ML13233A231

From kanterella
Jump to navigation Jump to search

YT020130149 - Redacted Transmittal Letter, Preliminary Accident Sequence Precursor Analysis for Licensee Review for River Bend Station, Unit 1
ML13233A231
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/26/2013
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang A
Shared Package
ML13233A224 List:
References
TAC MF2599, YT020130149
Download: ML13233A231 (3)


Text

OFFICIAL USE ONLY SENSITI\\'E INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 26, 2013 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - PRELIMINARY ACCIDENT SEQUENCE PRECURSOR ANALYSIS FOR LICENSEE REVIEW (TAC NO. MF2599)

Dear Sir or Madam:

Enclosed is the preliminary result of an Accident Sequence Precursor (ASP) analysis of an operational event that occurred at River Bend Station, Unit 1 (RBS), as documented in Licensee Event Report 459/12-003 and inspection reports 50-458/12-09, 50-458/12-10. The event occurred on May 24.2012; while operating at 33 percent power, RBS experienced loss of power to all running feedwater (FW). Circulating water (CW). and normal service water (SW) pumps.

The operators initiated a manual reactor scram due to the trip of all running FW and CW pumps.

The plant entered EOP-1, "Reactor Pressure Vessel Control, n which initiated the reactor core isolation cooling (RCIC) system. Soon after the manual scram, the control room received a report of smoke from the circuitry board for FW pump B. Power was restored to the Train B CW and normal SW pumps via the Train A Buses; however. the pumps remained unavailable due to a cable failure that occurred on May 21, 2012. The operators used the RCIC system for level control and the safety relief valves for pressure control. RBS safely shut down and stabilized under cold shutdown conditions. The preliminary conditional core damage probability (CCDP) of this event is 3x 1 0"'; therefore, this event is a potential precursor. A precursor is an event that has a probability of at least 1 in 1,000,000 (i.e., a CCDP greater than or equal to 1 x1 0-6) of leading to core damage.

The U.S. Nuclear Regulatory Commission (NRC) established the ASP Program in 1979 in response to the Risk Assessment Review Group Report. The ASP Program systematically evaluates U.S. nuclear power plant operating experience to identify, document. and rank the operating events most likely to lead to inadequate core cooling and severe core damage (precursors).

As described in the NRC Regulatory Issue Summary (RIS) 2006-24, "Revised Review and Transmittal Process for Accident Sequence Precursor Analyses," the Office of Nuclear Regulatory Research implemented several process changes to the ASP Program. In accordance with the RIS, this event has a CCDP greater than or equal to 1 x10"'; therefore, a formal licensee review is requested.

The Enclosure to this letter contains Sensitive Information. When separated from the Enclosure, this letter is DECONTROLLED.

OFFICIAL USE ONLY SENSITIVE INFORMATION

O.... ICIAl USE ONLY SENSITIVE IN.. ORMATION

-2 In assessing operational events, the NRC staff strives to make the ASP models as realistic as possible regarding the specific features and response of a given plant to various accident sequence initiators. We realize that licensees may have additional systems and emergency procedures, or other features at their plants that might affect the analysis. Therefore, we are providing you an opportunity to review and comment on the technical adequacy of the preliminary ASP analysis, including the depiction of plant equipment and equipment capabilities.

Upon receipt and evaluation of your comments, we will revise the CCDP calculations where necessary to consider the specific information you have provided. The object of our review process is to provide as realistic an analysis of the Significance of the event as possible.

In order for us to incorporate your comments, perform any required reanalysis, and prepare the final report of our analysis in a timely manner, you are requested to complete your review and to provide any comments within 60 calendar days from the date of this letter. As soon as our final analysis of this event has been completed, we will provide for your information the final ASP analysis and the resolution of your comments.

The enclosed preliminary ASP analysis is pre-decisional material and, therefore. not publicly available. The document must be distributed only to those who have a need-to-know to conduct offiCial business. When completed, the final ASP analysis will be publicly released.

If you have any questions regarding the report, please contact me at Alan.Wang@nrc.gov or (301) 415-1445.

Sincerely.

~

WCL~\\~/~/

AJan B. Wang, projecl-Manager Plant licenSing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

Preliminary Precursor Analysis cc wlo

Enclosure:

Distribution via Listserv OF..ICIAl YSE ONLY SENSITIVE INFORMATION

OFFICIAL USE ONLY SENSITIVE INFORMATION

  • 2 In assessing operational events, the NRC staff strives to make the ASP models as realistic as possible regarding the specific features and response of a given plant to various accident sequence initiators. We realize that licensees may have additional systems and emergency procedures, or other features at their plants that might affect the analysis. Therefore, we are providing you an opportunity to review and comment on the technical adequacy of the preliminary ASP analysis, including the depiction of plant equipment and equipment capabilities.

Upon receipt and evaluation of your comments, we will revise the CCDP calculations where necessary to consider the specific information you have provided. The object of our review process is to provide as realistic an analysis of the significance of the event as possible.

In order for us to incorporate your comments. perform any required reanalysis, and prepare the final report of our analysis in a timely manner, you are requested to complete your review and to provide any comments within 60 calendar days from the date of this letter. As soon as our final analysis of this event has been completed, we will provide for your information the final ASP analysis and the resolution of your comments.

The enclosed preliminary ASP analysis is pre-decisional material and, therefore, not publicly available. The document must be distributed only to those who have a need-to-know to conduct official business. When completed, the final ASP analysis will be publicly released.

If you have any questions regarding the report, please contact me at Alan.Wang@nrc.gov or (301) 415-1445.

Sincerely.

IRA!

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

Preliminary Precursor Analysis cc w/o

Enclosure:

Distribution via Listserv DISTRIBUTION: YT020130149 Non-PubNc RidsNrrLA.lBurkhardt Resource CHunter. RES LPL4 RlF RidsNrrPMRiverBend Resource RCorreia. RES RidsAcrsAcnw_MailCTR Resource RidsRgn4MailCenter Resource RidsNrrOorlDpr Resource SWeerakkody, NRR ADAMS Accession Nos. Package ML13233A224; YT ML13238A161; OUO-SI Letter ML13233A226;

==_~O;;;.U~O;;;..-SI Enclosure ML13233A229' Redacted letter for Listserv ML13233A231

.. OFFICE NRRlDORLlLPL4/PM NRRlDORLlLPL4/LA NRRlDORLlLPL4IBC NRRlDORULPL4/PM JBurkhardt AWang

. NAME AWang 8/26/13 DATE 8/26/13 OFFICiAl USE ONLY SENSITIVE INFORMATION