Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-10-264, Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope29 September 2010Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
IR 05000440/201040623 September 2010Affidavit
ML10264054421 September 2010Acceptance Review: FENOC Delta Mururoa Blu SuitMururoa
L-10-260, Submittal of August 2010 NPDES Discharge Monitoring Report16 September 2010Submittal of August 2010 NPDES Discharge Monitoring Report
IR 05000440/201020115 September 2010NRC Security Inspection Report 05000440/2010201Significance Determination Process
Affidavit
ML10256038513 September 2010Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at the Perry Nuclear Power PlantTemporary Modification
Downpower
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024605372 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
IR 05000440/20104052 September 2010IR 05000440-10-405 (DNMS) on 08/11/2010 for Perry Nuclear Power Plant - NRC ISFSI Security Inspection
ML1024400841 September 2010Mid-Cycle Performance Review and Inspection Plan - Perry Nuclear Power Plant
IR 05000440/201000630 August 2010IR 05000440-10-006, on 06/14/2010 - 08/03/2010; Perry Nuclear Power Plant (Pnpp), Unit 1; Evaluations of Changes, Tests or Experiments and Permanent Plant ModificationsSafe Shutdown
Significance Determination Process
Fire Protection Program
L-10-242, Reply to a Notice of Violation: EA-10-03530 August 2010Reply to a Notice of Violation: EA-10-035
L-10-239, July NPDES Discharge Monitoring Report16 August 2010July NPDES Discharge Monitoring Report
IR 05000440/201030110 August 2010Er 05000440-10-301(DRS); 06/14/2010 - 06/30/2010; Firstenergy Nuclear Operating Company (Fenoc), Perry Nuclear Power Plant, Unit 1. Initial License Examination ReportJob Performance Measure
ML1021702275 August 2010Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the Perry Nuclear Power Plant, Unit 1, End-of-Cycle Plant Performance Assessment
IR 05000440/20100035 August 2010IR 05000440-10-003 on 04/01/2010 - 06/30/2010 for Radiological Hazard Assessment and Exposure Controls, Occupational ALARA Planning and Controls; In-Plant Airborne Radioactivity Control and MitigationHigh Radiation Area
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Operability Determination
Code Reconciliation
Fire Protection Program
Substantial potential for overexposure
Substantial potential for an overexposure
Operability Assessment
Overexposure
L-10-202, Request for Authorization for Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection Suits2 August 2010Request for Authorization for Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection SuitsMururoa
TAC:ME45902 August 2010
IR 05000440/201000830 July 2010IR 05000440-10-008 and Notice of Violation on 07/16/10 for Perry Nuclear Power Plant, Unit 1Significance Determination Process
ML10214047130 July 2010Ltr. 07/30/2010 Perry Re Confirmation of Initial Operator License Examinations
ML10215006928 July 2010NRC Slides for Perry, July 28, 2010; Annual Assessment Meeting
ML10215008528 July 2010Licensee Slides for Perry; July 28, 2010; Annual Assessment Meeting
L-10-220, Submittal of Quarterly Report, Facility Id: 02-43-12-0922 for the Period April 1 Through June 30, 201027 July 2010Submittal of Quarterly Report, Facility Id: 02-43-12-0922 for the Period April 1 Through June 30, 2010
L-10-197, Request for Approval of Cyber Security Plan22 July 2010Request for Approval of Cyber Security PlanCyber Security
L-10-218, Voluntary Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations22 July 2010Voluntary Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
L-10-217, Change to Schedule for Submittal of License Renewal Application22 July 2010Change to Schedule for Submittal of License Renewal Application
Press Release-III-10-030, NRC to Discuss 2009 Performance Assessment for Perry Nuclear Power Plant July 2820 July 2010Press Release-III-10-030: NRC to Discuss 2009 Performance Assessment for Perry Nuclear Power Plant July 28
ML10217019318 July 20102010 Perry Plant Initial License Examination Proposed Written ExaminationSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Loop seal
Half scram
Stroke time
Time to boil
Squib
Missed surveillance
Scram Discharge Volume
Earthquake
Fuel cladding
Power change
ML10217016718 July 20102010 Perry Plant Initial License Examination Proposed Operating TestSafe Shutdown
Half scram
Water Inventory Control
Job Performance Measure
Scram Discharge Volume
Earthquake
Power change
ML10217020618 July 20102010 Perry Plant Initial License Examination Administered Operating TestSafe Shutdown
Water Inventory Control
Job Performance Measure
Earthquake
Power change
ML10217021518 July 20102010 Perry Plant Initial License Operator Examination ES-201-1 FormJob Performance Measure
ML10217021718 July 20102010 Perry Plant Initial License Examination ES-301-1, ES-301-2 Revised Forms
ML10217022018 July 20102010 Perry Plant Initial License Examination ES-401-4 Form
ML10217022418 July 20102010 Perry Plant Initial License Examination ES-401-9 FormDownpower
ML10217022818 July 20102010 Perry Plant Initial License Examination Operating Test Comments
ML10217036418 July 20102010 Perry Plant Outline Submission DocumentsScram Discharge Volume
ML10193001614 July 2010Request for Consent to Extinguish Parental Guaranty
TAC:ME428413 July 2010
L-10-161, (NPDES Permit No. 3IB00016*ID), Request for Approval of an Essential Maintenance Discharge Change13 July 2010(NPDES Permit No. 3IB00016*ID), Request for Approval of an Essential Maintenance Discharge Change
L-10-204, Semi-Annual Sewage Isotopic Report13 July 2010Semi-Annual Sewage Isotopic Report
L-10-216, Submittal of June NPDES Discharge Monitoring Report13 July 2010Submittal of June NPDES Discharge Monitoring Report
L-10-100, CFR 50.55a Request VR-7, One-Time Replacement Frequency Extension13 July 2010CFR 50.55a Request VR-7, One-Time Replacement Frequency Extension
ML10193037912 July 2010Notice of Public Meeting with Firstenergy Nuclear Operating Co., to Discuss End-of-Cycle Assessment of Perry, Unit 1 Performance for Cy 2009
ML10193057912 July 2010Memo 07/12/10 Perry Intent to Play Exercise
ML10193048512 July 2010Confirmation Public Meeting with Firstenergy Nuclear Operating Co., to Discuss 2009 End-of-Cycle Performance Assessment for Perry Nuclear Power Plant