Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-11-143, Annual Environmental and Effluent Release Report | 31 March 2011 | Annual Environmental and Effluent Release Report | Safe Shutdown Grab sample Offsite Dose Calculation Manual Zebra Mussel Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Veliger Earthquake Fuel cladding |
TAC:ME6805 | 29 March 2011 | ||
L-11-102, Submittal of the Decommissioning Reports | 29 March 2011 | Submittal of the Decommissioning Reports | |
L-11-083, Submittal of Inservice Examination Plan | 28 March 2011 | Submittal of Inservice Examination Plan | Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Moisture barrier Earthquake EVT-1 Liquid penetrant Through-Wall Leak Fire Protection Program Dissimilar Metal Weld DM weld Scaffolding Grace period |
L-11-082, Submittal of Inservice Testing Programs | 25 March 2011 | Submittal of Inservice Testing Programs | Safe Shutdown High Radiation Area Stroke time Nondestructive Examination Squib Scram Discharge Volume Cold shutdown justification Power Operated Valves Scaffolding |
L-11-090, Supplemental Information Related to Modification of Technical Specification 2.1.1, Reactor Core Sls. | 17 March 2011 | Supplemental Information Related to Modification of Technical Specification 2.1.1, Reactor Core Sls. | Safety Limit Minimum Critical Power Ratio |
IR 05000440/2011403 | 16 March 2011 | IR 05000440-11-403(DRS); 02/17/11 - 02/18/11; Perry Nuclear Power Plant; Routine Security Baseline Inspection | |
L-11-086, Ohio Environmental Protection Agency Approval for Essential Maintenance Discharge Change | 15 March 2011 | Ohio Environmental Protection Agency Approval for Essential Maintenance Discharge Change | |
L-11-084, Retrospective Premium Guarantee | 15 March 2011 | Retrospective Premium Guarantee | |
IR 05000440/2011010 | 11 March 2011 | IR 07200069-11-002 (Dnms); 05000440-11-010 - Dry Fuel Storage Stack-Up Operations at the Perry Nuclear Plant | Significance Determination Process Control of Heavy Loads |
ML110670597 | 10 March 2011 | Request for Additional Information, Related to the License Amendment Request for Approval of the Cyber Security Plan | Cyber Security |
L-11-042, Annual Notification of Nuclear Property Insurance Coverage | 7 March 2011 | Annual Notification of Nuclear Property Insurance Coverage | |
TAC:ME5375 | 4 March 2011 | ||
ML110620306 | 4 March 2011 | EOC Annual Assessment Letter and Inspection/Activity Plan | |
TAC:ME5373 | 4 March 2011 | ||
ML110560694 | 4 March 2011 | Acceptance of Requested Licensing Action 10 CFR 50.55A Relief Requests in Support of the Third 10-Year Inservice Inspection Interval | VT-2 |
ML110550090 | 4 March 2011 | Request for Withholding Information from Public Disclosure, TAC No. ME4925 | |
ML110620725 | 3 March 2011 | ISI Notification of Inspection and Request for Information | Nondestructive Examination |
ML110601213 | 28 February 2011 | 2010 FFD Annual Reporting Form for Drug and Alcohol Tests for the EIE General Submission Portal | |
ML110601215 | 28 February 2011 | 10 CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2010 | |
ML110601216 | 28 February 2011 | Single Positive Test Form for Cause, Collected on 04/05/2010 | |
ML110601218 | 28 February 2011 | Single Positive Test Form for Cause, Collected on 10/05/2010 | |
IR 05000440/2009008 | 17 February 2011 | IR 07200069-09-001(DNMS) and 05000440-09-008, on October 14 16, 2009; November 10 12, 2009; April 5 7, 2010; December 1 3, 2010; and In-office Review Completed January 7, 2011, Perry Pad Construction Final | Moisture Density Gauge |
L-11-050, 2010 Annual Report | 16 February 2011 | 2010 Annual Report | |
ML110460487 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades | |
L-11-052, Submittal of January NPDES Discharge Monitoring Report | 15 February 2011 | Submittal of January NPDES Discharge Monitoring Report | |
ML110480054 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades | |
ML110410373 | 10 February 2011 | Sholly Report for Fr Publication on February 22, 2011 | Past operability Pressure and Temperature Limits Report Exemption Request Fuel cladding |
NRC-2011-0040, Sholly Report for Fr Publication on February 22, 2011 | 10 February 2011 | Sholly Report for Fr Publication on February 22, 2011 | Past operability Pressure and Temperature Limits Report Exemption Request Fuel cladding |
L-11-036, Distribution of Site-Specific and State Emergency Planning Information | 9 February 2011 | Distribution of Site-Specific and State Emergency Planning Information | |
L-11-051, Fitness-For-Duty Performance Data Revision | 7 February 2011 | Fitness-For-Duty Performance Data Revision | |
ML110420145 | 4 February 2011 | Final Report for September 28, 2010, Radiological Emergency Preparedness Partial Participation Plume Exposure Pathway Exercise | Fire Watch |
IR 05000440/2010005 | 1 February 2011 | IR 05000440-10-005, on 10/01/2010 - 12/31/2010, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Surveillance Testing, and Problem Identification and Resolution | High winds Reactor Vessel Water Level Half scram Stroke time Internal Flooding Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Tornado-Generated Missile Significance Determination Process Job Performance Measure Operability Determination Fire Protection Program |
L-10-246, 10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval | 24 January 2011 | 10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval | VT-2 EVT-1 Through-Wall Leak Fire Protection Program |
TAC:ME4373 | 24 January 2011 | ||
L-11-017, State of Ohio Water Withdrawal Report | 24 January 2011 | State of Ohio Water Withdrawal Report | |
L-11-014, Quarterly Report for the Period October 1 Through December 31, 2010 | 24 January 2011 | Quarterly Report for the Period October 1 Through December 31, 2010 | |
L-11-015, Annual Emission Report, Facility Id: 02-43-12-0922 | 24 January 2011 | Annual Emission Report, Facility Id: 02-43-12-0922 | |
ML110200170 | 21 January 2011 | Acceptance of Requested Licensing Action License Amendment Request to Revise the TS 3.1.4, Control Rod Scram Times to Incorporate TSTF | |
ML110120161 | 20 January 2011 | Acceptance of Requested Licensing Action License Amendment Request to Modify Technical Specification 3.1.4 Control Rod Scram Times to Incorporate Technical Specification Task Force-222-A, Revision 1 | |
ML110060385 | 20 January 2011 | Request for Additional Information, Related to the License Amendment Request for Approval of the Perry Cyber Security Plan | Cyber Security |
ML110210178 | 14 January 2011 | Ohio Department of Public Safety, Request Permission to Observe the NRC Inspection Concerning Radiation Monitoring Instrumentation, Reactor Coolant System Activity, Occupational Exposure Control Effectiveness and Rets/Odcm Radiation Effluen | |
IR 05000440/2010501 | 14 January 2011 | Ltr. 01/14/2011 Perry Re NRC Emergency Preparedness Annual Inspection Report No 05000440/2010501 | |
L-11-016, December NPDES Discharge Monitoring Report | 13 January 2011 | December NPDES Discharge Monitoring Report | |
L-10-340, Semi-Annual Sewage Isotopic Report | 7 January 2011 | Semi-Annual Sewage Isotopic Report | |
ML110040168 | 6 January 2011 | Request for Additional Information Related to the License Amendment Request for Modification of TS 2.1.1, Reactor Core Sls. | Minimum Critical Power Ratio |