Issue date | Title | Topic | |
---|---|---|---|
ML13339A588 | 30 December 2013 | G20120489/OEDO-2012-0421 - Response LTR to Petitioner 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant | Reactor Vessel Water Level Anticipated operational occurrence Probabilistic Risk Assessment Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 | 19 December 2013 | License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program Power Uprate |
BSEP 13-0137, License Renewal Commitment Completion, Evaluation of Operating Experience at Extended Power Uprate Conditions | 17 December 2013 | License Renewal Commitment Completion, Evaluation of Operating Experience at Extended Power Uprate Conditions | Aging Management Stress corrosion cracking License Renewal Flow Induced Vibration Power Uprate |
TAC:MF1176 | 11 December 2013 | ||
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
IR 05000324/2013007 | 6 December 2013 | IR 05000325-13-007 and 05000324-13-007, on 9/9/2013 - 10/24/2013; Brunswick Steam Electric Plant, Units 1 and 2, Component Design Bases Inspection | Safe Shutdown Mission time Stroke time Probabilistic Risk Assessment Anchor Darling Finite Element Analysis Significance Determination Process Large early release frequency Time Critical Operator Action Maintenance Rule Program Grace period Thermography |
ML13340A382 | 5 December 2013 | Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters | |
BSEP 13-0109, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 4 December 2013 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | Functionality Assessment Fukushima Dai-Ichi |
BSEP 13-0126, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 26 November 2013 | Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13220A090 | 22 November 2013 | Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Operator Manual Action Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Battery sizing Earthquake GOTHIC |
BSEP 13-0122, Response to Proposed Director'S Decision | 21 November 2013 | Response to Proposed Director'S Decision | |
ML13317A592 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Operator Manual Action Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Battery sizing Earthquake |
BSEP 13-0108, Cancellation of Licensee Event Report 2-2013-002 for Brunswick Steam Electric Plant, Unit No. 2 | 19 November 2013 | Cancellation of Licensee Event Report 2-2013-002 for Brunswick Steam Electric Plant, Unit No. 2 | Finite Element Analysis |
ML13269A345 | 18 November 2013 | Interim Staff Evaluation and Request for RAI Re. the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Spent Fuel Pool Instrumentation Fire Protection Program |
ML13312A873 | 15 November 2013 | Project Manager Reassignment | |
ML13312A885 | 15 November 2013 | Branch Chief Reassignment for Plant Licensing Branch II-2 | |
IR 05000324/2013004 | 13 November 2013 | IR 05000325-13-004, 05000324-13-004: on 07/01/13 09/30/13; Brunswick Steam Electric Plant, Units 1 & 2; Operability Evaluations and Post Maintenance Testing | Safe Shutdown Packing leak Mission time Offsite Dose Calculation Manual Internal Flooding Probabilistic Risk Assessment Temporary Modification Condition Adverse to Quality Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Through Wall Leak Fire Protection Program Siren |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
BSEP 13-0118, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation | 7 November 2013 | Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation | |
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | 6 November 2013 | 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results | Fitness for Duty |
ML13310C302 | 6 November 2013 | NRR E-mail Capture - Status Report on Your July 10, 2012 Petition Request | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13233A183 | 23 October 2013 | Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant | Fukushima Dai-Ichi Minimum staff |
ML13144A215 | 23 October 2013 | G20120489 - David A. Lochbaum Ltr. 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant - Proposed Director'S Decision Under 10 CFR 2.206 | Reactor Vessel Water Level Anticipated operational occurrence Probabilistic Risk Assessment Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
ML13157A089 | 23 October 2013 | G20120489 - Response to Licensee Re. 2.206-Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant | |
ML13144A211 | 23 October 2013 | G20120489/EDATS: OEDO-2012-0421 - Response to David A. Lochbaum Ltr. 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant | |
ML13295A306 | 22 October 2013 | Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC | |
ML13267A293 | 21 October 2013 | Issuance of Amendments 263, 291, 142 and 236 Re Name Change (TAC Nos, MF1463-MF1466) | Safe Shutdown Cyber Security Safeguards Contingency Plan License Renewal Offsite Circuit Fire Protection Program Power Uprate |
RA-13-020, Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask | 8 October 2013 | Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask | |
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Earthquake Hardened vent Backfit |
BSEP 13-0107, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624) | 30 September 2013 | Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624) | Safe Shutdown High winds Fire Barrier Probabilistic Risk Assessment Large early release frequency |
BSEP 13-0104, Submittal of August 20, 2013, Presentation Regarding Methods Applicability for Maximum Extended Load Line Limit Analysis Plus (Mellla+) | 24 September 2013 | Submittal of August 20, 2013, Presentation Regarding Methods Applicability for Maximum Extended Load Line Limit Analysis Plus (Mellla+) | Affidavit |
ML13277A038 | 24 September 2013 | GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel | |
ML13277A041 | 19 September 2013 | Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition | Safe Shutdown High winds Ultimate heat sink Non-Destructive Examination Mission time Fire Barrier Time to boil Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Fire impairment Operator Manual Action Multiple Spurious Operation Emergency Lighting Significance Determination Process Scram Discharge Volume Large early release frequency Exemption Request Fire Protection Program Fire Watch Very Early Warning Fire Detection |
RA-13-018, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site | 11 September 2013 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13254A040 | 10 September 2013 | Notification of Inspection and Request for Information | |
BSEP 13-0063, Supplemental Information Regarding Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 10 September 2013 | Supplemental Information Regarding Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |
BSEP 13-0100, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 5 September 2013 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
ML13232A174 | 4 September 2013 | Branch Chief Reassignment for Plant Licensing Branch II-2 | |
ML13246A059 | 3 September 2013 | Mid Cycle Assessment Letter | Enforcement Discretion License Renewal |
BSEP 13-0099, Response to NRC Request for Additional Information Regarding Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification(Ts) 3.8.1, AC Sources - Operating. | 29 August 2013 | Response to NRC Request for Additional Information Regarding Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification(Ts) 3.8.1, AC Sources - Operating. | High winds Probabilistic Risk Assessment Operating Basis Earthquake Thermoset Large early release frequency Power Uprate |
BSEP 13-0097, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 | 29 August 2013 | Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 | Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment Thermoset Large early release frequency Fire Protection Program GOTHIC |
ML13234A503 | 28 August 2013 | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 | FLEX |
ML13246A277 | 28 August 2013 | Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, August | Safe Shutdown Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Emergency Lighting Scram Discharge Volume Large early release frequency Exemption Request Fire Protection Program |
RA-13-016, Duke Energy Progress, Inc., First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 26 August 2013 | Duke Energy Progress, Inc., First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
RA-13-019, Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 4 | 23 August 2013 | Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 4 | Fitness for Duty Grab sample Met Tower Cyber Security Deep Dose Equivalent |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
BSEP 13-0088, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 20 August 2013 | First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Operator Manual Action FLEX B.5.b Spent Fuel Pool Instrumentation |
ML13277A037 | 20 August 2013 | Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 | Power Uprate |