Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11103A053 | 31 March 2011 | License Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | Safe Shutdown Boric Acid High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Stroke time Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Operability Determination Battery sizing Earthquake Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
ML11103A009 | 31 March 2011 | Response to Second Request for Additional Information for the Review of the Cyber Security Plan | Cyber Security |
TAC:ME5513 | 30 March 2011 | ||
ML110950393 | 30 March 2011 | Decommissioning Funding Status Report - 2010 | |
ML110880261 | 29 March 2011 | Licensee Slides from March 29, 2011 Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal of a License Amendment Request to Revise TS Pages | |
ML110880275 | 29 March 2011 | Revised Technical Specifications from March 29, 2011 Pre-Licensing Meeting with Arizona Public Service Company to Discuss Potential Submittal of a License Amendment Request to Revise TS Pages | |
ML110880305 | 29 March 2011 | Notice of Special Open Meeting with Arizona Corporation Commission | |
ML110880313 | 28 March 2011 | Response Letter to Gary Pierce, Arizona Corporation Commission Special Open Meeting Scheduled for 03/29/11 | |
ML110880255 | 24 March 2011 | Arizona Corporation Commission, Scheduled Special Open Meeting Agenda Item | |
TAC:ME5785 | 24 March 2011 | ||
ML110700690 | 24 March 2011 | G20110153/LTR-11-0093/EDATS: SECY-2011-0108 - Said Abdel-Khalik Ltr Re Report on the Safety Aspects of the License Renewal Application for the Palo Verde Nuclear Generating Station | Aging Management |
ML110910242 | 24 March 2011 | Present Levels of Financial Protection | |
ML110950658 | 23 March 2011 | Submittal of Defect Discovered on Asea Brown Boveri Abb K600S 480 Vac Class 1E Breaker - Bell Alarm Switch Bracket Misalignment | |
ML110880327 | 23 March 2011 | Enclosure to Response Letter (Ti 2515-183), NRC Inspection Manual | Boric Acid Severe Accident Management Guideline B.5.b Mitigating Strategies Earthquake |
ML110880282 | 22 March 2011 | Arizona Corporation Commission, Request Palo Verde and Salt River Project to Answer in Writing and in a Presentation in the Upcoming Open Meeting | |
ML110800025 | 18 March 2011 | Email, Request for Additional Information Report Summarizing Results of the 2010 Steam Generator Tube Inspections | |
ML110800028 | 18 March 2011 | Request for Additional Information, Report Summarizing Results of the 2010 Steam Generator Tube Inspections | |
ML110770100 | 18 March 2011 | Notice of Meeting with Arizona Public Service Company to Discuss Potential Submittal to Revise Technical Specification 3.7.4, Atmospheric Dump Valves for Palo Verde, Units 1, 2, and 3 | |
TAC:ME5009 | 18 March 2011 | ||
ML110820342 | 18 March 2011 | Comment (10) of Thomas N. Weber, on Behalf of Arizona Public Service, on Draft NRC Regulatory Issue Summary 2011-XX, Adequacy of Station Electric Distribution System Voltages | Offsite Circuit Backfit |
TAC:ME5233 | 18 March 2011 | ||
ML110800379 | 18 March 2011 | NRR E-mail Capture - Draft Request for Additional Information - Palo Verde Nuclear Generating Station, Unit 1, Steam Generator Tube Inspection Report | |
ML110880272 | 17 March 2011 | Arizona Corporation Commission, Request Ensuring the Commissioners and the Public Are Familiar with Safety Precaution and Procedures at Palo Verde | |
ML110880072 | 17 March 2011 | Clarification to Response to Request for Additional Information for the Review of License Renewal Application (Lra), and Amendment No. 31 | |
ML110880075 | 16 March 2011 | Independent Spent Fuel Storage Installation (Isfsi), Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX084 | |
ML110750020 | 8 March 2011 | Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX083 | |
ML110630137 | 4 March 2011 | Annual Assessment Letter for Palo Verde Nuclear Generating Station, Unit 1, 2, & 3 (IR 05000528-11-001, 05000529-11-001, 05000530-11-001, on 02/03/2011) | |
IR 05000528/2011001 | 4 March 2011 | Annual Assessment Letter for Palo Verde Nuclear Generating Station, Unit 1, 2, & 3 (IR 05000528-11-001, 05000529-11-001, 05000530-11-001, on 02/03/2011) | |
ML110490540 | 3 March 2011 | Correction of Typographical Error in Safety Evaluation Report Related to License Renewal (TAC Nos. ME0254, ME0255, and ME0256) | Earthquake |
ML110730166 | 2 March 2011 | Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification No. AMZDFX082 | |
ML110600860 | 1 March 2011 | Notification of Inspection (IR 0500529-11-003, on 04/11/11 - 0122/2011) and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML110670169 | 28 February 2011 | NRC Problem Identification and Resolution Inspection Report 05000528-10-008, 05000529-10-008, 05000530-10-008, and Notice of Violation, Dated January 28, 2011 | Hydrostatic Condition Adverse to Quality Significance Determination Process |
ML110600616 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 09/09/2010 | |
ML110600613 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/29/2010 | |
ML110600620 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/11/2010 | |
ML110600630 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/18/2010 | |
ML110600596 | 25 February 2011 | Single Positive Test Form, for Random, Collected on 05/05/2010 | |
ML110600641 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/15/2010 | |
ML110600640 | 25 February 2011 | Single Positive Test Form, for Followup, Collected on 08/25/2010 | |
ML110600639 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/15/2010 | |
ML110600636 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 03/29/2010 | |
ML110600634 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 02/04/2010 | |
ML110600631 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 08/23/2010 | |
ML110600600 | 25 February 2011 | Single Positive Test Form, for Random, Collected on 08/24/2010 | |
ML110600614 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 09/15/2010 | |
ML110630346 | 25 February 2011 | Distribution of the Final Plant-Specific Supplement 43 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station | License Renewal |
ML110670168 | 25 February 2011 | Correction to Response to Request for Additional Information for the Review of the PVNGS License Renewal Application (Lra), and LRA Amendment No. 30 | |
ML110600598 | 25 February 2011 | Single Positive Test Form, for Cause, Collected on 04/05/2010 | |
ML110600605 | 25 February 2011 | Single Positive Test Form, for Pre-Access, Collected on 04/06/2010 | |
ML110600629 | 25 February 2011 | Single Positive Test Form, for Random, Collected on 11/09/2010 |