Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
JAFP-10-0132, Notification Letter Designating Jaf Balance of Plant Systems within the Cyber Security Rule Scope27 September 2010Notification Letter Designating Jaf Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
ML10246040127 September 2010ME3786, Letter - Issuance of Amendment to Renewed FOL SLMCPRReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Fuel cladding
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10246033323 September 2010ME3786, Letter Proprietary Information Determination for Withholding from Public Disclosure - RAI Responses Dated September 2, 2010
IR 05000333/201020113 September 2010Inspection 05000333-10-201, on 08/12/2010, James A. FitzPatrick Nuclear Power Plant - Target Set (Letter)Affidavit
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
JAFP-10-0122, Response to Follow-up Request for Additional Information2 September 2010Response to Follow-up Request for Additional InformationMinimum Critical Power Ratio
ML1024600982 September 2010Enclosure 4, Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James a FitzPatrick Cycle 20 SLMCPR Submittal, Affidavit
ML1024601002 September 2010Enclosure 2, RA-ENO-EP1-10-135, Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James a FitzPatrick Cycle 20 SLMCPR SubmittalMinimum Critical Power Ratio
ML1024605372 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024402771 September 2010Mid-Cycle Performance Review and Inspection Plan 2010 - James A. Fitzpatrick Nuclear Power Plant
IR 05000333/201040331 August 2010IR 05000333-10-403, on 05/12/2010 - 07/23/2010; James A. FitzPatrick Nuclear Power Plant; Inspection Procedure 93812, Special Inspection; Access Control, Without OUO, Dated August 31, 2010Significance Determination Process
Affidavit
IR 05000333/201040231 August 2010IR 05000333-10-402; 07/19/2010 - 07/23/2010; James A. FitzPatrick Nuclear Power Plant; Access Control, Equipment Performance, Testing, and Maintenance, and Protection of Safeguards Information. (Letter Only)Significance Determination Process
Affidavit
JAFP-10-0117, Revised NRC Form 536, Operator Licensing Examination Data23 August 2010Revised NRC Form 536, Operator Licensing Examination DataGeneric Fundamentals Examination
ML10235008523 August 2010ME3787, Draft RAIs from NSIR Proposed Changes to EAL Scheme for NRC Review and ApprovalOperating Basis Earthquake
Exemption Request
ML10231000319 August 2010ME3786, Follow-Up RAIs Basedon Review of Response Letter 07-28-2010 & Subsequent to NRC Staff Audit on 08-10-2010
IR 05000333/201040417 August 2010IR 05000333-10-404, on 07/22/10, James A. Fitzpatrick Nuclear Power Plant - NRC Spent Fuel Storage Security Inspection ReportAffidavit
IR 05000333/201000613 August 2010IR 05000333-10-006 on 06/07/2010 - 07/01/2010 for James A. FitzPatrick, Component Design Bases InspectionUltimate heat sink
Stroke time
Reserve Station Service Transformer
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Job Performance Measure
Operability Determination
Frazil ice
Battery sizing
Through Wall Leak
Weak link
ML1021800096 August 2010James A. Fitzpatrick Nuclear Power Plant, ME3786, Follow-Up RAI to the RAI Responses Dated July 28 2010
ENOC-10-00027, Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment6 August 2010Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment.Severe Accident Management Guideline
Earthquake
ML1021502135 August 2010ME3786, Letter-Proprietary Information Determination Finding for RAI Responses Dated July 28, 2010
IR 05000333/20100034 August 2010IR 05000333-10-003, on 04/01/2010 - 06/30/2010, for James A. Fitzpatrick Nuclear Power Plant, Fire ProtectionHigh winds
High Radiation Area
Fire Barrier
Significance Determination Process
Job Performance Measure
Process Control Program
Operability Determination
Fire Protection Program
Downpower
Siren
JAFP-10-0105, Transmittal of Completed NRC Form 536, Operator Licensing Examination Data, Per Regulatory Issue Summary 2010-082 August 2010Transmittal of Completed NRC Form 536, Operator Licensing Examination Data, Per Regulatory Issue Summary 2010-08Generic Fundamentals Examination
Backfit
ML1021400902 August 2010ME4267, Acknowledgment of Withdrawal of LAR Dated November 23, 2009, and Acceptance of Revised LAR Dated July 15, 2010 - Cyber Security PlanCyber Security
JAFP-10-0084, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models31 July 201010 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models
ML10214038730 July 2010Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010Safe Shutdown
Boric Acid
Anticipated operational occurrence
Cyber Security
Surveillance Frequency Control Program
Exemption Request
Fuel cladding
Backfit
Press Release-I-10-035, NRC Assigns New Senior Resident Inspector to FitzPatrick Nuclear Power Plant29 July 2010Press Release-I-10-035: NRC Assigns New Senior Resident Inspector to FitzPatrick Nuclear Power PlantNew Resident Inspector
JAFP-10-0096, Response to Request for Additional Information Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio28 July 2010Response to Request for Additional Information Proposed Change to Technical Specification Concerning the Safety Limit Minimum Critical Power RatioShutdown Margin
Minimum Critical Power Ratio
JAFP-10-0104, Withdrawal of Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter28 July 2010Withdrawal of Application for Amendment to Modify the Technical Specifications Requirements for Testing of Low Pressure Coolant Injection Inverter
ML10175032521 July 2010Issuance of Amendment Testing of Safety/Relief ValvesForeign Material Exclusion
Grace period
ML10188022921 July 2010Issuance of License Amendment 298 Regarding Modification of the Tech Specs Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure-HighReactor Vessel Water Level
Anticipated operational occurrence
Past operability
CAC:MF636715 July 2010
JAFP-10-0075, License Amendment Withdrawal and Request - Cyber Security Plan15 July 2010License Amendment Withdrawal and Request - Cyber Security PlanCyber Security
Incorporated by reference
JAFP-10-0088, Submittal of Corrections to the 2004, 2005, 2006, 2007, and 2008 Annual Radioactive Effluent Release Reports15 July 2010Submittal of Corrections to the 2004, 2005, 2006, 2007, and 2008 Annual Radioactive Effluent Release ReportsAnnual Radioactive Effluent Release Report
TAC:ME521115 July 2010
TAC:ME41249 July 2010
ML1019300089 July 2010ME4124, Acceptance Review-Draft Requests for Information Required
ML1018204501 July 2010ME3786, Amendment Request - Revised RAIsMinimum Critical Power Ratio