Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13340A61619 December 2013Correction to Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
ML13354B81419 December 2013NRR E-mail Capture - Acceptance Review River Bend - Revision of Charcoal Testing TSs (MF3014)
ML13351A10217 December 2013Notification of Generic Fundamentals Examinations for 2014Generic Fundamentals Examination
RBG-47417, Supplement to Request for Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements17 December 2013Supplement to Request for Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code RequirementsAging Management
EVT-1
IR 05000458/201340516 December 2013NRC Material Control and Accounting Program Inspection Report 05000458/2013405Affidavit
IR 05000458/201340313 December 2013NRC Security Inspection Report 05000458/2013403Affidavit
RBG-47413, Notification of Deviation from BWRVIP-4211 December 2013Notification of Deviation from BWRVIP-42
ML13337A4813 December 2013NRR E-mail Capture - River Bend Station, Unit 1, Request for Additional Information Regarding Proposed Changes to TS 3.8.4, DC Sources-OperatingBattery sizing
ML13316C06525 November 2013Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Safe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
GOTHIC
ML13322A83325 November 2013Final ASP Analysis - River Bend StationReactor Vessel Water Level
Ultimate heat sink
Significance Determination Process
ML13322A42525 November 2013Transmittal of Final River Bend Station Accident Sequence Precursor AnalysisUltimate heat sink
RBG-47409, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements21 November 2013Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic RequirementsFukushima Dai-Ichi
ML13304A73015 November 2013Reassignment to the DORL Plant Licensing IV-2 and Decommissioning Transition Branch Effective 11/3/2013
ML13319A10914 November 2013NRR E-mail Capture - River Bend Station, Unit 1, Request for Additional Information Regarding Relief Request RBS-ISI-019Aging Management
EVT-1
IR 05000458/201300413 November 2013IR 05000458-13-004; 06/30/2013 - 09/28/2013; River Bend Station, Integrated Resident and Regional ReportTemporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Operability Assessment
ML13311B3817 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (QAPM)
RBG-47404, Unit 1, License Amendment Request 2013-17, Revision of the Ventilation Filter Testing Program and Associated Surveillance Requirements4 November 2013Unit 1, License Amendment Request 2013-17, Revision of the Ventilation Filter Testing Program and Associated Surveillance RequirementsIncorporated by reference
Recently irradiated fuel
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)4 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13304A74930 October 2013NRR E-mail Capture - Acceptance of Riverbend Station Request for Relief RBS-R&R-2013-001 (MF2733)
RBG-47403, Response Supplement Regarding Multi-Source Dose Assessment Commitment Related to Near-Term Task Force Recommendation 9.328 October 2013Response Supplement Regarding Multi-Source Dose Assessment Commitment Related to Near-Term Task Force Recommendation 9.3
RBG-47401, Preliminary Accident Sequence Precursor Analysis Review24 October 2013Preliminary Accident Sequence Precursor Analysis Review
RBG-47402, Eighteenth Fuel Cycle Core Operating Limits Report (Colr), Revision 124 October 2013Eighteenth Fuel Cycle Core Operating Limits Report (Colr), Revision 1
ML13233A18323 October 2013Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power PlantFukushima Dai-Ichi
Minimum staff
RBG-47400, Request for Relief RBS-R&R-2013-001, Request for Relief from ASME Boiler & Pressure Vessel Code17 October 2013Request for Relief RBS-R&R-2013-001, Request for Relief from ASME Boiler & Pressure Vessel CodeStroke time
FLEX
ML13274A0997 October 2013Supplemental Information Needed for Acceptance of Licensing Action, Relief Request RBS-R&R-2013-001, Alternative to ASME Code Section III for Postweld Heat Treatment Exemption, Third 10-Year ISI IntervalIncorporated by reference
ML13281A8022 October 2013Notification of Deviation from BWRVIP-183
ML13266A3692 October 2013J. Anderson Memo Request for Technical Assistance on License Amendment Request for Proposed Revision to Emergency Plan for Lacrosse Reactor
ML13277A35730 September 2013Assistance in Obtaining Information on DamsFukushima Dai-Ichi
TAC:MF304030 September 2013
IR 05000458/201340630 September 2013Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats, Inspection Report Number 05000458/2013406Affidavit
ML13268A36725 September 2013RBS Generic Fundamentals Examination ResultsGeneric Fundamentals Examination
ML13268A42025 September 2013Acceptance Review Email, License Amendment Request, Changes to Technical Requirements Manual and Updated Safety Analysis Report to Add Permanent Exception Allowing Heavy Load Movement Over Fuel Assemblies
ML13261A37924 September 2013Request for Relief RBS-ISI-018 for Reactor Pressure Vessel Support Skirt for the Second 10-Year Inservice Inspection IntervalIncorporated by reference
IR 05000458/201300813 September 2013
RBG-47390, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 1.5 Year12 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 1.5 YearFukushima Dai-Ichi
Earthquake
IR 05000458/20130063 September 2013Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2013006)
IR 05000416/20130063 September 2013Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006)
RBG-47389, Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2013Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)FLEX
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
RBG-47385, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
TAC:MF259926 August 2013
ML13233A23126 August 2013YT020130149 - Redacted Transmittal Letter, Preliminary Accident Sequence Precursor Analysis for Licensee Review for River Bend Station, Unit 1
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13203A12821 August 2013Letter, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of PaExemption Request
NRC-2013-0190, FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa20 August 2013FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of PaExemption Request
ML13203A13020 August 2013FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of PaExemption Request
ML13239A07419 August 2013Request for Relief from ASME Boiler & Pressure Vessel Code Section Iii
RBG-47386, Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat.19 August 2013Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat.Hydrostatic
Coatings
TAC:MF273319 August 2013