Issue date | Title | Topic | |
---|---|---|---|
CAC:MF9665 | 31 March 2017 | ||
CAC:MF9567 | 31 March 2017 | ||
LIC-17-0001, License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for Decommissioning | 31 March 2017 | License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for Decommissioning | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Shutdown Margin Loop seal High Radiation Area Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Hydrostatic Nondestructive Examination Cyber Security Emergency Lighting Locked High Radiation Area Missed surveillance Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Local Leak Rate Testing Annual Radiological Environmental Operating Report Large early release frequency Safeguards Contingency Plan License Renewal Power Operated Valves Fuel cladding Pressure Boundary Leakage Minimum staff Offsite Circuit Fire Protection Program Power change Unidentified leakage |
LIC-17-0031, Irradiated Fuel Management Plan | 31 March 2017 | Irradiated Fuel Management Plan | |
ML17090A394 | 31 March 2017 | NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) | Fire Protection Program |
CAC:MF9536 | 30 March 2017 | ||
ML17089A759 | 30 March 2017 | Post-Shutdown Decommissioning Activities Report | Fitness for Duty Ultimate heat sink Grab sample Offsite Dose Calculation Manual License Renewal Fuel cladding Environmental Justice Fire Watch Scaffolding |
ML17089A544 | 30 March 2017 | Response to Request for Additional Information Certified Fuel Handler Training Program | Job Performance Measure Fire Watch |
ML17040A094 | 28 March 2017 | Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures | |
LIC-17-0016, License Amendment Request 17-02; Request Extension for Milestone 8 of Cyber Security Plan Implementation Schedule | 24 March 2017 | License Amendment Request 17-02; Request Extension for Milestone 8 of Cyber Security Plan Implementation Schedule | Cyber Security Fuel cladding |
LIC-17-0021, Transmittal of 2017 Biennial Decommissioning Funding Status Report | 24 March 2017 | Transmittal of 2017 Biennial Decommissioning Funding Status Report | Decommissioning Funding Plan |
ML17082A002 | 22 March 2017 | NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption | Exemption Request |
ML17081A019 | 21 March 2017 | NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption | Exemption Request |
LIC-17-0022, On-Site Property Damage Insurance Certification | 21 March 2017 | On-Site Property Damage Insurance Certification | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17027A124 | 20 March 2017 | Letter to State of Iowa - Termination of ERDS Feed for Fort Calhoun Nuclear Generating | |
ML17027A126 | 20 March 2017 | Letter to State of Nebraska - Termination of ERDS Feed for Fort Calhoun | |
ML17067A386 | 15 March 2017 | Request for Additional Information, Request for Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management | |
ML17038A153 | 14 March 2017 | Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission | |
LIC-17-0029, Confirmatory Action Letter Commitments Follow Up | 10 March 2017 | Confirmatory Action Letter Commitments Follow Up | |
LIC-17-0020, Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment | 3 March 2017 | Response to Request for Additional Information, Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment | Abnormal operational transient Severe Accident Management Guideline Fuel cladding Minimum staff |
ML17039A655 | 3 March 2017 | Request for Withholding Information from Public Disclosure - 12/13/16 Affidavit Executed by G. Elliott, Areva Np; Calculation FC08513; Exemption Request to Reduce Emergency Planning Requirements for Permanently Defueled Condition | Exemption Request |
ML17039A893 | 2 March 2017 | Letter to Those on the Attached List - Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Batch 1) | |
ML21271A174 | 2 March 2017 | License Amendment Request (LAR) 21-01, Chapter 2 20 Storm Water Discharge Authorization Permit Renewal NER910677 Package for FCS cac2 | |
LIC-17-0018, Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 24 February 2017 | Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Ultimate heat sink FLEX Spent Fuel Pool Instrumentation |
ML17052A027 | 15 February 2017 | NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme | |
ML17041A238 | 15 February 2017 | Acceptance Review Letter, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E to Allow Plant to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition | Exemption Request |
LIC-17-0002, Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Update | 14 February 2017 | Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Update | Operating Basis Earthquake Earthquake |
ML17041A443 | 10 February 2017 | Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 1 of 4) | |
LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) | 10 February 2017 | Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) | |
ML17041A444 | 10 February 2017 | Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 2 of 4) | |
LIC-17-0010, ISFSI - Decommissioning External Trust Fund Annual Accounting for 2016 | 8 February 2017 | ISFSI - Decommissioning External Trust Fund Annual Accounting for 2016 | Decommissioning Funding Plan |
LIC-17-0019, Annual Dose Report for 2016 | 7 February 2017 | Annual Dose Report for 2016 | |
CAC:MF9067 | 7 February 2017 | ||
ML17037D162 | 7 February 2017 | Supplemental Information Needed for Acceptance of Requested Licensing Action - Request for Exemptions from 10 CFR 50.47 and 10 CFR 50 Appendix E, Reduce Emergency Planning Requirements for Permanently Defueled Condition (MF9067) | Exemption Request |
ML17033A969 | 2 February 2017 | NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment | Minimum staff |
LIC-17-0002, Fort Calhoun, Unit 1 - Organizational and Management Change | 1 February 2017 | Fort Calhoun, Unit 1 - Organizational and Management Change | |
ML17034A313 | 1 February 2017 | FEMA Letter to Mr. Joseph Anderson, Regarding the License Amendment Request for Proposed Changes to Fort Calhoun Emergency Plan to Address Permanently Defueled Condition | |
ML17033B299 | 1 February 2017 | Organizational and Management Change | |
ML17023A022 | 24 January 2017 | Project Manager Assignment to James S. Kim Effective January 30, 2017 | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML17006A431 | 18 January 2017 | Commencement of Decommissioning Inspection Program Under Inspection Manual Chapter 2561 | Fire Protection Program |
IR 05000285/2016004 | 18 January 2017 | NRC Integrated Inspection Report 05000285/2016004 | Unanalyzed Condition High Radiation Area Tornado Missile Hydrostatic Functionality Assessment Significance Determination Process Large early release frequency Operability Determination Fire Protection Program Downpower Siren |
ML17023A125 | 17 January 2017 | OI 4-2016-023 - Omaha Public Power District Fort Calhoun Station; Closure of Investigation | |
IR 05000285/2016501 | 17 January 2017 | NRC Emergency Preparedness Annual Inspection Report 05000285/2016501 | |
ML17013A548 | 13 January 2017 | Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 | Generic Fundamentals Examination |
LIC-17-0006, EP-FC-1001 Addendum 3 Rev 2 Issued 12/29/2016 | 11 January 2017 | EP-FC-1001 Addendum 3 Rev 2 Issued 12/29/2016 | High winds Reactor Vessel Water Level Ultimate heat sink Operating Basis Earthquake Operator Manual Action Earthquake Fuel cladding Pressure Boundary Leakage |