Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Earthquake Hardened vent Backfit |
RA-13-094, Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | 25 September 2013 | Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | |
RS-13-237, Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 25 September 2013 | Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML13268A509 | 25 September 2013 | NRR E-mail Capture - Seismic Walkdown Delayed Items | |
ML13269A127 | 19 September 2013 | 9/19/2013, E-Mail from J. Nguyen to T. Levering Draft - Peach Bottom ISFSI EA for Your Review | Exemption Request |
ML13261A043 | 18 September 2013 | Requesty for Additional Information Regarding License Amendment Request for Extended Power Uprate | |
ML13247A769 | 18 September 2013 | Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 | |
ML13261A157 | 17 September 2013 | Draft Request for Additional Information | Reactor Vessel Water Level Anticipated operational occurrence |
ML13255A376 | 16 September 2013 | Soarca Peach Bottom Uncertainty Analysis (UA) Acrc Briefing - Sept 2013 | |
ML13255A377 | 16 September 2013 | MACCS2 Runs to Source Term Crosswalk ACRS Sep 2013 | Fatality |
RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | 16 September 2013 | Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | Fukushima Dai-Ichi Foreign Material Exclusion |
ML13260A076 | 13 September 2013 | Extended Power Uprate License Amendment Request - Supplement 11 Response to Request for Additional Information | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Power change |
RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | 12 September 2013 | Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | Fukushima Dai-Ichi Earthquake |
ML13253A416 | 11 September 2013 | Request for Additional Information Regarding License Amendment Request for Extended Power Uprate | Code Reconciliation Earthquake Flow Induced Vibration |
ML13269A059 | 9 September 2013 | 9/09/2013, E-mail from B. A. Fuller to John-Chau Nguyen PA DEP Comments on Draft EA | Exemption Request |
ML13269A025 | 6 September 2013 | 9/6/2013, E-Mail from J. Nguyen to Mr. Janiti Draft Peach Bottom EA for Your Review | Exemption Request |
ML13254A122 | 5 September 2013 | Attachment 8 - Updated Evacuation Time Estimates for Peach Bottom Atomic Power Station Plume Exposure Pathway and ETE Review Criteria Checklist | |
RA-13-085, 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | 5 September 2013 | 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | |
IR 05000277/2013006 | 3 September 2013 | ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006 | License Renewal Power Uprate |
TAC:MF2640 | 29 August 2013 | ||
ML13241A418 | 29 August 2013 | Extended Power Uprate License Amendment Request - Supplement 10 Response to Request for Additional Information | Safe Shutdown Multiple Spurious Operation Fire Protection Program |
RS-13-127, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (EA-12-049) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (EA-12-049) | FLEX Hardened vent |
LR-N13-0170, Response to Request for Additional Information - 2013 Decommissioning Funding Status Report | 28 August 2013 | Response to Request for Additional Information - 2013 Decommissioning Funding Status Report | |
RS-13-126, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | FLEX Spent Fuel Pool Instrumentation |
IR 05000277/2013405 | 27 August 2013 | IR 05000277-13-405 and 05000278-13-405; 08/12/13 to 08/14/13; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats | Affidavit |
ML13232A277 | 26 August 2013 | Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 | |
ML13232A290 | 26 August 2013 | Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 | |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
ML13242A000 | 23 August 2013 | NRR E-mail Capture - Acceptance Review for License Amendment Request to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | Shutdown Margin |
ML13240A002 | 22 August 2013 | Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional Information | Anticipated operational occurrence Minimum Critical Power Ratio MELLLA |
ML13238A253 | 21 August 2013 | Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders | |
ML13231A029 | 19 August 2013 | Acceptance Review for TACs MF2509 and MF2510 - Peach Bottom Units 2 and 3 - Relief Request 01A-VRR-3 | |
ML13228A306 | 16 August 2013 | CFR50.46 Annual Report | |
RS-13-209, Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors | 15 August 2013 | Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors | |
ML13221A064 | 15 August 2013 | Request for Additional Information Regarding License Amendment Request for Extended Power Uprate | Offsite Dose Calculation Manual Power Uprate |
ML13221A553 | 13 August 2013 | Units 1 and 2 - Extension of Branch Chief Reassignment | |
ML13225A557 | 12 August 2013 | Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit | |
ML13228A399 | 12 August 2013 | Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 | |
ML13168A276 | 12 August 2013 | Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228) | |
ML13217A431 | 5 August 2013 | Extended Power Uprate License Amendment Request - Supplement 8 Response to Request for Additional Information - Extended Power Uprate | Safe Shutdown Fire Barrier Coatings Operator Manual Action Exemption Request Fire Protection Program |
RS-13-070, Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | 2 August 2013 | Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | Shutdown Margin Recently irradiated fuel |
ML13161A286 | 2 August 2013 | Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations | Probabilistic Risk Assessment Earthquake |
IR 05000277/2013003 | 1 August 2013 | IR 05000277-13-003, 05000278-13-003; 04/01/2013 06/30/2013, Peach Bottom Atomic Power Station, Units 2 and 3, Integrated Inspection Report and Independent Spent Fuel Storage Installation Report 07200029-13-001 | High winds Fire Barrier Temporary Modification Functionality Assessment Job Performance Measure Operability Determination Exemption Request |
ML13206A427 | 1 August 2013 | Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents | |
ML19186A383 | 31 July 2013 | Analysis for the Maryland Department of Natural Resources' Question of the Effect of Peach Bottom Station Uprate on Migratory Fishes. Prepared for Exelon Generation by Normandeau Associates, Inc. and Environmental Resource Management. July | |
ML13213A285 | 31 July 2013 | Extended Power Uprate License Amendment Request - Supplement 7, Response to Request for Additional Information - Extended Power Uprate | Safe Shutdown |
RS-13-198, Advisement of Leadership Changes for Exelon Generation Company, LLC | 31 July 2013 | Advisement of Leadership Changes for Exelon Generation Company, LLC | |
ML13211A403 | 30 July 2013 | EPU LAR Supplement 6 Attachment 2 - Response to Request for Additional Information - Snpb | Shutdown Margin Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Power change |
ML13211A402 | 30 July 2013 | Extended Power Uprate License Amendment Request - Supplement 6 Response to Request for Additional Information - Extended Power Uprate | |
ML13211A054 | 29 July 2013 | Request for Relief from ASME OM Code 5-Year Test Interval for Class 1, Safety Relief Valves/Safety Valves (Srvs/Svs) (Relief Request 01A-VRR-3) | Grace period |