Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22362A038 | 28 December 2022 | R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) | |
ML22354A262 | 20 December 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI | |
ML22348A206 | 14 December 2022 | Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification | |
RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator | 7 December 2022 | Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator | |
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML22293B805 | 30 November 2022 | Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
IR 05000244/2022420 | 22 November 2022 | Security Baseline Inspection Report 05000244-2022420 Cover Letter | Affidavit |
ML22325A005 | 18 November 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 | |
ML22270A306 | 17 November 2022 | R. E. Ginna Nuclear Power Plant - Request for Withholding Information from Public Disclosure | |
ML22320A559 | 16 November 2022 | 2022 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML22264A199 | 14 November 2022 | Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and | Probabilistic Risk Assessment |
IR 05000244/2022003 | 3 November 2022 | LLC - Integrated Inspection Report 05000244/2022003 | Boric Acid High Radiation Area Temporary Modification Functionality Assessment Locked High Radiation Area Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Severe Accident Management Guideline Exemption Request Fire Protection Program |
ML22298A010 | 25 October 2022 | License Amendment Request to Adopt TSTF-273-A, (Safety Function Determination Program) SFDP Clarifications, Revision 2, as Amended by WOG-ED-23, Dated July 17, 1999 | Offsite Circuit |
ML22290A095 | 19 October 2022 | Constellation Energy Generation, LLC - Fleet Project Manager Reassignment | |
ML22279A015 | 6 October 2022 | R. E. Ginna Nuclear Power Plant - NRC Office of Investigations Case No. 1-2021-016 | |
ML22269A485 | 29 September 2022 | Operator Licensing Examination Approval | |
ML23247A009 | 28 September 2022 | Final QA Related Forms | Job Performance Measure |
ML22339A003 | 28 September 2022 | R. E. Ginna Nuclear Power Plant - Ginna: Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report | |
ML22269A452 | 22 September 2022 | R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report (COLR) | |
IR 05000244/2022501 | 21 September 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000244/2022501 | |
ML22264A084 | 20 September 2022 | R. E. Ginna Nuclear Power Plant - Clarification Letter to the Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) | |
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. | 20 September 2022 | Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. | Non-Destructive Examination Scaffolding |
NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates | 15 September 2022 | Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates | Pandemic Coronavirus |
IR 05000244/2022010 | 13 September 2022 | Biennial Problem Identification and Resolution Inspection Report 05000244/2022010 | Operability Determination |
ML22255A013 | 9 September 2022 | NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 | |
IR 05000244/2022005 | 31 August 2022 | Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005) | Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML22269A410 | 22 August 2022 | Attachment 11 - R.E. Ginna Nuclear Power Plant-Development of Evacuation Time Estimates | Pandemic Coronavirus |
ML22234A169 | 22 August 2022 | R. E. Ginna Nuclear Power Plant, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) | Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal Coatings Surveillance Frequency Control Program Fuel cladding |
PMNS20220805, Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds | 22 August 2022 | Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds | |
RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans | 18 August 2022 | Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans | |
ML22229A092 | 18 August 2022 | Requalification Program Inspection | |
RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. | 10 August 2022 | R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. | Safe Shutdown Non-Destructive Examination Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Cyber Security Pressure and Temperature Limits Report Surveillance Frequency Control Program Fire Protection Program |
ML22222A105 | 10 August 2022 | Notice of Withdrawal of Margrethe Kearney | |
ML22215A003 | 3 August 2022 | R. E. Ginna Nuclear Power Station - Nuclear Radiological Emergency Plan Document Revision. Includes EP-AA-1012, Addendum 3, Appendix 1, Revision 2, R.E. Ginna EAL Wallboard | High winds Earthquake Pressure Boundary Leakage |
IR 05000244/2022002 | 3 August 2022 | LLC - Integrated Inspection Report 05000244/2022002 | Boric Acid Internal Flooding Functionality Assessment FLEX Process Control Program Operability Determination Offsite Circuit Fire Protection Program |
IR 05000244/2022402 | 3 August 2022 | Security Baseline Inspection Report 05000244/2022402 | |
ML22214A004 | 2 August 2022 | Audit Plan to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159) | |
ML22215A213 | 28 July 2022 | News Release-I-22-009: NRC Names New Resident Inspector at Ginna Nuclear Power Plant | New Resident Inspector |
ML22207A021 | 22 July 2022 | NRC-2022-000105 - Resp 1 - Final | |
ML22207A022 | 22 July 2022 | NRC-2022-000105 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | |
ML22202A009 | 21 July 2022 | R. E. Ginna Nuclear Power Plant - Submittal of Integrated Initial License Training Examination Materials | Job Performance Measure |
ML22200A078 | 19 July 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
ML22187A146 | 6 July 2022 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary | |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
ML22094A107 | 22 June 2022 | R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 151 Adopt 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Tornado Missile Internal Flooding Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Fukushima Dai-Ichi Large early release frequency Frazil ice Preemption Authority Earthquake Fire Protection Program Very Early Warning Fire Detection |
ML22119A094 | 21 June 2022 | R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 150 Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Safe Shutdown High winds High Radiation Area Tornado Missile Probabilistic Risk Assessment Cyber Security FLEX Surveillance Frequency Control Program Large early release frequency Flooding Focused Evaluation Preemption Authority Maintenance Rule Program Offsite Circuit Fire Protection Program |
RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . | 17 June 2022 | Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . | Hydrostatic Incorporated by reference |
ML22165A235 | 14 June 2022 | R. E. Ginna Nuclear Power Plant, LLC - Request for Information for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000244/2022012 | Ultimate heat sink Commercial Grade Dedication Internal Flooding Probabilistic Risk Assessment Temporary Modification Aging Management |
ML22160A416 | 9 June 2022 | R. E. Ginna Nuclear Power Plant, Core Operating Limits Report Cycle 43, Revision 1 | Shutdown Margin |
ML22160A411 | 9 June 2022 | Supplemental Information for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 |