ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
RA-13-094, Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 125 September 2013Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1
RS-13-237, Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI25 September 2013Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML13268A50925 September 2013NRR E-mail Capture - Seismic Walkdown Delayed Items
ML13269A12719 September 20139/19/2013, E-Mail from J. Nguyen to T. Levering Draft - Peach Bottom ISFSI EA for Your ReviewExemption Request
ML13261A04318 September 2013Requesty for Additional Information Regarding License Amendment Request for Extended Power Uprate
ML13247A76918 September 2013Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13261A15717 September 2013Draft Request for Additional InformationReactor Vessel Water Level
Anticipated operational occurrence
ML13255A37616 September 2013Soarca Peach Bottom Uncertainty Analysis (UA) Acrc Briefing - Sept 2013
ML13255A37716 September 2013MACCS2 Runs to Source Term Crosswalk ACRS Sep 2013Fatality
RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term.16 September 2013Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term.Fukushima Dai-Ichi
Foreign Material Exclusion
ML13260A07613 September 2013Extended Power Uprate License Amendment Request - Supplement 11 Response to Request for Additional InformationOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Power change
RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites12 September 2013Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS SitesFukushima Dai-Ichi
Earthquake
ML13253A41611 September 2013Request for Additional Information Regarding License Amendment Request for Extended Power UprateCode Reconciliation
Earthquake
Flow Induced Vibration
ML13269A0599 September 20139/09/2013, E-mail from B. A. Fuller to John-Chau Nguyen PA DEP Comments on Draft EAExemption Request
ML13269A0256 September 20139/6/2013, E-Mail from J. Nguyen to Mr. Janiti Draft Peach Bottom EA for Your ReviewExemption Request
ML13254A1225 September 2013Attachment 8 - Updated Evacuation Time Estimates for Peach Bottom Atomic Power Station Plume Exposure Pathway and ETE Review Criteria Checklist
RA-13-085, 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island5 September 201310 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island
IR 05000277/20130063 September 2013ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006License Renewal
Power Uprate
TAC:MF264029 August 2013
ML13241A41829 August 2013Extended Power Uprate License Amendment Request - Supplement 10 Response to Request for Additional InformationSafe Shutdown
Multiple Spurious Operation
Fire Protection Program
RS-13-127, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (EA-12-049)28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (EA-12-049)FLEX
Hardened vent
LR-N13-0170, Response to Request for Additional Information - 2013 Decommissioning Funding Status Report28 August 2013Response to Request for Additional Information - 2013 Decommissioning Funding Status Report
RS-13-126, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)FLEX
Spent Fuel Pool Instrumentation
IR 05000277/201340527 August 2013IR 05000277-13-405 and 05000278-13-405; 08/12/13 to 08/14/13; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft ThreatsAffidavit
ML13232A27726 August 2013Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13232A29026 August 2013Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13242A00023 August 2013NRR E-mail Capture - Acceptance Review for License Amendment Request to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel DesignsShutdown Margin
ML13240A00222 August 2013Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional InformationAnticipated operational occurrence
Minimum Critical Power Ratio
MELLLA
ML13238A25321 August 2013Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders
ML13231A02919 August 2013Acceptance Review for TACs MF2509 and MF2510 - Peach Bottom Units 2 and 3 - Relief Request 01A-VRR-3
ML13228A30616 August 2013CFR50.46 Annual Report
RS-13-209, Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors15 August 2013Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors
ML13221A06415 August 2013Request for Additional Information Regarding License Amendment Request for Extended Power UprateOffsite Dose Calculation Manual
Power Uprate
ML13221A55313 August 2013Units 1 and 2 - Extension of Branch Chief Reassignment
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13168A27612 August 2013Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228)
ML13217A4315 August 2013Extended Power Uprate License Amendment Request - Supplement 8 Response to Request for Additional Information - Extended Power UprateSafe Shutdown
Fire Barrier
Coatings
Operator Manual Action
Exemption Request
Fire Protection Program
RS-13-070, Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2 August 2013Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel DesignsShutdown Margin
Recently irradiated fuel
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
IR 05000277/20130031 August 2013IR 05000277-13-003, 05000278-13-003; 04/01/2013 06/30/2013, Peach Bottom Atomic Power Station, Units 2 and 3, Integrated Inspection Report and Independent Spent Fuel Storage Installation Report 07200029-13-001High winds
Fire Barrier
Temporary Modification
Functionality Assessment
Job Performance Measure
Operability Determination
Exemption Request
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
ML19186A38331 July 2013Analysis for the Maryland Department of Natural Resources' Question of the Effect of Peach Bottom Station Uprate on Migratory Fishes. Prepared for Exelon Generation by Normandeau Associates, Inc. and Environmental Resource Management. July
ML13213A28531 July 2013Extended Power Uprate License Amendment Request - Supplement 7, Response to Request for Additional Information - Extended Power UprateSafe Shutdown
RS-13-198, Advisement of Leadership Changes for Exelon Generation Company, LLC31 July 2013Advisement of Leadership Changes for Exelon Generation Company, LLC
ML13211A40330 July 2013EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - SnpbShutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Power change
ML13211A40230 July 2013Extended Power Uprate License Amendment Request - Supplement 6 Response to Request for Additional Information - Extended Power Uprate
ML13211A05429 July 2013Request for Relief from ASME OM Code 5-Year Test Interval for Class 1, Safety Relief Valves/Safety Valves (Srvs/Svs) (Relief Request 01A-VRR-3)Grace period