Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ZS-2014-0100, Offsite Dose Calculation Manual31 December 2013Offsite Dose Calculation ManualBoric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
B.5.b Mitigating Strategies
Deep Dose Equivalent
ML13360A18326 December 2013Exelon'S Answer Opposing Appeal of ASLB Denial of Elpc'S Petition for Intervention and Hearing Request as Request for Protective Stay
ML13360A34126 December 2013NRC Staff Answer to Environmental Law and Policy Center Appeal of LBP-13-12 and Request for Protective Stay
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
ML13358A40020 December 2013Inservice Inspection Summary Report for Refueling Outage 17Moisture barrier
Liquid penetrant
ML13350A51220 December 2013Request for Additional Information for the Review of the Braidwood Nuclear Stations License Renewal Application - Environmental Audit (TAC Nos. MF1832, MF1833, MF1792, and MF1793)Environmental Justice
ML13354B93720 December 2013RAI Braidwood Nuclear StationEnvironmental Justice
ML14007A08119 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 12 of 15Zebra Mussel
ML14007A08319 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 2 of 15High winds
Grab sample
Annual Radiological Environmental Operating Report
Environmental Justice
ML14007A08919 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 14 of 15Safe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Grab sample
Zebra Mussel
Incorporated by reference
Biofouling
ML14007A08419 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 3 of 15Grab sample
Zebra Mussel
ML14007A08219 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 1 of 15
ML14007A08819 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 13 of 15Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Tritium
ML14007A09019 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 7 of 15
ML13353A69619 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental ReportEnvironmental Justice
RS-13-285, Bryon, Units 1 and 2, Updated Responses to Two NRC Requests for Additional Information from Set 1, Dated October 7, 2013, Related to the License Renewal Application19 December 2013Bryon, Units 1 and 2, Updated Responses to Two NRC Requests for Additional Information from Set 1, Dated October 7, 2013, Related to the License Renewal ApplicationBoric Acid
Hydrostatic
VT-2
Aging Management
ML14007A08519 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 5 of 15Grab sample
ML14007A10519 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 15 of 15
ML14007A09219 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 9 of 15
RS-13-274, Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal Application19 December 2013Response to NRC Requests for Additional Information, Set 5, Dated November 22, 2013, Related to License Renewal ApplicationSafe Shutdown
Fire Barrier
Coatings
Aging Management
RS-13-282, Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 4 of 1519 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 4 of 15
ML14007A09419 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 10 of 15Grab sample
Zebra Mussel
RS-13-273, Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal Application17 December 2013Responses to NRC Requests for Additional Information, Set 3, Dated November 25, 2013, Related to the License Renewal ApplicationAging Management
ML13225A59217 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML13326B01117 December 2013Correction of Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
ML13350A66616 December 2013Appeal of ASLB Denial of Elpc'S Petition for Intervention and Hearing Request as Request for Protective Stay
ML13350A66216 December 2013Notice of Appeal of ASLBP No. 13-929-02-LR-BD01 by Environmental Law & Policy Center
TAC:ME179113 December 2013
ML13312A31713 December 2013Audit Trip Report SAMAProbabilistic Risk Assessment
ML13350A34213 December 2013Reply to Notice of Violation, EA-13-209Exemption Request
ML13282A36913 December 2013Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 2 (TAC Nos. MF1879, MF1880, MF1881, and MF1882Coatings
Aging Management
Moisture barrier
ML13281A56912 December 2013Request for Additional Information for the Review of the Byron Nuclear Station Units 1 and 2, and the Braidwood Nuclear Station Units 1 and 2, LRA - Aging Management, Set 4Aging Management
RA-13-119, Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1.12 December 2013Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1.
TAC:NF188112 December 2013
ML13267A0809 December 2013Reactor Systems Branch Safety Evaluation Input to Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 Measurement Uncertainty Recapture Power UpdateExemption Request
ML13338A6249 December 2013Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Braidwood Station, Units 1 and 2, TAC Nos.: MF0895 and MF0896Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML14007A0869 December 2013Response to NRC Request for Additional Information, Dated November 21, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Byron Station Applicant'S Environmental Report. Part 6 of 15Zebra Mussel
TAC:MF46716 December 2013
ML13318A2383 December 2013Summary of Site Audit Related to the Review of the License Renewal Application for Braidwood Station, Units 1 and 2 (TAC Nos. MF1832, MF1833, and MF1792, MF1793
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns27 November 2013Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic WalkdownsFukushima Dai-Ichi
Design basis earthquake
ML13281A57425 November 2013Requests for Additional Information for the Review of the Byron Nuclear Station, Units 1 and 2, and Braidwood Nuclear Station, Units 1 and 2, License Renewal Application - Aging Management, Set 3 (TAC Nos. MF1879, MF1880, MF1881, and MF1882Aging Management
ML13303B46325 November 2013Summary of Telephone Conference Call Held on October 22, 2013, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Concerning RAI Set 3 for the Byron-Braidwood LRA
ML13323A82319 November 2013Memorandum and Order (Denying Hearing Request and Petition to Intervene)
ML13324A09418 November 2013Supplemental Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainly Recapture Power UprateGOTHIC
ML13318A92614 November 2013Exelon'S Motion to Strike Portions of Elpc'S Reply
IR 05000456/201300814 November 2013IR 05000456-13-008; 050000457-13-008; 09/09/2013 - 10/29/2013; Braidwood Station, Inservice InspectionBoric Acid
Non-Destructive Examination
Weld Overlay
Significance Determination Process
Pressure and Temperature Limits Report
Exemption Request
Opportunity to foresee and correct
Through-Wall Leakage
IR 05000456/201300414 November 2013IR 05000456-13-004; 05000457-13-004; 07/01/2013 - 09/30/2013; Braidwood Station, Units 1 and 2; Other ActivitiesBoric Acid
Grab sample
Water Inventory Control
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Temporary Modification
Functionality Assessment
Significance Determination Process
Large early release frequency
Earthquake
Through-Wall Leak
Fire Protection Program
GOTHIC
RS-13-267, Supplemental Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate13 November 2013Supplemental Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate
ML13310B6856 November 2013NRR E-mail Capture - Preliminary Additional RAI Questions Regarding Use of Code Case N-786
ML13311A3136 November 20132013 Annual Report - Guarantees of Payment of Deferred Premiums