Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RBG-47672, Submittal of Emergency Implementing Procedure | 30 March 2016 | Submittal of Emergency Implementing Procedure | Fitness for Duty Health Physics Network Severe Accident Management Guideline |
CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | 30 March 2016 | Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | |
05000458/LER-2016-004 | 29 March 2016 | Actuation of the Division 1 Emergency Diesel Generator and Primary Containment Isolation Logic Due to Partial Loss of Offsite Power LER 16-004-00 for River Bend, Unit 1, Regarding Actuation of the Division 1 Emergency Diesel Generator and Primary Containment Isolation Logic Due to Partial Loss of Offsite Power | Scram Discharge Volume |
ML16088A205 | 28 March 2016 | Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML16088A204 | 28 March 2016 | Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) | Decommissioning Funding Plan |
ML16090A058 | 24 March 2016 | Submittal of Regulatory Conference Documents for April 4, 2016. Attachment 3: Engineering Report No. RBS-ME-16-00002, Main Control Room Heat-Up Analysis During Loss of HVAC Conditions for 24 Hours | |
ML16090A057 | 24 March 2016 | Submittal of Regulatory Conference Documents for April 4, 2016. Attachment 2: Engineering Report No. RBS-ME-16-00003, Evaluation of Main Control Room Realistic Heat Load Based on Measured Data | |
ML16090A059 | 24 March 2016 | Submittal of Regulatory Conference Documents for April 4, 2016. Attachment 6: Engineering Report No. RBS-ME-15-00036, Main Control Room (MCR) Operator Habitability Under Beyond Design Basis Loss of HVAC Conditions | Ultimate heat sink FLEX Preliminary White Finding |
RBG-47668, Submittal of Regulatory Conference Documents for April 4, 2016. Attachments 1, 4, 5, 7, 8, 9, a, 10, & 11 Enclosed | 24 March 2016 | Submittal of Regulatory Conference Documents for April 4, 2016. Attachments 1, 4, 5, 7, 8, 9, a, 10, & 11 Enclosed | Safe Shutdown Half scram Mission time Internal Flooding Enforcement Discretion FLEX Significance Determination Process Preliminary White Finding Incremental Core Damage Probability Deficit |
ML16082A031 | 21 March 2016 | NRR E-mail Capture - Request for Additional Information - RBS LAR to Extend Type a and Type C Test Frequencies (NEI 94-01, Rev. 3-A) - TAC No. MF7037 | |
TAC:MF7037 | 21 March 2016 | ||
Press Release-IV-16-005, NRC Schedules Regulatory Conference to Discuss Apparent Violation at River Bend Station | 16 March 2016 | Press Release-IV-16-005: NRC Schedules Regulatory Conference to Discuss Apparent Violation at River Bend Station | |
RBG-47662, Submittal of Annual Emergency Plan Information Brochures - 2016 | 16 March 2016 | Submittal of Annual Emergency Plan Information Brochures - 2016 | |
IR 05000458/2016403 | 15 March 2016 | NRC Security Baseline Inspection Report 05000458/2016403 | Affidavit |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
05000458/LER-2016-001 | 7 March 2016 | Potential Loss of Secondary Containment Safety Function Due to Failure of Auxiliary Building Ventilation System LER 16-001-00 for River Bend, Unit 1, Regarding Potential Loss of Secondary Containment Safety Function Due to Failure of Auxiliary Building Ventilation System | |
ML16071A441 | 7 March 2016 | Entergy Fleet Relief Request No. RR-EN-15-1-Proposed Alternative to Use ASME Code Case N-789-1 - E-mail from G.Davant to R.Guzman - Response to Second RAI (MF6340 - MF6349) | |
05000458/LER-2016-002 | 7 March 2016 | Automatic Reactor Scram and Division 2 Primary Containment Isolation Due to Offsite Grid Electrical Transient LER 16-002-00 for River Bend, Unit 1, Regarding Automatic Reactor Scram and Division 2 Primary Containment Isolation Due to Offsite Grid Electrical Transient | |
Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants | 4 March 2016 | Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants | |
IR 05000458/2015006 | 2 March 2016 | Annual Assessment Letter for River Bend Station (Report 05000458/2015006) | B.5.b Spent Fuel Pool Instrumentation License Renewal |
IR 05000458/2015402 | 2 March 2016 | Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2015402) | |
ML16060A416 | 29 February 2016 | Annual Fatigue Report Form for 2015 | |
ML16060A417 | 29 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ML16060A423 | 29 February 2016 | Single Positive Test Form Collected on 02/03/2015 | |
ML16060A422 | 29 February 2016 | Single Positive Test Form Collected on 01/28/2015 | |
ML16060A426 | 29 February 2016 | Single Positive Test Form Collected on 02/18/2015 | |
ML16060A424 | 29 February 2016 | Single Positive Test Form Collected on 02/10/2015 | |
ML16060A421 | 29 February 2016 | Single Positive Test Form Collected on 01/26/2015 | |
ML16060A429 | 29 February 2016 | Single Positive Test Form Collected on 06/29/2015 | |
ML16060A425 | 29 February 2016 | Single Positive Test Form Collected on 02/10/2015 | |
ML16060A428 | 29 February 2016 | Single Positive Test Form Collected on 05/07/2015 | |
ML16060A427 | 29 February 2016 | Single Positive Test Form Collected on 03/12/2015 | |
ML16056A121 | 26 February 2016 | Project Manager Assignment to Andrea E. George Effective, March 6, 2016 | |
CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) | 25 February 2016 | Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) | |
ML16074A137 | 25 February 2016 | Unit 1, Spent Fuel Storage Radioactive Effluent Release Report for 2015 | Annual Radioactive Effluent Release Report |
RBG-47656, Response to Preliminary White Finding, Per NRC Inspection Report 05000458/2015010 | 25 February 2016 | Response to Preliminary White Finding, Per NRC Inspection Report 05000458/2015010 | Preliminary White Finding |
ML16053A131 | 22 February 2016 | Response to Your Appeal of the Formal Disagreement with Adversary Characteristics, Attributes, or Tactics Employed or Prepared as Part of a U.S. Nuclear Regulatory Commission Force-On-Force Evaluated Exercise - Disputed Item 05000458/201620 | |
ML16049A533 | 19 February 2016 | Response to Formal Disagreement with Adversary Characteristics, Attributes, or Tactics Employed or Prepared as Part of NRC Force-On-Force Evaluated Exercise - Disputed Item 05000458/2016201-01 | |
ML15364A544 | 18 February 2016 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific Licensees | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
IR 05000458/2015010 | 16 February 2016 | NRC Special Inspection Report 05000458/2015010 and Preliminary White Finding | Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program Preliminary White Finding |
RBG-47648, Nineteenth Fuel Cycle Core Operating Limits Report, Revision 2 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 | 11 February 2016 | Nineteenth Fuel Cycle Core Operating Limits Report, Revision 2 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 | |
RBG-47651, Submittal of Emergency Plan and Emergency Implementing Procedures | 10 February 2016 | Submittal of Emergency Plan and Emergency Implementing Procedures | |
IR 05000458/2015004 | 10 February 2016 | NRC Integrated Inspection Report 5000458/2015004 | Fitness for Duty Grab sample Offsite Dose Calculation Manual Stroke time Functionality Assessment Significance Determination Process Job Performance Measure Process Control Program Operability Determination Fire Protection Program |
Press Release-IV-16-002, NRC Begins Special Inspection at River Bend Station | 8 February 2016 | Press Release-IV-16-002: NRC Begins Special Inspection at River Bend Station | Safe Shutdown |
05000458/LER-2015-010 | 8 February 2016 | Potential Loss of Safety Function of High Pressure Core Spray Due to Failure of Main Control Building Ventilation Chiller LER 15-010-00 for River Bend Station, Unit 1, Regarding Potential Loss of Safety Function of High Pressure Core Spray Due to Failure of Main Control Building Ventilation Chiller | |
CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti | 29 January 2016 | Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, | Liquid penetrant |
ML16027A027 | 27 January 2016 | Notification of NRC Initial Operator Licensing Examination 05000458/2016301 | |
ML16049A505 | 27 January 2016 | Emergency Implementing Procedures | Fitness for Duty Health Physics Network High winds FLEX Severe Accident Management Guideline Earthquake |
ML16049A507 | 27 January 2016 | Emergency Plan, Revision 42 | |
05000458/LER-2015-009 | 26 January 2016 | 1 OF 3 LER 15-009-00 for River Bend Station, Unit 1 Regarding Automatic Reactor Scram Due to Partial Loss of Offsite Power Caused by Fault in Local 230K Switchyard |