Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NRC 2011-0033, Supplement to License Amendment Request 263, Response to Request for Additional Information Re Cyber Security Plan | 31 March 2011 | Supplement to License Amendment Request 263, Response to Request for Additional Information Re Cyber Security Plan | Safe Shutdown Cyber Security Fuel cladding Fire Protection Program |
ML11091A047 | 31 March 2011 | Gfes Results March 2011 | Generic Fundamentals Examination |
ML110320060 | 25 March 2011 | (Pbnp), Units 1 and 2 - Issuance of License Amendments Revision of Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrumentation Setpoints | Safe Shutdown Hydrostatic Fuel cladding |
L-2011-058, Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | 23 March 2011 | Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units | Decommissioning Funding Plan |
NRC 2011-0021, License Amendment Request 262 Revision to Technical Specification Operating Limits to Include Measurement Uncertainty | 23 March 2011 | License Amendment Request 262 Revision to Technical Specification Operating Limits to Include Measurement Uncertainty | Boric Acid Probabilistic Risk Assessment |
NRC 2011-0035, Cycle 32 (U2C32) Core Operating Limits Report | 23 March 2011 | Cycle 32 (U2C32) Core Operating Limits Report | Shutdown Margin |
ML110820699 | 22 March 2011 | 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request | Internal Flooding Multiple Spurious Operation |
ML110770349 | 22 March 2011 | 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request | Internal Flooding Multiple Spurious Operation |
L-2011-094, Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown Anticipated operational occurrence |
L-2011-094, Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | 18 March 2011 | Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown |
ML110800536 | 18 March 2011 | Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages. | Safe Shutdown Anticipated operational occurrence |
L-2011-096, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 14 March 2011 | Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
NRC-2011-0029, License Amendment Request 241, Alternative Source Term, Revision of Previous Commitment | 11 March 2011 | License Amendment Request 241, Alternative Source Term, Revision of Previous Commitment | |
ML110610427 | 7 March 2011 | Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold | |
IR 05000266/2011001 | 4 March 2011 | Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (05000266-11-001; 05000301-11-001) | Power Uprate |
NRC 2011-0028, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information | 4 March 2011 | License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information | |
Press Release-11-035, NRC Advisory Committee on Reactor Safeguards to Meet March 10-12 in Rockville, MD | 3 March 2011 | Press Release-11-035: NRC Advisory Committee on Reactor Safeguards to Meet March 10-12 in Rockville, MD | |
NRC 2011-0027, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information | 2 March 2011 | License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information | Boric Acid |
NRC 2011-0024, Submittal of 2010 Fitness for Duty Performance Data | 25 February 2011 | Submittal of 2010 Fitness for Duty Performance Data | Fitness for Duty |
NRC 2011-0025, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information | 22 February 2011 | License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information | Coatings |
ML110460651 | 14 February 2011 | Confirmation of Initial License Examination | |
NRC 2011-0020, Supplement to License Amendment Request 241 Alternative Source Team Additional Operating License Condition | 10 February 2011 | Supplement to License Amendment Request 241 Alternative Source Team Additional Operating License Condition | |
IR 05000266/2010005 | 10 February 2011 | IR 05000266-10-005, 05000301-10-005, on 10/01/10 - 12/31/10, Point Beach Nuclear Plant, Units 1 & 2, Surveillance Testing, Problem Identification and Resolution, and Follow-Up of Events and Notices of Enforcement Discretion | Safe Shutdown Unanalyzed Condition Time of Discovery Offsite Dose Calculation Manual Fire Barrier Past operability Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination Fire Protection Program Downpower Operability Assessment |
NRC 2011-0010, Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 4 February 2011 | Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Coatings |
ML110460281 | 28 January 2011 | Submittal of After Action Report/Improvement Plan for the October 26, 2010, Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise | Nuclear Accident Reporting System Deep Dose Equivalent |
ML110380285 | 28 January 2011 | U.S. Dept of Homeland Security/After Action Report/Improvement Plan for the October 26, 2010, Radiological Emergency Preparedness (REP) Full Participation Plume Pathway Exercise for the Point Beach Nuclear Plant/Letter | |
ML110280210 | 28 January 2011 | Letter from the Secretary to Mr. Robert Leyse Regarding His Submission Dated January 11, 2011 | |
NRC 2011-0017, License Amendment Request 261, Extended Power Uprate, Response to Request for Clarification | 27 January 2011 | License Amendment Request 261, Extended Power Uprate, Response to Request for Clarification | Boric Acid |
NRC 2011-0016, License Amendment Request 241, Alternative Source Term, Dose Analysis Revision | 27 January 2011 | License Amendment Request 241, Alternative Source Term, Dose Analysis Revision | |
NRC 2011-0013, License Amendment Request 261 Extended Power Uprate, Response to Request for Clarification | 21 January 2011 | License Amendment Request 261 Extended Power Uprate, Response to Request for Clarification | Boric Acid Time Critical Operator Action |
IR 05000266/2010501 | 14 January 2011 | IR 05000266-10-501, 05000301-10-501, on 12/31/10, Point Beach Nuclear Plant, Units 1 and 2, NRC Emergency Preparedness Annual Inspection | |
NRC 2011-0003, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information | 13 January 2011 | License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information | Job Performance Measure Time Critical Operator Action |
NRC 2011-0008, CFR 50.55a Request, Relief Request RR-23 Residual Heat Removal Heat Exchanger - Nozzle Examination Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information | 13 January 2011 | CFR 50.55a Request, Relief Request RR-23 Residual Heat Removal Heat Exchanger - Nozzle Examination Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information | VT-2 |
TAC:ME4674 | 13 January 2011 | ||
ML110320083 | 12 January 2011 | Email to Robert Leyse Regarding His Submission of January 11, 2011 | |
NRC 2011-0009, License Amendment Request 261 Extended Power Uprate Response to Request for Clarification | 11 January 2011 | License Amendment Request 261 Extended Power Uprate Response to Request for Clarification | |
ML110130280 | 8 January 2011 | Comment (7) of Susan Michetti, on Behalf of Self, on Point Beach, Wi, Reactor Power Uppage Be Extended Due to Process Flaws Involving the Federal Register | Chernobyl |
ML110110353 | 7 January 2011 | Comment (4) of Dennis Dums and Katie Nekola, on Point Beach, Units 1 & 2 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate | |
NRC 2011-0002, License Amendment Request 261, Extended Power Uprate Response to Request for Clarification | 7 January 2011 | License Amendment Request 261, Extended Power Uprate Response to Request for Clarification | Boric Acid Mission time |
NRC 2011-0004, License Amendment Request 261 Extended Power Uprate Response to Request for Clarification | 7 January 2011 | License Amendment Request 261 Extended Power Uprate Response to Request for Clarification | |
ML110130282 | 6 January 2011 | Comment (9) of Micheal Komba on Behalf of Self, Opposing Point Beach'S Extended Power Uprate Proposal | |
ML110110352 | 6 January 2011 | Comment (3) of Susan Michetti, on Proposed 17% EPU at Point Beach Wi Reactors | |
ML110100330 | 6 January 2011 | Comment (2) of Christopher Laforge, Opposing Point Beach Extended Power Uprate (EPU) Proposal | |
NRC-2010-0380, Comment (10) of Marlk M. Giese on Behalf of Self Opposing Point Beach'S, Units 1 and 2, Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate | 6 January 2011 | Comment (10) of Marlk M. Giese on Behalf of Self Opposing Point Beach'S, Units 1 and 2, Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate | |
ML110180663 | 6 January 2011 | Comment (12) of Holly Loveland and Julia Kleppin Opposing Point Beach Extended Power Uprate Proposal | |
ML110130281 | 5 January 2011 | Comment (8) of Don Timmerman & Roberta Thurstin Timmerman on Behalf of Themselves, Opposing to the Expansion of Point Beach Plant, Units 1,2, Draft Environmental Assessment | |
NRC 2010-0196, Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 | 5 January 2011 | Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 | Coatings |
ML110140553 | 5 January 2011 | Comment (11) of John Laforge Opposing Point Beach Extended Power Uprate (EPU) Proposal |