Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13340A616 | 19 December 2013 | Correction to Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
ML13354B814 | 19 December 2013 | NRR E-mail Capture - Acceptance Review River Bend - Revision of Charcoal Testing TSs (MF3014) | |
ML13351A102 | 17 December 2013 | Notification of Generic Fundamentals Examinations for 2014 | Generic Fundamentals Examination |
RBG-47417, Supplement to Request for Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements | 17 December 2013 | Supplement to Request for Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements | Aging Management EVT-1 |
IR 05000458/2013405 | 16 December 2013 | NRC Material Control and Accounting Program Inspection Report 05000458/2013405 | Affidavit |
IR 05000458/2013403 | 13 December 2013 | NRC Security Inspection Report 05000458/2013403 | Affidavit |
RBG-47413, Notification of Deviation from BWRVIP-42 | 11 December 2013 | Notification of Deviation from BWRVIP-42 | |
ML13337A481 | 3 December 2013 | NRR E-mail Capture - River Bend Station, Unit 1, Request for Additional Information Regarding Proposed Changes to TS 3.8.4, DC Sources-Operating | Battery sizing |
ML13316C065 | 25 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | High Radiation Area Safe Shutdown Earthquake Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Fire Protection Program GOTHIC |
ML13322A833 | 25 November 2013 | Final ASP Analysis - River Bend Station | Reactor Vessel Water Level Ultimate heat sink Significance Determination Process |
ML13322A425 | 25 November 2013 | Transmittal of Final River Bend Station Accident Sequence Precursor Analysis | Ultimate heat sink |
RBG-47409, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements | 21 November 2013 | Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements | Fukushima Dai-Ichi |
ML13304A730 | 15 November 2013 | Reassignment to the DORL Plant Licensing IV-2 and Decommissioning Transition Branch Effective 11/3/2013 | |
ML13319A109 | 14 November 2013 | NRR E-mail Capture - River Bend Station, Unit 1, Request for Additional Information Regarding Relief Request RBS-ISI-019 | Aging Management EVT-1 |
IR 05000458/2013004 | 13 November 2013 | IR 05000458-13-004; 06/30/2013 - 09/28/2013; River Bend Station, Integrated Resident and Regional Report | Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Operability Assessment |
ML13311B381 | 7 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (QAPM) | |
RBG-47404, Unit 1, License Amendment Request 2013-17, Revision of the Ventilation Filter Testing Program and Associated Surveillance Requirements | 4 November 2013 | Unit 1, License Amendment Request 2013-17, Revision of the Ventilation Filter Testing Program and Associated Surveillance Requirements | Incorporated by reference Recently irradiated fuel |
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | 4 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13304A749 | 30 October 2013 | NRR E-mail Capture - Acceptance of Riverbend Station Request for Relief RBS-R&R-2013-001 (MF2733) | |
RBG-47403, Response Supplement Regarding Multi-Source Dose Assessment Commitment Related to Near-Term Task Force Recommendation 9.3 | 28 October 2013 | Response Supplement Regarding Multi-Source Dose Assessment Commitment Related to Near-Term Task Force Recommendation 9.3 | |
RBG-47401, Preliminary Accident Sequence Precursor Analysis Review | 24 October 2013 | Preliminary Accident Sequence Precursor Analysis Review | |
RBG-47402, Eighteenth Fuel Cycle Core Operating Limits Report (Colr), Revision 1 | 24 October 2013 | Eighteenth Fuel Cycle Core Operating Limits Report (Colr), Revision 1 | |
ML13233A183 | 23 October 2013 | Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant | Fukushima Dai-Ichi Minimum staff |
RBG-47400, Request for Relief RBS-R&R-2013-001, Request for Relief from ASME Boiler & Pressure Vessel Code | 17 October 2013 | Request for Relief RBS-R&R-2013-001, Request for Relief from ASME Boiler & Pressure Vessel Code | Stroke time FLEX |
ML13274A099 | 7 October 2013 | Supplemental Information Needed for Acceptance of Licensing Action, Relief Request RBS-R&R-2013-001, Alternative to ASME Code Section III for Postweld Heat Treatment Exemption, Third 10-Year ISI Interval | Incorporated by reference |
ML13281A802 | 2 October 2013 | Notification of Deviation from BWRVIP-183 | |
ML13266A369 | 2 October 2013 | J. Anderson Memo Request for Technical Assistance on License Amendment Request for Proposed Revision to Emergency Plan for Lacrosse Reactor | |
ML13277A357 | 30 September 2013 | Assistance in Obtaining Information on Dams | Fukushima Dai-Ichi |
TAC:MF3040 | 30 September 2013 | ||
IR 05000458/2013406 | 30 September 2013 | Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats, Inspection Report Number 05000458/2013406 | Affidavit |
ML13268A367 | 25 September 2013 | RBS Generic Fundamentals Examination Results | Generic Fundamentals Examination |
ML13268A420 | 25 September 2013 | Acceptance Review Email, License Amendment Request, Changes to Technical Requirements Manual and Updated Safety Analysis Report to Add Permanent Exception Allowing Heavy Load Movement Over Fuel Assemblies | |
ML13261A379 | 24 September 2013 | Request for Relief RBS-ISI-018 for Reactor Pressure Vessel Support Skirt for the Second 10-Year Inservice Inspection Interval | Incorporated by reference |
IR 05000458/2013008 | 13 September 2013 | ||
RBG-47390, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 1.5 Year | 12 September 2013 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 1.5 Year | Fukushima Dai-Ichi Earthquake |
IR 05000458/2013006 | 3 September 2013 | Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2013006) | |
IR 05000416/2013006 | 3 September 2013 | Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006) | |
RBG-47389, Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2013 | Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX |
ML13234A503 | 28 August 2013 | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 | FLEX |
RBG-47385, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
TAC:MF2599 | 26 August 2013 | ||
ML13233A231 | 26 August 2013 | YT020130149 - Redacted Transmittal Letter, Preliminary Accident Sequence Precursor Analysis for Licensee Review for River Bend Station, Unit 1 | |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
ML13203A128 | 21 August 2013 | Letter, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa | Exemption Request |
NRC-2013-0190, FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa | 20 August 2013 | FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa | Exemption Request |
ML13203A130 | 20 August 2013 | FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa | Exemption Request |
ML13239A074 | 19 August 2013 | Request for Relief from ASME Boiler & Pressure Vessel Code Section Iii | |
RBG-47386, Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat. | 19 August 2013 | Attachment 2 to RBG-47386 - Structural Integrity Report No. 1300615.401, Rev. 0, Acceptability of Weir Tricentric Butterfly Valves Having Stainless Steel Seat Fillet Welds Applied with 60 F Preheat. | Hydrostatic Coatings |
TAC:MF2733 | 19 August 2013 |