Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13339A58830 December 2013G20120489/OEDO-2012-0421 - Response LTR to Petitioner 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric PlantReactor Vessel Water Level
Anticipated operational occurrence
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 819 December 2013License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8Safe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Power Uprate
BSEP 13-0137, License Renewal Commitment Completion, Evaluation of Operating Experience at Extended Power Uprate Conditions17 December 2013License Renewal Commitment Completion, Evaluation of Operating Experience at Extended Power Uprate ConditionsAging Management
Stress corrosion cracking
License Renewal
Flow Induced Vibration
Power Uprate
TAC:MF117611 December 2013
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
IR 05000324/20130076 December 2013IR 05000325-13-007 and 05000324-13-007, on 9/9/2013 - 10/24/2013; Brunswick Steam Electric Plant, Units 1 and 2, Component Design Bases InspectionSafe Shutdown
Mission time
Stroke time
Probabilistic Risk Assessment
Anchor Darling
Finite Element Analysis
Significance Determination Process
Large early release frequency
Time Critical Operator Action
Maintenance Rule Program
Grace period
Thermography
ML13340A3825 December 2013Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters
BSEP 13-0109, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident4 December 2013Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFunctionality Assessment
Fukushima Dai-Ichi
BSEP 13-0126, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns26 November 2013Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13220A09022 November 2013Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation StrategiesSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operator Manual Action
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
GOTHIC
BSEP 13-0122, Response to Proposed Director'S Decision21 November 2013Response to Proposed Director'S Decision
ML13317A59220 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operator Manual Action
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
BSEP 13-0108, Cancellation of Licensee Event Report 2-2013-002 for Brunswick Steam Electric Plant, Unit No. 219 November 2013Cancellation of Licensee Event Report 2-2013-002 for Brunswick Steam Electric Plant, Unit No. 2Finite Element Analysis
ML13269A34518 November 2013Interim Staff Evaluation and Request for RAI Re. the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Spent Fuel Pool Instrumentation
Fire Protection Program
ML13312A87315 November 2013Project Manager Reassignment
ML13312A88515 November 2013Branch Chief Reassignment for Plant Licensing Branch II-2
IR 05000324/201300413 November 2013IR 05000325-13-004, 05000324-13-004: on 07/01/13 09/30/13; Brunswick Steam Electric Plant, Units 1 & 2; Operability Evaluations and Post Maintenance TestingSafe Shutdown
Packing leak
Mission time
Offsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Through Wall Leak
Fire Protection Program
Siren
ML13312A9888 November 2013Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications
BSEP 13-0118, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation7 November 2013Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results6 November 201310 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing ResultsFitness for Duty
ML13310C3026 November 2013NRR E-mail Capture - Status Report on Your July 10, 2012 Petition Request
ML13308A0071 November 2013Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection.
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13233A18323 October 2013Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power PlantFukushima Dai-Ichi
Minimum staff
ML13144A21523 October 2013G20120489 - David A. Lochbaum Ltr. 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant - Proposed Director'S Decision Under 10 CFR 2.206Reactor Vessel Water Level
Anticipated operational occurrence
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
ML13157A08923 October 2013G20120489 - Response to Licensee Re. 2.206-Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant
ML13144A21123 October 2013G20120489/EDATS: OEDO-2012-0421 - Response to David A. Lochbaum Ltr. 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant
ML13295A30622 October 2013Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC
ML13267A29321 October 2013Issuance of Amendments 263, 291, 142 and 236 Re Name Change (TAC Nos, MF1463-MF1466)Safe Shutdown
Cyber Security
Safeguards Contingency Plan
License Renewal
Offsite Circuit
Fire Protection Program
Power Uprate
RA-13-020, Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask8 October 2013Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
BSEP 13-0107, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624)30 September 2013Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624)Safe Shutdown
High winds
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
BSEP 13-0104, Submittal of August 20, 2013, Presentation Regarding Methods Applicability for Maximum Extended Load Line Limit Analysis Plus (Mellla+)24 September 2013Submittal of August 20, 2013, Presentation Regarding Methods Applicability for Maximum Extended Load Line Limit Analysis Plus (Mellla+)Affidavit
ML13277A03824 September 2013GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel
ML13277A04119 September 2013Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 EditionSafe Shutdown
High winds
Ultimate heat sink
Non-Destructive Examination
Mission time
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Scram Discharge Volume
Large early release frequency
Exemption Request
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
RA-13-018, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site11 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SiteSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13254A04010 September 2013Notification of Inspection and Request for Information
BSEP 13-0063, Supplemental Information Regarding Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident10 September 2013Supplemental Information Regarding Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentFukushima Dai-Ichi
BSEP 13-0100, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors5 September 2013Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
ML13232A1744 September 2013Branch Chief Reassignment for Plant Licensing Branch II-2
ML13246A0593 September 2013Mid Cycle Assessment LetterEnforcement Discretion
License Renewal
BSEP 13-0099, Response to NRC Request for Additional Information Regarding Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification(Ts) 3.8.1, AC Sources - Operating.29 August 2013Response to NRC Request for Additional Information Regarding Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification(Ts) 3.8.1, AC Sources - Operating.High winds
Probabilistic Risk Assessment
Operating Basis Earthquake
Thermoset
Large early release frequency
Power Uprate
BSEP 13-0097, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 80529 August 2013Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805Safe Shutdown
Mission time
Fire Barrier
Probabilistic Risk Assessment
Thermoset
Large early release frequency
Fire Protection Program
GOTHIC
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13246A27728 August 2013Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, AugustSafe Shutdown
Non-Destructive Examination
Fire Barrier
Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Scram Discharge Volume
Large early release frequency
Exemption Request
Fire Protection Program
RA-13-016, Duke Energy Progress, Inc., First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)26 August 2013Duke Energy Progress, Inc., First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
RA-13-019, Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 423 August 2013Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 4Fitness for Duty
Grab sample
Met Tower
Cyber Security
Deep Dose Equivalent
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
BSEP 13-0088, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)20 August 2013First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Operator Manual Action
FLEX
B.5.b
Spent Fuel Pool Instrumentation
ML13277A03720 August 2013Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013Power Uprate