Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000305/2010502 | 30 September 2010 | IR 05000305-10-502; Dominion Energy Kewaunee, Inc; 7/19/2010 to 9/7/2010; Kewaunee Power Station, Emergency Action Level and Emergency Plan Changes Inspection Report | Significance Determination Process |
ML102560185 | 28 September 2010 | ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 | |
ML102700162 | 23 September 2010 | Response to Request for Additional Information for the Review of the License Renewal Application | Aging Management |
ML102670754 | 23 September 2010 | ME2139 - Kewaunee - ITS Conversion - State Consultation e-mail | |
ML102670656 | 23 September 2010 | Ltr. 09/23/2010 Kewaunee Re Requalification Program Inspection | |
ML102670641 | 23 September 2010 | Notification Letter Designating Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML102660352 | 22 September 2010 | DOM-NAF-2-P/NP-A, Reactor Core Thermal-Hydraulics Using the Vipre-D Computer Code | |
ML102440201 | 16 September 2010 | 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A | Aging Management |
ML102390198 | 16 September 2010 | 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application | Aging Management |
ML102640203 | 14 September 2010 | Request for Withdrawal of License Amendment 244: Proposed Revision to Radiological Accident Analyses and Control Room Envelope Habitability Technical Specifications | |
IR 05000305/2010403 | 10 September 2010 | IR 05000305-10-403(DRS); 08/16/2010 - 08/20/2010; Kewaunee Power Station; Routine Security Baseline Inspection - Cover Letter | |
ML102500357 | 10 September 2010 | Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application | Aging Management |
ML102580695 | 8 September 2010 | Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 | |
ML102580704 | 8 September 2010 | Attachment 1, Volume 08, Improved Technical Specifications Conversion, (Section 3.3), Instrumentation, Rev. 2, Summary of Changes | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual Post Accident Monitoring Probabilistic Risk Assessment Incorporated by reference Earthquake Recently irradiated fuel |
ML102580705 | 8 September 2010 | Attachment 1, License Amendment Request 249: Conversion Improved Technical Specifications, Supplement to Volumes 8 and 16 | |
ML102580707 | 8 September 2010 | Attachment 2, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 | |
ML102580708 | 8 September 2010 | Enclosure, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16, Associated NRC Staff Requests for Additional Information and Kewaunee'S Responses | |
ML102580709 | 8 September 2010 | Enclosure, Q&A to Attachment 1, Volume 8 (Section 3.3) Rev 2, ITA NRC Questions | |
ML102580710 | 8 September 2010 | Enclosure, Q&A to Attachment 1, Volume 16 (Chapter 5.0) Rev 2, ITS NRC Questions | |
ML102580706 | 8 September 2010 | Attachment 1, Volume 16, Improved Technical Specifications Conversion (Chapter 5.0), Administrative Controls, Rev. 2, Summary of Changes | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Fire Protection Program Stretch Power Uprate |
ML102730398 | 7 September 2010 | Calculation C11116, Revision 0, Kewaunee Unit 1 Steam Generator Narrow Range Level Protection Channel Statistical Allowance (Csa) Calculation. | |
ML102571446 | 7 September 2010 | Holistic Overview of GSI-191 Resolution for Kewaunee Power Station | Mission time Hydrostatic Coatings Design basis earthquake Earthquake |
ML102520078 | 7 September 2010 | Inservice Inspection Program Fourth Ten-Year Interval 10 CFR 50.55a Request No. RR-2-2 | |
ML102571447 | 7 September 2010 | Kewaunee Power Station, Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 | |
ML102730381 | 7 September 2010 | License Amendment Request 249: Kewaunee. Power Station Conversion to Improved Technical Specifications (TAC No. ME2139)- Submittal of Information Requested by NRC Staff | |
ML102440058 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station | |
ML102390419 | 31 August 2010 | DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code. | B.5.b Mitigating Strategies Exemption Request Fuel cladding |
ML102440409 | 31 August 2010 | Ltr. 08/31/2010 Kewaunee Re Confirmation of Initial License Examination | |
ML102450072 | 31 August 2010 | Associated Isfsis, Submittal of Security Plan, Training & Qualification Plan, Safeguards Contingency Plan & Isfs Security Program, Revision 9 | |
ML102430118 | 30 August 2010 | License Renewal - Comments on SER with Open Items | Fire Protection Program |
TAC:ME3460 | 27 August 2010 | ||
ML102440564 | 27 August 2010 | ME3460 Request for Additional Information to Support Safety Evaluation for Kewaunee ITS Conversion and TSTF-493 Submittal | |
ML102150464 | 24 August 2010 | Final Supplement 40 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Kewaunee Power Station | License Renewal |
ML101970193 | 22 August 2010 | Approval of Revision to Previously Approved IST Relief Request VRR-5 | Stroke time |
Press Release-10-143, NRC Issues Final Environmental Impact Statement Impact Statement for Kewaunee Nuclear Plant License Renewal Application | 20 August 2010 | Press Release-10-143: NRC Issues Final Environmental Impact Statement Impact Statement for Kewaunee Nuclear Plant License Renewal Application | |
ML102390421 | 20 August 2010 | Units 1 & 2, Millstone, Units 2 & 3 & Kewaunee, DOM-NAF-2-P/NP, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using VIPRE-D Computer Code. | |
ML102150106 | 19 August 2010 | Notice of Availability of the Final Plant-Specific Supplement 40 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Kewaunee Power Station | Boric Acid High winds Offsite Dose Calculation Manual Tornado Missile Internal Flooding Probabilistic Risk Assessment Zebra Mussel Tornado-Generated Missile Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Large early release frequency License Renewal Earthquake Fuel cladding Environmental Justice Uranium Hexafluoride Power Uprate |
ML102150330 | 19 August 2010 | FRN: Notice of Availability of the Final Plant-Specific Supplement 40 to the Generic Environmental Impact Statement for the License Renewal of Nuclear Plants Regarding Kewaunee Power Station | License Renewal |
ML102371205 | 18 August 2010 | Enclosure (2 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) | Reactor Vessel Water Level Incorporated by reference |
ML102371197 | 18 August 2010 | Attachment 4, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Commitment List | |
ML102371210 | 18 August 2010 | Enclosure (3 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) | Safe Shutdown Offsite Dose Calculation Manual Incorporated by reference |
ML102371257 | 18 August 2010 | Enclosure (4 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment |
ML102371260 | 18 August 2010 | Enclosure (5 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) | |
ML102371266 | 18 August 2010 | Enclosure (6 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) | |
ML102371269 | 18 August 2010 | Enclosure (7 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) | Offsite Dose Calculation Manual Power change GOTHIC |
ML102371282 | 18 August 2010 | Enclosure (8 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) | Mission time Internal Flooding Probabilistic Risk Assessment Seismically rugged |
ML102371283 | 18 August 2010 | Enclosure (1 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) | Safe Shutdown Anticipated operational occurrence Offsite Circuit |
ML102371290 | 18 August 2010 | Enclosure (2 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) | Offsite Circuit |
ML102371292 | 18 August 2010 | Enclosure (3 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) | Probabilistic Risk Assessment Battery sizing |
ML102371294 | 18 August 2010 | Enclosure (4 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) | Safe Shutdown Anticipated operational occurrence Offsite Circuit |