ML092610727
| ML092610727 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 09/15/2009 |
| From: | Hironori Peterson Operations Branch III |
| To: | Costanzo C Florida Power & Light Co |
| References | |
| Download: ML092610727 (3) | |
Text
September 15, 2009 Mr. Christopher R. Costanzo Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Costanzo:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Duane Arnold Energy Center.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Ron Minear, Acting Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ one day during the week of September 28, 2009. The NRC staff will administer the operating tests during the week of September 21, 2009. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.
Please contact your Chief Examiner, Mr. David W. Reeser, at 630-829-9859, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
C. Costanzo In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 cc:
M. Nazar, Senior Vice President and Chief Nuclear Officer M. Ross, Vice President and Associate General Counsel A. Khanpour, Vice President, Engineering Support D. Curtland, Plant General Manager S. Catron, Manager, Licensing M. Mashhadi, Senior Attorney Chairman, Linn County, Board of Supervisors M. Rasmusson, State Liaison Officer R. Anderson, Vice President, Nuclear Plant Support R. Kundalkar, Vice President, Fleet Organizational Support M. Cornell, Director, Licensing & Performance Improvement R. Minear, Acting Training Manager
C. Costanzo In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 cc:
M. Nazar, Senior Vice President and Chief Nuclear Officer M. Ross, Vice President and Associate General Counsel A. Khanpour, Vice President, Engineering Support D. Curtland, Plant General Manager S. Catron, Manager, Licensing M. Mashhadi, Senior Attorney Chairman, Linn County, Board of Supervisors M. Rasmusson, State Liaison Officer R. Anderson, Vice President, Nuclear Plant Support R. Kundalkar, Vice President, Fleet Organizational Support M. Cornell, Director, Licensing & Performance Improvement R. Minear, Acting Training Manager DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak Nancy Salgado DOCUMENT NAME: G:\\DRS\\Work in Progress\\DUA 091509 DRS OL Exam Approval.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME JKweiser:co DReeser HPeterson DATE 09/15/09 09/15/09 09/15/09 OFFICIAL RECORD COPY