Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
James D. Blankenship Site Vice President R.E. G1nna Nuclear Power Plant 1503 Lake Rd 315 791 5205 Office Constellation ~ James.blankensh1pconstellat1on.com www.constellation.com July 21 , 2022 David Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road Suite 102 King of Prussia, PA 19406-1415 RE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244
Subject:
Submittal of Integrated Initial License Training Examination Materials
Reference:
(1) Letter from Donald E. Jackson (NRC) to David Rhoades (Exelon Nuclear), RE.
Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations, dated January 21, 2022
Dear Mr. Lew:
Below is a list of the examination materials, which RE. Ginna is submitting in support of the initial license examination scheduled for October 17, 2022, through October 25, 2022, at R E. Ginna Station wh ich have been sent to the Chief Examiner, Joseph DeMarshall.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors" , Revision 12. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors", Revision 12.
Some modifications or adjustments to the examination material may be required due to procedural changes.
In accordance with NUREG-1021 , Revision 12, Section ES-1.3, "Examination Security", as amplified by OLMC-520, Section C.5, "Delayed Release of Examination Material", please ensure that these materials are withheld from public disclosure for two (2) years after the examinations are complete.
SRRS: 30 .100; Retain th is document until all regulatory actions associated with the exam are complete, at wh ich time it may be discarded.
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
Should you have any questions concerning this letter, please contact the Manager, Site Regulatory Assurance, Christopher Bradshaw, at 315-791-3246. For questions concerning examination materials, please contact the Regulatory Exam Author, Donald Dean, at 315-791-5315.
Respectfully, James D. Blankenship Site Vice President SRRS : 30.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.
The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.
Enclosures:
Hard copy Enclosures via FedEx to J. DeMarshall, Chief Examiner, NRC Region I Form 3.2-1, Administrative Topics Outline for RO Form 3.2-1, Administrative Topics Outline for SRO Form 3.2-2, Control Room/In-Plant Systems Outline Form 4.1-PWR, Pressurized-Water Reactor Examination Outline (RO and SRO)
(Provided by NRC)
Form 4.1-COMMON, Generic Knowledge and Abilities Outline (Tier 3) and Theory (Tier
- 4) (Provided by NRC)
Form 4.2-1, RO/SRO Composite Examination, with references attached Form 3.2-3, Control Room / In-Plant Job Performance Measures, with references attached Form 3.2-3, Administrative Topic Job Performance Measures, with references attached Form 3.3-1, Scenario Outline, Scenario #1 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #1 Form 3.3-1, Scenario Outline, Scenario #2 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #2 Form 3.3-1, Scenario Outline, Scenario #3 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #3 Form 3.3-1, Scenario Outline, Scenario #4 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #4 Completed Checklists:
Form 1.3-1, Examination Security Agreements Form 2.3-2, Operating Test Quality Checklist Form 2.3-4, Written Examination Quality Checklist Form 3.4-1, Events and Evolutions Checklist Form 4.1-1, Record of Rejected Knowledge and Abilities (Provided by NRC) cc: Mr. D. Jackson, Chief, NRC Operator Licensing Branch (w/o enclosures)
Mr. J. DeMarshall, Chief Examiner, NRC Region I (w/ Hard copy Enclosures via FedEx)
Mr. V. Sreenivas, Ginna Station Project Manager, NRR (w/o enclosures)
Mr. J. Schussler, NRC Ginna Sr Resident Inspector (E-mail, w/o enclosures)
SRRS: 3D.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.