ML16257A51719 September 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016Safe Shutdown
Safety Limit Minimum Critical Power Ratio
Exemption Request
Fuel cladding
Fire Protection Program
ML16263A03419 September 2016NRR E-mail Capture - NRC Acceptance Review for Amendment Request Regarding the Unit 2 Minimum Critical Power RatioMinimum Critical Power Ratio
ML16250A61119 September 2016Request for Withholding Information from Public Disclosure for Hatch Nuclear Plant, Unit No. 2Minimum Critical Power Ratio
NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 201619 September 2016Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016Safe Shutdown
Safety Limit Minimum Critical Power Ratio
Exemption Request
Fuel cladding
Fire Protection Program
NL-16-1418, Response to Apparent Violation in NRC Inspection Report No. 05000321/2016010, EA-16-1368 September 2016Response to Apparent Violation in NRC Inspection Report No. 05000321/2016010, EA-16-136Weld Overlay
Dissimilar Metal Weld
IR 05000321/20163017 September 2016NRC Operator License Examination Report 05000321/2016301 and 05000366/2016301High Radiation Area
Job Performance Measure
NL-16-1537, Edwin I Hatch Nuclear Plant - Registration of Spent Fuel Cask Use6 September 2016Edwin I Hatch Nuclear Plant - Registration of Spent Fuel Cask Use
CAC:MF81761 September 2016
ML16257A6461 September 2016Email - Acceptance Review Farley, Hatch & Vogtle TSTF 545 & Omn 20
IR 05000321/201600531 August 2016Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Report 05000321/2016005 and 05000366/2016005Spent Fuel Pool Instrumentation
License Renewal
ML16222A29529 August 2016Request for Additional InformationOffsite Dose Calculation Manual
ML16245A25829 August 2016License Amendment Request Concerning Safety Limit Minimum Critical Power RatioMinimum Critical Power Ratio
Fuel cladding
NL-16-1328, License Amendment Request Concerning Safety Limit Minimum Critical Power Ratio29 August 2016License Amendment Request Concerning Safety Limit Minimum Critical Power RatioReactor Vessel Water Level
Anticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
CAC:MF830929 August 2016
NL-16-1571, Supplemental Response Regarding Request to Adopt TSTF-222, Control Rod Scram Times26 August 2016Supplemental Response Regarding Request to Adopt TSTF-222, Control Rod Scram TimesSurveillance Frequency Control Program
CAC:MF502626 August 2016
ML16244A46025 August 2016Updated Final Safety Analysis Report, Drawings. Part 12 of 22
ML16244A46925 August 2016Updated Final Safety Analysis Report, Drawings. Part 15 of 22
ML16244A48025 August 2016Revision 34 to Updated Final Safety Analysis Report, Drawings. Part 21 of 22
ML16244A46625 August 2016Updated Final Safety Analysis Report, Drawings. Part 14 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 14 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 14 of 22
ML16244A46325 August 2016Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 22Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Tornado Missile
Post Accident Monitoring
Hydrostatic
Coatings
VT-2
Emergency Lighting
Incorporated by reference
Aging Management
Design basis earthquake
Earthquake
Fuel cladding
Fire Protection Program
Early Warning Fire Detection
NL-16-1245, Updated Final Safety Analysis Report, Drawings. Part 22 of 2225 August 2016Updated Final Safety Analysis Report, Drawings. Part 22 of 22
ML16244A47125 August 2016Updated Final Safety Analysis Report, Drawings. Part 16 of 22
ML16244A40825 August 2016Edwin I. Hatch, Unit 1 & 2, Updated Final Safety Analysis Report. Part 2 of 22Safe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Tornado Generated Missile
Abnormal operational transient
Tornado Missile Protection
Design basis earthquake
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Earthquake
Power-Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Accidental discharge
Offsite Circuit
Fire Protection Program
Scaffolding
Power change
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 16 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 16 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 22Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Tornado Missile
Post Accident Monitoring
Hydrostatic
Coatings
VT-2
Emergency Lighting
Incorporated by reference
Aging Management
Design basis earthquake
Earthquake
Fuel cladding
Fire Protection Program
Early Warning Fire Detection
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 12 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 12 of 22
NL-16-1245, Edwin I. Hatch, Unit 1 & 2, Updated Final Safety Analysis Report, Technical Requirements Manual. Part 7 of 2225 August 2016Edwin I. Hatch, Unit 1 & 2, Updated Final Safety Analysis Report, Technical Requirements Manual. Part 7 of 22Reactor Vessel Water Level
ML16244A41525 August 2016Updated Final Safety Analysis Report, Technical Requirements Manual. Part 7 of 22Reactor Vessel Water Level
ML16244A38125 August 2016Edwin I. Hatch; Units 1 & 2 - Transmittal of Updated Final Safety Analysis Report, 1 O CFR 50.59 Report, Fire Hazard Analysis Changes, Technical Specifications Bases Changes, Technical Requirements Manual Changes License Renewal Change.Safe Shutdown
Temporary Modification
Foreign Material Exclusion
License Renewal
Fuel cladding
ML16243A47225 August 2016Part 21 Reporting of Defects and Noncompliance
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 15 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 15 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Revision 34 to Updated Final Safety Analysis Report, Drawings. Part 21 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Revision 34 to Updated Final Safety Analysis Report, Drawings. Part 21 of 22
ML16244A48225 August 2016Updated Final Safety Analysis Report, Drawings. Part 20 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 20 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 20 of 22
NL-16-1390, License Amendment Request to Revise Technical Specification Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies, Correction to Attachment 324 August 2016License Amendment Request to Revise Technical Specification Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies, Correction to Attachment 3High winds
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
License Renewal
ND-16-1437, Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval24 August 2016Snubber Program Plan for the Fifth Ten-Year Inservice Testing IntervalSafe Shutdown
ML16225A00322 August 2016Status of NRC Operating Reactor Regulatory and Licensing Review Procedures
IR 05000321/201600212 August 2016NRC Integrated Inspection Report 05000321/2016002 and 05000366/2016002 and Exercise of Enforcement DiscretionOffsite Dose Calculation Manual
Enforcement Discretion
Functionality Assessment
Corrosion bonding
Significance Determination Process
Annual Radioactive Effluent Release Report
Operability Determination
Fire Protection Program
NL-16-1169, Response to Request for Additional Information on Technical Specifications - Revision Request to Implement TSTF-500, DC Electrical Re-Write.12 August 2016Response to Request for Additional Information on Technical Specifications - Revision Request to Implement TSTF-500, DC Electrical Re-Write.Surveillance Frequency Control Program
Battery sizing
IR 05000321/201601011 August 2016NRC Inspection Report 05000321/2016010, February 22, 2016, June 30, 2016Non-Destructive Examination
Weld Overlay
Condition Adverse to Quality
Significance Determination Process
Liquid penetrant
Pressure Boundary Leakage