 Issue dateTitleTopic
NG-09-0717, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature30 September 200910 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature
NG-09-0709, First Annual Amendment to the Duane Arnold Energy Center License Renewal Application30 September 2009First Annual Amendment to the Duane Arnold Energy Center License Renewal ApplicationMission time
ML09247044928 September 2009License Renewal Application Review
ML09258040924 September 2009Request for Additional Information Regarding Use of Boral Neutron Absorbing Material in Spent Fuel Pool Racks and the Protective Coating Monitoring and Maintenance ProgramCoatings
Aging Management
ML09258054724 September 2009Request for Additional Information, License Renewal Application - Time-Limited Aging Analysis Section 4.2, Aging Management ProgramsWeld Overlay
Aging Management
Stress corrosion cracking
License Renewal
EVT-1
NG-09-0716, Clarification of Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives23 September 2009Clarification of Response to Request for Additional Information Regarding Severe Accident Mitigation AlternativesSafe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Fire Watch
ML10053961421 September 2009DAEC 2009 NRC ES-301-5 Transient and Event Checklist Administered Exam
ML10022191121 September 20092009 Duane Arnold Energy Center Initial Examination Proposed Exam Files
NG-09-0526, 2009 Duane Arnold Energy Center Initial Examination Proposed Exam Files21 September 20092009 Duane Arnold Energy Center Initial Examination Proposed Exam Files
ML10022194521 September 20092009 Duane Arnold Energy Center Initial Examination Administrative Files
ML10035099321 September 2009DAEC 2009 Initial Exam Proposed Administrative JPMsUltimate heat sink
Job Performance Measure
Power change
ML10035104521 September 2009DAEC 2009 Initial Exam Proposed In-Plant JPMsJob Performance Measure
ML10035109221 September 2009DAEC 2009 Initial Exam Proposed Simulator JPMsLoop seal
Time to boil
Squib
Job Performance Measure
ML10035112421 September 2009DAEC 2009 Initial Exam Proposed Simulator ScenariosHalf scram
Overtravel
Power change
Downpower
ML10035115721 September 2009DAEC 2009 Initial Exam Proposed Written-ROSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Half scram
Post Accident Monitoring
Squib
Design basis earthquake
Scram Discharge Volume
Earthquake
Fuel cladding
ML10035117221 September 2009DAEC 2009 Initial Exam Proposed Written-SROSafe Shutdown
Unanalyzed Condition
Time of Discovery
Fitness for Duty
High winds
Shutdown Margin
Half scram
Stroke time
Post Accident Monitoring
Contraband
Operating Basis Earthquake
Overtravel
Earthquake
Pressure Boundary Leakage
Stolen
Fatality
NG-09-0460, DAEC 2009 Revised Written Exam Outline (Es 401-1,3,4)21 September 2009DAEC 2009 Revised Written Exam Outline (Es 401-1,3,4)
ML10035119821 September 2009QF-1030-11 Rev. 7, DAEC 2009 Initial Exam Administered Administrative Jpms,Perform Control Room Weekly Panel Checks.Ultimate heat sink
Post Accident Monitoring
Squib
Job Performance Measure
Scram Discharge Volume
MELLLA
Power change
ML10035120121 September 2009QF-1030-11 Rev. 7, DAEC 2009 Initial Exam Administered In-Plant Jpms, Shift 125 Vdc Battery Chargers.Job Performance Measure
ML10035120321 September 2009DAEC 2009 Initial Exam Administered Simulator Jpms, Perform Required Actions for Startup of the MG Set and Recirculating Pump.Loop seal
Time to boil
Squib
Job Performance Measure
ML10035120721 September 2009DAEC 2009 Initial Exam Administered Simulator ScenariosHalf scram
Overtravel
Downpower
ML10053960721 September 2009DAEC 2009 Examination Outline Review Comments
ML10053960821 September 2009DAEC 2009 Examination OP-Test Review Comments
ML10053961221 September 2009DAEC 2009 NRC ES-301-6 Op Test Competency Checklist Rev 7-9
ML10053961321 September 2009DAEC 2009 NRC ES-301-5 Transient and Event Checklist Proposed Exam
ML09190038118 September 2009Issuance of Amendment Pertaining to Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26.
ML09257038417 September 2009RAI for the Review of the Duane Arnold Energy Center License Renewal Application - Section 2.4
ML09261072715 September 2009Letter Operator Licensing Examination Approval
ML09231035814 September 2009RAI for the Review of the Duane Arnold Energy Center License Renewal ApplicationFire Barrier
Hydrostatic
Coatings
Nondestructive Examination
Aging Management
Fire Protection Program
L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan11 September 2009Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan
ML0924702228 September 2009Notice of Closed Meeting with Duane Arnold to to Discuss Nextera'S Assessment of the Results of the Duane Arnold Baseline Inspection Conducted NRC
NG-09-0645, Response to Request for Additional Information Regarding Section 2.5 of the License Renewal Application3 September 2009Response to Request for Additional Information Regarding Section 2.5 of the License Renewal ApplicationAging Management
NG-09-0646, Response to Request for Additional Information Regarding Section 2.3.3.11 of the Duane Arnold Energy Center License Renewal Application3 September 2009Response to Request for Additional Information Regarding Section 2.3.3.11 of the Duane Arnold Energy Center License Renewal ApplicationFire Barrier
Aging Management
NG-09-0643, Response to Request for Additional Information Regarding Sections 2.2 and 2.3 of the Duane Arnold Energy Center License Renewal Application3 September 2009Response to Request for Additional Information Regarding Sections 2.2 and 2.3 of the Duane Arnold Energy Center License Renewal ApplicationAging Management
NG-09-0644, Response to Request for Additional Information Regarding Section 2.3 of the License Renewal Application3 September 2009Response to Request for Additional Information Regarding Section 2.3 of the License Renewal ApplicationAging Management
ML0924402491 September 2009Mid-Cycle Performance Review and Inspection PlanCondition Adverse to Quality
ML09231003031 August 2009and Duane Arnold Energy Center - Request for the Use of Delta Protection Mururoa V4F1 R Supplied Air Suits (TAC Nos. ME1156 Through ME1163)Mururoa
ML09232011628 August 2009Request for Additional Information Regarding Your Nine Month Response to NRC Generic Letter 2009-01. Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
NG-09-0507, Submittal of Tests, Experiments, Fire Plan and Commitment Changes for 07/14/07 Through 06/01/0927 August 2009Submittal of Tests, Experiments, Fire Plan and Commitment Changes for 07/14/07 Through 06/01/09
ML09239064526 August 2009ME1821 - Acceptance of Application for Relief Request for 1st Period Limited Weld Examinations (Your Letter NG-09-0539)
ML09229012324 August 2009Clarification of Response to the Request for Additional Information Regarding Severe Accident Mitigation Alternatives Analysis for License Renewal of the Duane Arnold Energy CenterProbabilistic Risk Assessment
ML09245027621 August 2009Duane Arnold - Response to Request for Additional Information Regarding the Environmental Review of the License Renewal Application
NG-09-0641, Enclosure 1 to NG-09-0641 - Index of Documents Provided in Response to NRC Request, Part 2 of 221 August 2009Enclosure 1 to NG-09-0641 - Index of Documents Provided in Response to NRC Request, Part 2 of 2Grab sample
Hydrostatic
Coatings
ML09245029421 August 2009Enclosure 1 to NG-09-0641 - Index of Documents Provided in Response to NRC Request, Part 1 of 2Scaffolding
ML09217035618 August 2009Project Manager Change for the License Renewal Project (Safety) for Duane Arnold Nuclear Power Station
ML09197017214 August 2009Request for Additional Information for the Review of the Duane Arnold Energy Center License Renewal Application - TLAA 4.2, B.3.12, B.3.13, B.3.14, B.3.35Weld Overlay
Aging Management
Stress corrosion cracking
License Renewal
EVT-1
ML09230037913 August 2009Draft RAI, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML09226031113 August 2009MD7824 - GL 2008-01 (Managing Gas Accumulation) - Request for Additional Information
ML09224060211 August 2009Ltr. 08/11/09 Duane Arnold Request for Information Re NRC License Renewal Inspection
ML0920804147 August 2009Request for Additional Information for the Review of the Duane Arnold Energy Center License Renewal Application - Section 2.2 and 2.3Aging Management