Issue date | Title | Topic | |
---|---|---|---|
IR 05000352/2010402 | 30 September 2010 | IR 05000352-10-402, and IR 05000353-10-402, on 06/28/2010 - 08/23/2010, Limerick Generating Station, Access Control. (Letter Only) | Significance Determination Process Affidavit |
ML102710368 | 30 September 2010 | Request for Additional Information Regarding Proposed Technical Specificaiton Allowed Outage Time Extensions to Support Residual Heat Removal Service Water (RHRSW) Maintenance | |
ML102720677 | 29 September 2010 | Initial Operator Licensing Examination Operating Test Approval (Limerick Generating Station, Units 1 and 2) | |
ML102920667 | 29 September 2010 | Final Outlines (Folder 3) | Safe Shutdown Severe Accident Management Guideline Fire Watch |
ML102920669 | 29 September 2010 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Safe Shutdown Shutdown Margin Half scram Hydrostatic Locked High Radiation Area Scram Discharge Volume Earthquake Fuel cladding Fire Watch Hourly Fire Watch |
ML102920673 | 29 September 2010 | Handouts to Applicants (Folder 3) | |
ML102920676 | 29 September 2010 | Final Operating Exam (Section a, B, and C) (Folder 3) | |
ML102710355 | 28 September 2010 | Electronic Transmission, Draft Request for Additional Information Regarding Proposed Technical Specification Allowed Outage Time Extensions to Support Residual Heat Removal Service Water (RHRSW) Maintenance | |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102571374 | 24 September 2010 | Summary of Meeting (Teleconference) with Exelon to Discuss Request for Additional Information Regarding Residual Heat Removal Service Water License Amendment Request | |
RA-10-074, Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope | 24 September 2010 | Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML102581132 | 22 September 2010 | Acknowledgement of Cyber Security Plan Supplement Based NEI 08-09, Revision 6 | Cyber Security |
ML102150188 | 21 September 2010 | Request for Additional Information Regarding Proposed Technical Specification Allowed Outage Time Extensions to Support Residual Heat Removal Service Water (RHRSW) Maintenance | Probabilistic Risk Assessment Multiple Spurious Operation Large early release frequency |
ML102570677 | 21 September 2010 | Request for Additional Information Regarding Relief Request I3R-13, Pressure Testing of Primary Containment Instrument Gas Piping | VT-2 |
ML102630196 | 20 September 2010 | Letter to L. Cuthbert, Sept 20, 2010, Re Underground Piping at Limerick Generating Station | Aging Management Annual Radioactive Effluent Release Report |
ML102800500 | 17 September 2010 | Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 15 and UFSAR Reference Drawings | |
ML102560488 | 14 September 2010 | Electronic Transmission, Draft Request for Additional Information Regarding Relief Request l3R-13, Pressure Testing of Primary Containment Instrument Gas Piping | VT-2 |
ML102570805 | 13 September 2010 | Requalification Program Inspection - Limerick Generating Station, Units 1 and 2 | |
ML102390467 | 9 September 2010 | Proposed Alternative Request RR-l3R-14, Nozzle-to-Vessel Weld and Inner Radii Examinations | Incorporated by reference |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
IR 05000277/2010301 | 3 September 2010 | Er 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301; July 21-29, 2010; Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report | |
ML102460251 | 3 September 2010 | Er 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301; July 21-29, 2010; Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report | |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102920654 | 1 September 2010 | NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder 2) | Safe Shutdown Shutdown Margin Continuous fire watch Hourly Fire Watch |
ML102440555 | 1 September 2010 | Mid-Cycle Assessment Letter 2010 - Limerick Generating Station Units 1 and 2 | |
ML102440264 | 31 August 2010 | 0000-0114-0580-RO-NP, Rev. 0, Limerick Generating Station, Units 1 & 2, Upper Shelf Energy Evaluation for LPCI Nozzle Forging Material | Finite Element Analysis |
ML102430466 | 31 August 2010 | License Amendment Request, Proposed Administrative Changes to Technical Specifications | Shutdown Margin |
TAC:ME4617 | 31 August 2010 | ||
RS-10-144, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | 30 August 2010 | Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | |
ML102520084 | 23 August 2010 | and Peach Bottom Lsro - Final Qa/Related Forms (Folder 1) | |
ML102920658 | 20 August 2010 | Draft Operating Exam (Sections a, B, and C) (Folder 2) | Safe Shutdown Stroke time Squib Job Performance Measure Operability Determination Fire Watch Siren |
ML102320060 | 20 August 2010 | Unit 2, Registration of Use of Casks to Store Spent Fuel | |
ML102920664 | 20 August 2010 | Draft Written Exam (Folder 2) | |
ML102230109 | 19 August 2010 | Notice of Meeting with Exelon Generation Company, LLC to Discuss Limerick, Units 1 & 2, Request for Additional Information Residual Heat Removal Service Water System Increased Allowed Outage Time Technical Specification Amendment | |
ML102300709 | 18 August 2010 | No Significant Hazards Consideration Determination for the Exelon Cyber Security License Amendment Request Supplement Dated July 23, 2010 | Cyber Security Fuel cladding |
ML102280292 | 16 August 2010 | Request for Registration of Use of Casks to Store Spent Fuel | |
RS-10-132, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | 12 August 2010 | Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | Safe Shutdown |
RS-10-133, Limerick, Units 1 and 2 - Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | 12 August 2010 | Limerick, Units 1 and 2 - Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | |
RS-10-126, Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | 10 August 2010 | Additional Information and Supplement Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | Surveillance Frequency Control Program |
IR 05000352/2010003 | 9 August 2010 | IR 05000352-10-003, 05000353-10-003, on 04/01/10 - 06/30/10; Limerick Generating Station, Units 1 and 2, Routine Integrated Report | High Radiation Area Non-Destructive Examination Fire Barrier Water Inventory Control Temporary Modification Locked High Radiation Area Annual Radioactive Effluent Release Report Process Control Program Operability Determination Dissimilar Metal Weld Power Uprate Measurement Uncertainty Recapture |
ML102150337 | 4 August 2010 | Electronic Transmission, Draft Request for Additional Information Regarding Proposed Technical Specification Allowed Outage Time Extensions to Support Residual Heat Removal Service Water (RHRSW) Maintenance | Probabilistic Risk Assessment Multiple Spurious Operation Large early release frequency |
ML102150282 | 3 August 2010 | Acceptance Review of Limerick LAR Regarding HPCI Dt Isolation Setpoint Change - TACs ME4171/ME4172 | |
ML102140080 | 28 July 2010 | Company, LLC (Egc), Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-10-129, Schedule for Responding to Request for Additional Information | 28 July 2010 | Schedule for Responding to Request for Additional Information | |
RS-10-127, Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | 28 July 2010 | Additional Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate | Probabilistic Risk Assessment |
ML102090133 | 27 July 2010 | Response to Request for Additional Information - Submittal of Relief Request I3R-14 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations | |
ML102070025 | 27 July 2010 | Summary of Category 1 Meeting with Exelon to Discuss Re-Submittal of Its Cyber Security Plan | Cyber Security |
ML102090135 | 27 July 2010 | Response to Request for Additional Information - Relief Request I3R-13 Associated with Pressure Testing of the Primary Containment Instrument Gas (PCIG) Piping | |
IR 05000352/2010404 | 26 July 2010 | IR 05000352-10-404, IR 05000353-10-404, on 07/02/10, Limerick Generating Station, Sanatoga, PA, Transmittal Letter (Public) | Affidavit |